work section: foundation and main structure
work item:
steel work
Disclosure item: matters
need attention when steel being cut and bound
Disclosure content:
1.
φ
10
、
φ
8
、
p>
φ
6.5
steel
should
be
straightened
before
to
be
cut
with
steel
straightener. Workers should operate
steel straightener as per operating instruction,
avoiding to be hurt by
steel
’
s re-bounce.
2.
Workers
should
operate
cut-off
machine
and
bending
machine
as
per
operating
instruction.
During
bending
and
transportation,
workers
should
pay
attention to if the steels are bended
tightly to avoid hurting others.
Check the executive
condition: GOOD
work section: foundation and main
structure
work item:
welding machine
Disclosure item: safety
operation
Disclosure
content:
1.
Welding
machine
should
be
stored
in
dry
and
well
insulating
condition.
Check if first
and second insulated wires are in good condition,
if there is a shield on
wiring
section,
if
electrode
holder
is
in
good
condition
and
if
null
line
works
at
connecting section. After
checking and verifying there is no hidden danger,
welding
machine can be used.
2.
Workers
should
take
insulating
measure
when
they
work
in
wet
condition,
such as in
gutter, pipe and boiler. They can use insulating
board or rubber and wear
insulating
shoes. Work surroundings should be well
ventilated.
3.
Operators
should wear insulating glove and insulating shoes
when they
are
welding.
Shelf,
rail,
pipe
steel
and
another
conductor
are
forbidden
to
connect
welded object.
Copper wire is allowed to connect welded object.
4.
Operators
should
have
operating
certificate.
Available
fire-fighting
equipments
should
be
around
working
place,
with
pro
staff
in
charge
of
this
equipment. Keep
inflammable far away form welding work section.
Make sure no fire
can be make by
splashing spark.
5.
Cut off power
supply before removing holder line. Workers can
not climb up
with holder line.
6.
When work finishing, workers should cut
off power supply and check work
place,
making sure that there is no hidden danger. They
could leave after that.
Check the executive condition: GOOD
Work section: foundation and main
structure
work item: concrete work
Disclosure item: concrete
work
Disclosure content:
1.
Transport
concrete
to
casting
concrete
work
section
with
tower
crane.
Lift
van should be stopped at 200-300mm
above floor. Concrete should be casted slowly
in case of frame fall apart.
2.
Workers should follow operating
instruction when they vibrate concrete. Plug
vibrator into concrete quickly and
extract it slowly. Workers should follow operating
instruction when they use planar
vibrator.
3.
Workers should check frame during and
after casting concrete. If descending
happen to frame, worker should fix it
in time.
Check the executive condition: GOOD
Work section:
foundation and main structure
work item: site
mix work
Disclosure item:
Disclosure content
1.
Workers who
join in this construction should have a good
knowledge on their
own safety technical
operating specification. During operating, workers
should work
seriously. Operating after
drinking is forbidden.
2.
Machinist must
receive training, pass relative examination and
get operating
certificate so that they
can operate machine independently.
3.
Workers
should
use
protective
equipment
and
safety
protective
facility
in
right way. Everyone must
wear safe helmet when he enter into site. Baring
feet and
wearing slipper are not
allowed on site. Safety belt must be used when
worker work at
some high section.
Entrance and exit should be covered by protective
shed or others
insolating
facility
when
workers
are
involved
with
each
other
at
the
same
time.
Protective
rail,
baffle
and
safety
net
should
be
fixed
above
3
meters
from
ground.
Regular check helmet
and safety net.
4.
Safety sign
and caution plate should be fixed on scaffolding.
They can not be
removed unless
construction crew allow removing.
5.
Traffic signs
should be fixed on site.
“
Da
ngerous
”
or
“
caution
”
sign should
be fixed at some dangerous places.
Check the
executive condition: GOOD
Work section: foundation
and main structure
work item:
Disclosure item: season work
Disclosure content:
1.
Before and
after storm, workers should check temporary
facility, scaffolding,
electromechanical equipment and
temporary circuit. If leakage of electricity,
leakage
of rain, lean, deformation and
sinking are found, workers should mend and fix
them in
time. Serious problems must be
solved immediately.
2.
Roads on site
should be maintained well.
3.
Workers
should
take
ventilating
and
cooling
measure
when
their
work
surroundings is too hot to work.
Check the executive
condition: GOOD
-
-
-
-
-
-
-
-
-