-
测
井
作
业
英
语
< br>100
句
check the
bridle insulation.
检查一下马笼头绝缘。
Change to a long electrode
bridle.
换上长电极马笼头。
Fill in the bridle with
silicone.
给马笼头打些硅脂。
Connect the bridle to the logging
tool.
把马笼头接到测井仪器上。
Connect the cable head with the
tools.
把电缆头与仪器连上。
Disconnect the
torpedo.
把鱼雷拆开。
Which cable conductor has low
dielectric strength?
几号电缆绝缘低?
How many ohms does it
read?
有多少欧姆?
Connect the tools
properly.
指导仪器连接好。
Connect the tools at the well
head.
在井口对接仪器。
Connect the tools with a
jumper.
用跨接线将仪器连接好。
Start to make before-logging
calibration.
开始做测前刻度。
Put the r calibrating jig on to the GR.
把
r
刻度架放到
GR
上。
Make a
calibration for GR tool.
做
GR
仪器刻度。
Make sure
that the position is
right.
位置一定要放准。
Take the calibrator a bit
further.
把刻度器拿远一点。
Put on the large caliper
ring.
套上大井径环。
Put
the tool on the high
stand.
将仪器放到高架子上。
Take down the
tool.
把仪器抬下来。
Fill
in the calibration tube with
water.
将刻度管内灌满水。
Add some detergent into
water.
水内要加入洗衣粉。
The connection is no good. tighten the
thread a little bit.
接触不好,再把丝扣紧一紧。
Put
the surface electrode into the mud
put.
将地面电极放入泥浆池。
Lift up the upper
sheave.
把天滑轮吊上。
Lift the sheave a bit
higher.
将滑轮吊高一些。
Make sure that the floor chain is
secured.
地崩绳一定要固定好。
Stretch the cable tight when pulling it
to the well head.
放电缆时要拉紧电缆。
Hand me the spanner wrench,
please.
请把勾头给我。
There
’
s something
wrong with this tool, change it for another one.
这支仪器有问题,换另一支仪器。
Hold the tool straight and put it down
into the well.
扶好仪器将仪器下井。
Zero the tool
string.
对零。
Put on
centralizers above and below the
sonic.
声波上下都要加扶正器。
Put on decentralize on the compensated
neutron tool.
在补偿中子仪器上要加偏心器。
Connecting like that is not right. It
should be done like this.
那样接不对,应该这样。
Carry
the AC tool over
here.
把声波仪器抬过来。
The tool needs
recalibration.
仪器需要重新刻度。
-
-
-
-
-
-
-
-
-
上一篇:免疫学数据的现代统计分析指南
下一篇:分析方法的方法学验证