QUALITY MANAGEMENT REVIEW


管理评审报告



Meeting Date :



May-15, 2009



Time
















:




4:30PM



2:00PM-




Chairperson :






Attendees:






Venue













:




DG office


5Bconference room



Minutes



This management system review covers all XXXXXfunctions, including the Chemical-lab and


Microbiological-lab.




1.



Review the suitability and effectiveness of quality system




A.




External-Assessment Results



The external assessments have not been conducted through CNAS until the application documents


have been gone through and the laboratory audited by the CNAS auditors. CDLL chemical


laboratory has been certified as ISO17025 requirement by SGS-CSTC Standards Technical Services


Co., Ltd. from Dec-08, 08 to April-29, 09, training program of total 11 days divided to 11 sections


including US / EU Standard Methods training, Laboratory staff technical training, ISO-17025 system


set up and SOP documents written up, the meeting record referring to CDLL/A-13-02 of


程序文件


.



B.




Internal Audit




The internal-audit had been conducted by the CDLL laboratory Manager on April-30, 2009, the report


has been summarized the control and set straight of Chemical Lab and Microbiological Lab running


system per ISO-17025 criteria. All the correction actions is taking place and will be closed the end of


May, 09’


. The audit focus on the following:



1.



Corrective action on technical deficiency from staff were not trained and set back full skill on


test methods compliance with ISO-17025 to fulfill the applied EU / US testing


requirementfrom CNAS-AL-01-02shown.


2.



Complete the


程序文件


CDLL/A-



00-29



records for Chemical and Microbiological


laboratory and make sure to continue assess from time being when necessary to keep record.



The internal audit


内审


was cooperated with SGS auditor, Henter Huang, throughout the above 11


sections set time and the corrective actions had been done in time and accept by auditors. The internal


audit


内审



report is referring to CDLL/A-11-03 of


程序文件


CDLL/A-


< p>
00-29



.






C.



Proficiency Test


能力认可


and internal Correlation programs



Proficiency Test (PT):


The lab had finished all the 2 rounds PT tests in 2009, including 2 major category EN71 and RoHS


requirement that were organized by CNAS authorized ____________ PT was


highlighted and taken corrective action by P-lab.



The action report No. is ____________ with report


received on _________ and the results were match and pass with their set data from their given samples.




External-lab correlation testing (IQC):


The lab had taken part in a lot of correlation tests including RoHS and 6 Phthalates during 2008-


09’


.The


results are satisfied (see the following summary):




No.


Name of RRT


1


2


3


CDec 06


Cadmium-001


CANON


Inter-lab correlation


4


exercise Jan 2007 -


Softline


5


SGS-BFR-PAT-011



RSTS TW


Apr.,2007


RSTS HK


Mar,2007


Initiator


RSTS



Guangzhou Lab


Japan lab


End


Jan. 2007


Jan. 2007


Jan. 2007


Lab list


SZ, GZ,


SH, …



GZ, SZ


SZ, GZ,


HK, …



description


total heavy metal content of fabric


sample


Cadmium content in Rubber


material.



Pb/Ni+P in plating on Ni/SPCC


sample


Phthalates & Azo dyes test in


standard solution and samples



PBBs&PBDEs in standard solution


and samples






SGS-HM-PAT-012


6


(RoHS) /


SGS-ELV-PAT-001


(ELV)



7


8


Nintendo Round Robin


Test



EE/HL/SL 0708


Japan lab


RSTS


Jun. 2007


Aug,2007


RSTS E&E



May, ,2007




Heavy metal testing












phthalates content in pellet &


powder by Nintendo method


phthalates


Heavy metals (Pb, Cd, Hg, Cr)


PBBs & PBDEs


RoHS 6 items



ASTM F963-07,Canada


Crc.931BS7272-1,2


9


RRTP-0701


Physical & Mechanical,


Flammability Test




Nov.2007


10


SH-HG



Nov 2007


HG,HK



Internal Comparison Test from Technicians



Comparison tests were completed and continue monthly according to the record on ______ throughout


year 2009 May. The reference standard _________ were used as a correlation subject to be tested by 3


technicians in laboratory.











D.



Complaints & feedback from customers:



In _____ 2009, there wasone complaint received from the client xxxx. The case was on that the


laboratory report, which cannot meet with the


client’s requirement


and the record is filed on


CDLL/A-


06-01.


Our laboratory executive has taken relevant immediate corrective actions and the client end


up accepted correction. To meet with our inner management requirement, corrective action was


verified further through customer satisfactory survey which referring to the record on CDLL/A-06-02


客户抱怨登记表


and CDLL/ A-23-01


报告更改


/


补发申请表





E.



Corrective and preventive actions initiated


The lab can taken corrective action for SGS


raised external & internal audit, client’s complaint /


claim and unsatisfied results coming from comparison test in time. The individual


程序文件



regarding to preventive actions had been issued,



and the preventive action plan need to be made in


next lab meeting by 31


st


, May 2009.



F.



Inner Quality monitor



results


All the lab quality monitors have been assigned and trained. The physical-lab and electrical-lab have


issued the Inner Quality monitoring schedule and the relevant monitoring have been implemented


-


-


-


-


-


-


-


-