1
、
Stop
the pumps for a flow
check
.
停泵观察。
2
、
Have you checked all the equipments?
设备都检查过了吗?
3
、
We’
ve checked them, no
problems in running.
检查过了,运转是没有问题了。
4
、
How
much high viscosity mud move you mixed?
高粘度泥浆配备了多少?
5
、
About 160 cubic meters.
大约
160
方。
6
、
Speed up. Please!
请快点干!
7
、
Reverse out the drill
pipe
.
反循环清洗钻杆
8. How
long to circulate before pulling out?
循环多长时间再起钻?
9. Report at once if any unusual case
occurred.
如有特殊情况,要马上报告。
10.
See if any mud overflow on the screen.
观察振动筛有无跑泥浆现象。
11.
There is an overflow screen.
振动筛跑泥浆了。
12. We need to change the screen at
once.
现在需要马上换筛布。
13. Is the screen to be
changed?
要换筛布吗?
14
. The screen
needn’t changing.
不用换筛布。
15. Record it carefully.
认真作好记录。
16
. Don’t make false record.
不许作假资料。
is a false record.
这资料有假。
21. Check the
fluctuation of mud level whenever 20 strings
pulled out.
每起钻
2
0
柱,要核对泥浆的升降情况。
22. Is there any fluctuation of mud
level?
有泥浆升降变化吗?
23. Please help to clean the mud tank.
请帮我将泥浆罐清洗干净。
24. Fill up the tank with
water, then prepare the mud.
罐内放满水后,配泥浆。
25. Is the tank filled up with water?
罐内放水满了吗?
77. The tank isn’t filled
up with water yet.
罐里还没灌满水呢。
ion!
take care!
注意!注意!
the mud engineer in time of mud
property changed.
泥浆性能如有变化,及时通知泥浆工程师。
155.I’ve told the mud
eng
ineer.
我已经告诉泥浆工程师了。
The
fluid rate into the well is to be measured
accurately.
准确计算入井液量。
Display
the mud in the wellbore with fresh water down the
tubing and circulate
the
well.
用清水正替换井筒泥浆,洗井。
61. Measure the density of the mud.
测量泥浆密度。
62. The fresh water is used
as spacer.
清水作隔离液。
63. Circulate the well reversely to
wash the remainder of the cement slurry out of
wellbore.
反循环洗井,洗出多余水泥浆
1.8
Have you checked all the
mud equipments.
泥浆设备都检查过了吗?
How
is the borehole now?
井下情况怎么样?
74. Please help to clean the mud tank.
请帮我将泥浆罐清洗干净。
Start the circulation.
开始打循环。
Shall we start the
circulation?
开始打循环吗?
Don
’
t
start now.
先别开始。
Make a connection.
接单根。
3.I worry about the mud.
我担心泥浆有问题。
’t worry.
不用担心。
Measure the density of the mud.
测量泥浆密度。
7.13
L.C.M. has
been added into the mud, tell the derrickmen to
stop the shale
shaker.
泥浆中已加入堵漏材料,叫甲板工关掉振动筛。
The hole is kicking!
井涌啦!
7.1
The down-hole problems are
very complicated.
井下情况很复杂。
7.2
We have
gotten overpull while tripping out.
起钻遇卡。
7.3
The hole is
tight while running in.
下钻遇阻。
7.4
The
formation is unstable and the well caving are
severe
地层不稳定,井塌严重。
7.5
There are no mud returns while
circulating.
循环时没有泥浆返出。
7.6
The pit
level has lowered quickly.
泥浆池液面下降很快。
7.7
The hole
lost returns.
有进无出。
7.8
Where is the
thief zone?
漏失层在哪里?
7.9
Pump(Spot)
the lost circulation
materials (L.C.M.) into the hole.
6.4
Change it with a 40 mesh
screen.
换成
40
目筛布。
6.5
The actual mud density
required will depend upon existing hole
conditions.
实际的泥浆密度将取决于当时的井下情况。
6.6
The low gravity solid's content should
be under 5% by volume in the mud.
要将泥浆中的低固相维持在
5
%
(
体积比
)
以下。
6.7
All solids control equipment should be
run efficiently in drilling.
钻井时,所有的固相控制设备应该有效地运转。
6.8
The MBT of this system should be kept
below 25 ppb.
应该将泥浆中的
MBT
值保持在低于
25
ppb
。
6.9
Adding 20
tons Barite to raise mud weight of this pit to the
1.20 S.G.
加
20
吨重晶石将这池泥浆的密度提到
1.20
S.G.
。
6.10
Clean the
settling pits. (Dump the sand trap.)
清洗沉砂池。
6.1
Start the
shale shaker.
启动振动筛。
6.2
Then start
the desander and desilter.
然后启动除砂器和除泥器。
6.3
Shut off the
degasser and centrifuge.
关掉除气器和离心机。
5.12
Collecting the drill
cuttings at the shale-shaker.
到振动筛处取点钻屑来
9.1
Checking the mud test
equipment in the pilot test kit.
检查仪器箱中的泥浆试验设备。
9.2
Use the mud
balance to determinate the mud weight.
用泥浆比重计测出泥浆的密度。
9.3 The Marsh Funnel (Viscometer) is
used for routine viscosity determinations.
马氏漏斗用作日常泥浆浓度的测定。
9.6
Get the mud
sample under the shale-shaker.
在振动筛处取样。
tell the
derrickmen to clean the mud pits.
告诉甲板工去扫泥浆池
up
the tools and then put them in order.
把仪器清洗干净后排好。
Take
a little bit mud from the mud pit.
到泥浆池内取点泥浆来。
5
bottles of the mud sample should be taken.
泥浆采样必须取五瓶
I am
taking mud sample.
我正在取泥浆样品。
It is the mud sample taken while the
gas logging was abnormal.
这是在气测异常时取的泥浆样。
It
may be a kick ,because the volume and flow rate of
drilling fluid in the pit
increased.
泥浆池的体增大,流量增大,可能是井涌。
66. Do you report to the
drilling supervisor?
你通知井监督了吗?
We test
trip gas at every trip.
每次起下钻我们都要进行后效测量。
92. The reservoir situation can be
mastered after testing trip gas.
测后效可掌握储层情况。
Attention should be paid to cuttings
lag time.
请注意岩屑迟时
cuttings should be caught on time.
及时捞取岩屑。
Are you ready for spud in at 8:00 this
evening?
今晚
8
点整开钻你们准备好了吗?
is the second spud now.
现在是二开
.The
drilling tool should be measured precisely.
请准确丈量钻具。
Look for you
寻找你
With pit add
补充几号池
We need a
simultaneous interpreter.
我们需要一个同声翻译。
We
communicated through an interpreter.
我们通过传译员交流。
返回太少:
Mud return is few
水太少:
Water is little.
抓紧:
firmly grasp
请看记录:
Please read the record
没作记录:
No record
加化学药品:
put in chemicals
加高岭土粉:
put in koaline powder
加云母片:
put in mica sheet
加增粘剂:
put in viscosifier
加稀释剂:
put in diluent
(thinner)
加稳定剂:
put in
stabilizer (stabilizing agent)
加烧碱:
put in caustic soda
测定比重:
v. measure
gravity
,
n. gravity test
测定失水:
test
filtration
,
measure water
loss
测定切力:
measure shear
force
开关:
switch
压井管线:
kill line
入口:
inlet
出口:
outlet
演习:
drill
消防演习:
fire drill
防喷演习:
BOP drill
压井泥浆比重
kill mud weight
作业指令:
working instruction,
operation onstruction
起钻:
POOH = pull out of the
hole
下钻:
run in the hole
起下钻:
make a trip
-
-
-
-
-
-
-
-
-