work section: foundation and main structure












work item: steel work


Disclosure item: matters need attention when steel being cut and bound



Disclosure content:


1.



φ


10



φ


8



φ


6.5


steel


should


be


straightened


before


to


be


cut


with


steel


straightener. Workers should operate steel straightener as per operating instruction,


avoiding to be hurt by steel



s re-bounce.



2.



Workers


should


operate


cut-off


machine


and


bending


machine


as


per


operating


instruction.


During


bending


and


transportation,


workers


should


pay


attention to if the steels are bended tightly to avoid hurting others.




Check the executive condition: GOOD































work section: foundation and main structure







work item: welding machine


Disclosure item: safety operation



Disclosure content:



1.



Welding


machine


should


be


stored


in


dry


and


well


insulating


condition.


Check if first and second insulated wires are in good condition, if there is a shield on


wiring


section,


if


electrode


holder


is


in


good


condition


and


if


null


line


works


at


connecting section. After checking and verifying there is no hidden danger, welding


machine can be used.



2.



Workers


should


take


insulating


measure


when


they


work


in


wet


condition,


such as in gutter, pipe and boiler. They can use insulating board or rubber and wear


insulating shoes. Work surroundings should be well ventilated.





3.



Operators should wear insulating glove and insulating shoes when they


are


welding.



Shelf,


rail,


pipe


steel


and


another


conductor


are


forbidden


to


connect


welded object. Copper wire is allowed to connect welded object.



4.



Operators


should


have


operating


certificate.


Available


fire-fighting


equipments


should


be


around


working


place,


with


pro


staff


in


charge


of


this


equipment. Keep inflammable far away form welding work section. Make sure no fire


can be make by splashing spark.



5.



Cut off power supply before removing holder line. Workers can not climb up


with holder line.



6.



When work finishing, workers should cut off power supply and check work


place, making sure that there is no hidden danger. They could leave after that.




Check the executive condition: GOOD





















Work section: foundation and main structure








work item: concrete work




Disclosure item: concrete work


Disclosure content:


1.



Transport


concrete


to


casting


concrete


work


section


with


tower


crane.


Lift


van should be stopped at 200-300mm above floor. Concrete should be casted slowly


in case of frame fall apart.



2.



Workers should follow operating instruction when they vibrate concrete. Plug


vibrator into concrete quickly and extract it slowly. Workers should follow operating


instruction when they use planar vibrator.


3.



Workers should check frame during and after casting concrete. If descending


happen to frame, worker should fix it in time.




















Check the executive condition: GOOD
































Work section: foundation and main structure









work item: site mix work


Disclosure item:


Disclosure content



1.



Workers who join in this construction should have a good knowledge on their


own safety technical operating specification. During operating, workers should work


seriously. Operating after drinking is forbidden.



2.



Machinist must receive training, pass relative examination and get operating


certificate so that they can operate machine independently.


3.



Workers


should


use


protective


equipment


and


safety


protective


facility


in


right way. Everyone must wear safe helmet when he enter into site. Baring feet and


wearing slipper are not allowed on site. Safety belt must be used when worker work at


some high section. Entrance and exit should be covered by protective shed or others


insolating


facility


when


workers


are


involved


with


each


other


at


the


same


time.


Protective


rail,


baffle


and


safety


net


should


be


fixed


above


3


meters


from


ground.


Regular check helmet and safety net.



4.



Safety sign and caution plate should be fixed on scaffolding. They can not be


removed unless construction crew allow removing.



5.



Traffic signs should be fixed on site.



Da ngerous



or



caution



sign should


be fixed at some dangerous places.




Check the executive condition: GOOD

























Work section: foundation and main structure




work item:



Disclosure item: season work


Disclosure content:



1.



Before and after storm, workers should check temporary facility, scaffolding,


electromechanical equipment and temporary circuit. If leakage of electricity, leakage


of rain, lean, deformation and sinking are found, workers should mend and fix them in


time. Serious problems must be solved immediately.



2.



Roads on site should be maintained well.



3.



Workers


should


take


ventilating


and


cooling


measure


when


their


work


surroundings is too hot to work.



Check the executive condition: GOOD

































-


-


-


-


-


-


-


-