-
AF
Acceleration factor
ALT
Accelerated life test
ANOVA
Analysis of Variance
AOQL
Average Outgoing Quality
Level
APO
Auto Power Off
APQP
Advanced Product Quality
Planning and Control Plan
ARE
Area Options
ASIC
Application Specific Integrated
Circuit
ASSP
Application Specific Standard Part
ATE
Automatic test equipment
ATO
Assembly To Order
AVL
RFQ IMPUT
CHECKLIST
里面用到
BAC
Backup
BCI
Bulk current injection
BD
Business Developer
BFR
Batch Failure Rate
bo
Bochum
BOM
Bill of Material
BU
Business
Unit
c
acceptance
level
(=
number
of
failed
components
accepted)
CBD
Cost Break Down
CDM
Contract Design
Manufacturer
CDM
Charge Device Model
–
discharge type
CDM
Original Design done by Partner specifically to
support Nokia
CDN
Coupling and Decoupling Network.
CE
Concurrent Engineering
CE
Concurrent
Engineering (used for product development)
CE. E0...E5
Concurrent Engineering
(CE) Product Program
Milestones
CEM
Contract Electronic
Manufacturer
CER. FILTERS,
MONOBL. DUPLEXERS
Powder
mixing, Block
pressing, Firing
CI
Capacity
Implementation
CIM
Custom In
Mould
CLUSTER
Group of companies, head
by one Cluster leader
CM
Cost
Management
CMO
Customer & Market
Operations
co
Copenhagen
COC
Certificate
of compliance
COO
Country of
Origin
Cp, Cpk
Process
Capability indices
Cpk
Capability
Index
CPL
Cost Part list
CQE
Component Quality
Engineer
CQP
Component Quality
Planning
CQS
Component Quality
Specialist
CR
Change Request
CRR
Component review report
CRYSTALS
Crystal wafer manufacturing
CSA
Current State Analysis
CSM
C-TPAT
Customs-Trade Partners
Against Terrorism
CTS
Cost Target
Setting
D
Draft, first version of
the document
da
Dallas
DC
Direct
DC
Direct Current
DCN
Design
change notice
DES
Deselect all
DFA
Design For
Assembly
DFBA
Design for Board Assembly
DFDS
Design for Demand Supply
DfE
Design for Environment
DFFA
Design for Final Assembly
DFM
Design
For
Manufacturing
(includes
DFPT,
DFBA,
DFFA)
DFMEA
Design Failure Mode and
Effects Analysis
DFPT
Design for Production Test
DG
DI-EL.
DUPLEXERS
Resonator preparing
DIR
Design Improvement Reports
DocMan
Type of Lotus Notes
database (for documents)
DOE
Design Of Experiment
DOE
Design Of Experiment
DPM
Defects Per Million
DSB
Demand
Supply Balance
DSN
Demand
Supplier Network
DUT
Device Under
Test
DV
Demand Volume
DVR
E0...E5
Concurrent Engineering (CE) Milestones
E0..E5
Concurrent engineering (CE) milestones
ECN
Engineering Change Notice
EFR
Early Failure Rate
ELMECH
Electro Mechanical
EMC
Electro Magnetic
Compatibility
EMI
Electro
Magnetic Interference
EMS
Environmental Management Sys-tem
EN
European Norm
EoL
End of Life
EPA
ESD protected area
ERP
es
Espoo
ESD
Electrostatic discharge
ESDS
ESI
ETA
EUT
EV
EVM
F
FA
FAC
FAQ
FAI
FEM
FFR
FIL
FIML
FIT
FMEA
FOR
FOT
FR
G.A.
Gauge R&R
GCPM
GD&T
GRP
GRR
HBM
HBM
HCP
HIGH
hk
HUB
ICDR
ICDR
ID
Electrostatic discharge sensitive device
Early Supplier Involvement
Estimate to be arrive
Equipment Under
Test
Enclosed volume
Enhancements Version Management
Final,
document to be archived
Fully anechoic
chamber
Frequently Asked Questions
First article inspection
Finite Element Modelling
Field Failure
Rate
Filter..
Fabric
Inmold
Labeling,
same
with
CIM
Custom
In
Mould
Failures in Time
Failure Mode and Effect Analysis
第一次试模
Failure
Rate
General Assembly
Gauge
Repeatability and Reproducibility
Geometrical Dimensioning & Tolerances
ground reference plane
Gauge Repeatability and Reproducibility
Human Body Model
Human Body Model
–
discharge type
horizontal coupling plane
Highlight
selected
Hong Kong
Warehousing and Shipping functionality
location
Integrated Circuit Design
Reviews
IC
Design Review
Failure Analysis
Industrial Design
IFR
Intrinsic Failure Rate
IMD
Insert Mold Decoration
IME
Inject Mold Equipment
IML
Insert Mold Labeling
IML
IN MOLD LABELING
IPQC
In Process Quality
Control
IPR
Intellectual Property
Rights
ISO
International
Standardization Organization
jk
Jyv?skyl?
JR&D
KCR
KO
LA
la
LAB
LCL
LL
LRVP
LSL
LSSE
M&O
M/C
M3
MAR
MAR
’
s
MatCoMa
MC
MD
MDF
MDFs
ME
MECH
MFI
MIS
MM
MOR
MOSS
MPL
MPL / M
MPL/MPM
MPM
MR
MRP
Ⅱ
MS
Joint Research and development
Key
Component Review
Los
Angeles
Label
Lower
Control Limit
Lesson Learned
Long Range Volume Plan
Lower Specification Limit
Light SW Subcontractor Evaluation
Mechanics & Outsourcing
machine
Global quality database
Mechanics Acceptance Report
Mechanical Acceptance
Report
’
s
Material Data Form
material data forms
Mechanics
Melt flow index
Machine
Model
–
discharge type
Monthly Operation Review
Visual Quality Criteria
’
s
procedure
Material Project Leader
Material
Project Leader / Manager
Material Project Leader/ Manager
Material Project Manager
Kick Off
License Agreement
Measuring
Centre
Mechanics Desgin
Manufacturing Engineer
Measurements Report
Manufacturing Solutions
-
-
-
-
-
-
-
-
-
上一篇:PPAP要求
下一篇:(抽样检验)AQL抽样表