关键词不能为空

当前您在: 主页 > 英语 >

模具专业外贸英语大全

作者:高考题库网
来源:https://www.bjmy2z.cn/gaokao
2021-02-12 03:37
tags:

-

2021年2月12日发(作者:lax)


wylwyl



VIP


会员






来自



江苏



状态



离线




#4



使用道具



发表于



2007-7-7 10:05


资料



个人空间



个人短信



加为好友



只看该作者





21




我们将尽力达成你的计划,如有异常,会及时通知你。



We will try our best to complete your plan, if there are any complications, we


will notify you




immediately.



22.


这个产品的长度为


330.12MM,


宽度为


78.96MM,


高度为


45M M.


胶厚为


2MM,


重量为

< p>
70.63g,


试模注塑机型号为


250



,



胶料颜色为黑 色


,


产品外表




面晒纹处理


,

内表面为抛光


.


需要日期章、环保章、材料章


.


前后模用


2344



硬,斜顶和行位座用


738H


,以上模具< /p>




信息正确吗?请确认!




thickness is 2MM, weight is




70.63g, the injection machine is 250T,the material is black, the outside of


the part has texture,




inner side needs polishing, and it also needs a date and recycle stamp,




the core&cavity is 2344 nitridng, the lifter and slider shelf is 728H. Please


check the information




above!


23

< br>.



现在到了吃午钣的时间,我们下午再继续好吗?



It is time to have lunch, let's discuss this project later this afternoon?


24.< /p>


和滑塊干涉的倒勾請加料填平至滑塊可以順利滑動



(The undercut area interferes with the slide block and needs to be filled with


material to help the




slider move smoothly.)


25.


加肉太多




(The thickness added is too thick.)


26.


加肉面積太大



(The thickening area is too wide.)



位置移位



( The gate position is moved.)


28.


滑塊拆的位置



(The split line of slide block or the area of slide.)


29.


此處有尖角,填充困難



(It is hard to fill this area due to the sharp


feature.)


30.


此處鋼材太薄,強度不足而且不容易冷卻



(The strength of this area is too weak and it is hard to cool because the steel


is too thin.)


31.


圓柱特徵要有一半圓不可以拆在滑塊上,以免粘滑塊造成拉白,拉斷



(We avoid designing the semicircle of the cylinder on the slide block because


it will be pulled




apart or cause drag marks.)


32.


此處做斜銷在作動時會削到成品肉厚



(The part will be damaged if we make the lifter in this area.)


33.


這個面是裝配面,不能加料



(This is a critical surface where we cannot add additional material.)


34.


此處料位太厚,會有縮水,建議減料改善



(Because of the shrinkage of the thickness, we suggest reducing some wall


thickness to improve it.)


35.


此面是不是外觀面,此處做滑塊的話會有夾線,是否可以接受




it is acceptable to




have a slide



split line if we have a slide in this area. )


36.


此處有倒勾,能否減料,使公母模靠破,不做滑塊和斜銷




an undercut as indicated




to have shut off


on cavity side. No slide block and lifter will be made. )


37.


請盡快確認這種拆模方式和結構,否則會影響模期



(Please confirm the issues of Parting line, Gate position...Etc. as soon as


possible




otherwise,




the lead-time will be extended.)


38.


此面是否有特殊要求,能否有頂針印



(Please confirm whether it is a critical surface or not and if we can have E.J.


pin marks on it.)


39. P.L


面開在此處,模具上會有尖角和刀口,對模具壽命有影響



(There are sharp edges if we set the parting line here, It will reduce the tool


life)


40.


加大拔模角,以便脫模順利



We suggest enlarging the draft angle to


help release the tool.)




报告




wylwyl



VIP


会员






来自



江苏



状态



离线




#5



使用道具



发表于



2007-7-7 10:05


资料



个人空间



个人短信



加为好友



只看该作者





41. GATE


做在此處的話有兩 個缺點:


1.


蓋子打開時可以看到


GA TE


的修剪部


位。



2.


兩個斜銷在同一側,頂出也不是




很平衡


.


(There are two problems if the gate is to be designed in this area:


a). It is easy to see the gate mark when you open the cap.


b). The ejectors are unbalanced when two lifters are on the same side)


42. G ATE


做在此處的話


.


蓋子打開後看不 到


GATE


的修剪部位



(The gate mark is not visible if the gate position is designed like this.)


43.


如果


GATE


一定要做在你們指定的位置的話,那還不如做在這一側,這


樣的話還可以減小這 個位置的縮水




we would further




recommend to have



it to the area indicated so it can avoid a shrink problem in this area.)


44.


在此處


GATE


做潛頂針的話,背後的外觀面會有沖料痕,而且成品又是


黑色的 ,會最明顯



(If the design of the gate has to be a sub. Gate, then the back surface of the


part will have




serious flow marks due to the black colour.)


22. P.L


開在 此處不合理,模具加工困難,


P.L


應改為和圖示的一樣




more complicated






therefore,



we recommend to have the Parting line as indicated.)


45


。产品粘母模的機會很大, 能否在公模加倒勾,拉料頂針或者公模保留


E.D.M


紋,開模 時使成品留在公模一側






therefore, please confirm whether it


can make undercuts,




snatch pins


or leave coarse E.D.M. on the core to snatch the part on)



46.


此處料厚段差很大 ,成品表面會有應力痕,是否接受



(Please confirm whether it is acceptable to have stress lines on the surface


because the thickness




is not equal.)


47.


請注明何處為外觀面,能否 提供


2D


圖和注意事項



(Please advise where the critical surface is. Please also provide us a 2D


drawing with critical




dimensions. )


48.


紅色所示處是有問題的地方,請特別注意



(Please note the red highlights because those areas have problems.)


49.


成品設計此處有問題,建議如下圖所示修改



(We would suggest using the attached part design as the current design has


problems.)


50.


此處改為一個球形的凹槽



(We suggest modifying it as a globe recess.)




报告




wylwyl



VIP


会员






来自



江苏



状态



离线




#6



使用道具



发表于



2007-7-7 10:06


资料



个人空间



个人短信



加为好友



只看该作者





51.


圓柱特征要有一半不可以拆在滑塊裡,以防拉斷



(this issue is the same


as no.8)


52.


此處大滑塊上走小滑塊,小滑塊要先退,大滑塊要做延遲



(The inside small slide block will recede first and the parent slide block have


to postpone




sliding.)


53.


滑塊要用液壓油缸抽芯以保証開合模順序



(The slide pins will use an oil cylinder to assure that the process is in proper


order.)


54.


這個面有裝配,加料的話裝配時會頂住,如圖所示




the two parts when it is




assembled.



Please see the sketch attached. )


55.


可降低斜銷面,增加成品些許肉厚來做變化



(To descend the surface of lifter in order to thicken the part.)


56.


一半做斜銷,一半做自然



(One half side will have the lifter and the other


half will be




solid/nature.)


57.


此處兩個柱子重疊,有倒勾,不能做自然,要做


SLIDE



made as solid. We


suggest making it with a slide block.)


58.


此處強迫頂出



(This area needs force ejection.)


59.


公模兩段開模,


這個地方先退



(Here will be a double ejection for forward


and receding.)


60.


此處做鑲件會有夾線,能否接受



Please confirm whether it is


acceptable that there will be a




split line here.)




报告




wylwyl



VIP


会员






来自



江苏



状态



离线




#10



使用道具



发表于



2007-7-7 10:08


资料



个人空间



个人短信



加为好友



只看该作者





All in English& Imperial Unit


全部使用英文和英制单位



Are part dimensions to print plus shrink?


请检查内模尺寸有否乘缩水


?


All wires protected from sharp corners< /p>


?凡有电线通过的角位要改为


R


角,


是否完成?



All replaceable components must be standard components .


所有替换的元件


必须是规范件。



Add shot counter?


是否加啤塑总计器?



A complicated mould with thorough design consideration to overcome the


numerous design contraints.


一个复杂的模具,设计经过周详考虑,成功地克服了各种设计上的限制。



All moving components should use hardened steel : all slides should be


installed with hardend or




lubricated alloy wear plates and gibs, and with positive slide retainer.


所有移动的零件应使用硬钢料,行位必须用硬垫板和硬线条,而且必须有限


位及定位锁。





报告




wylwyl



VIP


会员






来自



江苏



状态



离线




#11



使用道具



发表于



2007-7-7 10:09


资料



个人空间



个人短信



加为好友



只看该作者





BOM including water fittings,ejectors&custom


的内容应包

含运水接头


,


顶针和自制的零件


.


BeCu for lifters if w/o water circuits


。若没有运水回路,斜顶为铍铜。




Corresponding components mirrored at core&cavity


对应的部件在前、后模


平面视图中镜像



Check polish for line of draw finish


?有否省光就出模


?


Core pull slot mechanism installed and O.K.


Crane capacity and loading clearance.


模具须用多大吊机才可搬动。



Conduct moldflow &mold warp analysis.


经流道及变形电脑模拟分析。



Component and/or 3D mould design drawin g.


散件图或


3D


模具图



Cooling less important when dimensions are not important.


若尺寸不重要,


适量冷却也可。



Combine a traditional 4 cavity edge gate and a 4 cavities reverse gate mould


which help to double




the moulding capacity and reduce production cost.


将一 个规范四模腔大水口模具与一个四模腔倒转大水口模具结合成为一套可


于同一大小的注塑 机,生产量可增加




一倍的层板模具,并且可降低成本。



Can be seperated into two individual moulds for moulding in two different


mould shops.


此模具最大的特式是,可将模具分 开变成两套,在不同地方生产,增加生产


的灵活性。



Consists of all standard mould components which facilitates mould


maintenance.


由于全套模具均利用模具规范零件 制成,在维修及换零件上比较方便。





报告




wylwyl



VIP


会员






来自



江苏



状态



离线




#12



使用道具



发表于



2007-7-7 10:09


资料



个人空间



个人短信



加为好友



只看该作者





Die draw called out


出模方向的标示



Dimension all the opening , travel & cl earance


标出前、后模距离,滑动部


件滑动距离和塑件脱 离的位置



DME egr. Water fittings recessed and marked?


是否使用


DME< /p>


运水接头及编



?


Delivery right side up , or in two halv es


?开箱后是否容易吊出模具及是否分


开前

< br>/


后模运输?



Eyebolt size and balance in 2 sides


吊模孔尺寸,平衡,


4


边都要有



Ejection stroke & slide, lifter travel dimensioned


出行程、行位、斜顶行程的


标注。



Ejection study if lifter adopted


若有斜顶,做出分析。



Ejection extended at the most


顶出到极限位置



Ejector guide pins installation .


顶针导柱的安装。



Eyebolts for inserts more than 50lbs.


重量大于


50lbs


的镶件必须要有吊模孔 。



Edge gate or sprue gate requiring secondary operation acceptable.

边缘型或


直入型水口都可以接受。





报告




wylwyl



VIP


会员






来自



江苏



状态



离线




#13



使用道具



发表于



2007-7-7 10:09


资料



个人空间



个人短信



加为好友



只看该作者





4 point in HRC different to lifters contacting or cavity steel


。斜顶和与 其接


触的内模或镶件在硬度上





4


度的差别(


H RC


)。



4X size section , dimensioned to reflect the actual size.< /p>


水口及水口顶针的


4


倍放大视图,按实际 尺寸标




注。




General ,safety and handling


常规、安全和搬运要求



Guided ejection recommended for mould above 100 tons clamp capacity,


ejector pins of 1.5mm or




smaller, or ejector stroke longer than 50mm.


建设模具用于 锁模力超过


100


吨的注塑机,或有


1 .5mm


以下的顶针或顶出


行程超过


5 0mm


时,应装上顶针板导柱。



Guide pin cleared and vented?


边钉插入模板有否顶着及加疏气空


?




报告



-


-


-


-


-


-


-


-



本文更新与2021-02-12 03:37,由作者提供,不代表本网站立场,转载请注明出处:https://www.bjmy2z.cn/gaokao/640876.html

模具专业外贸英语大全的相关文章