1.
What
are the responsibilities of the First Engineer on
board a ship?
The First Engineer is
under the leadership of the Chief Engineer. He is
responsible for the following.
(1)
Day-to-day running of the Engine room.
(2)
Management of the
Engine department personnel.
(3)
Safety matters in the Engine room.
(4)
All maintenance and
repair jobs on board ship
(5)
The
main
engine
and
its
auxiliary
equipment,
steering
gears,
emergency
equipments
in
engine room, etc.
(6)
Making and implementing the PMS
(Planned Maintenance System)
(7)
Requisition for, receipt and control
of spare parts and stores
(8)
Supervision of the jobs of engine
crew.
(9)
Keeping watch
from 0400 to 0800 and from 1600 to 2000 except for
UMS operation.
2.
What is your emergency position on the
Muster List on your last vessel?
I
control
and
operate
the
main
engine
except
for
the
abandon-ship
and
fire
in
engine
room
emergency situations.
3.
Can you describe an
emergency situation you ever encountered on board
ships?
No, I have never met any
emergency situation before now.
4.
Which machineries and
space parts should be under your charge?
I
should
be
responsible
for
the
main
engine,
the
service
pumps
for
main
engine,
steering
gear,
accommodation
air
condition,
provision
of
refrigerator
and
the
emergency
equipments.
I
should
also prepare
maintenance reports, fuel oil and lubrication oil
samples analysis, inventory report of
spare parts, store and spare parts
requisitions, etc.
5.
Describe the procedure to start a
fresh water generator, boiler, emergency
generator?
In case of fresh water
generator:
(1)
Check the
valves to make sure that they are in the normal
position
(2)
Open the sea
water valves of condenser and supply sea water to
heating chamber
(3)
Start
the sea water ejector pump to draw out the vacuum
until the heating chamber vacuum
reaches 93% (about 700 mmHg)
(4)
Open the water heating
valves and keep the heating chamber temperature
around 45 degrees
Centigrade
(5)
When the condensed
water reaches a certain level, start the distilled
water pump, and keep its
pressure no
less than 0.2MPa.
(6)
Start chemical liquid feed pump.
In
case of automatic boiler:
(1)
Check the water level to make sure
there is normal volume of water inside
(2)
Open the vent valve on
top of the boiler (if it is first time to raise
pressure from cold condition)
(3)
Confirm
the boiler water
supply pumps are in “Auto” condition
(4)
Switch on the power
supply
(5)
Put
the boiler control switch in “Auto”
condition
(6)
Automatically start the boiler, close the air vent
valve while the boiler steam pressure reaches
0.02 MPa.
(7)
Confirm the boiler can auto stop while
it pressure reaches “high limit” (e.g.
0.7MPa)
In case of manual
boiler
(1)
Check the water
level to make sure there is normal volume of water
inside and put the feed
water pump in
“Auto” position
(2)
Open the vent valve on top of the
boiler (if it is first time raise pressure from
cold condition)
(3)
Put
the
draft
fan
in
“Manual”
position,
and
make
preventive
blow
to
avoid
any
possible
explosion
(4)
Put the fuel oil pump in “Manual”
position
(5)
Ignite
fire by pressing the manual
button, if the fire “On”, put valve
(6)
When the steam
pressure reaches to 0.1MPa, close the air vent
valve
(7)
After making
sure
that
everything
is in
order,
the
normal
burning
can
be
done to make
the
steam pressure reach required level
In case of emergency generator
(1)
Check the lube oil
level in the crankcase and fuel oil level in the
tank all in normal level
(2)
Check to see if there is any leakage
(3)
Check the air pressure
if the generator is the air-started model; or
check the battery voltage to
see
whether it is normal if the generator is of the
battery start model
(4)
Also make sure there aren’t any
obstacles around the machine.
(5)
Put
the
test
switch
in
“Manual”
position,
and
manually
start
it
after
maki
ng
sure
that
above-
mentioned items in order
(6)
If you use “Auto test”
model, or “Black out” model to test the emergency
generator, you must
inform bridge duty
officer and Chief Engineer. And you cannot carry
it until you get the permit from
both
of them. Otherwise, you must wait
(7)
“Auto test” must be carried
out once every month. “Blackout” test must be
carried out once
every 3 months
6.
When the
main engine cannot started by the compressed air,
what are the possible causes?
There may
be the following causes
(1)
Air pressure is too low
(2)
The turning gear is still engaged
(3)
There may be
operational fault
(4)
Some
of the high injection pumps are sticked
(5)
No fuel oil due to the
fact that the fuel valve is not open or the fuel
pump is not running
(6)
Relative locked due to some safety device actions
(7)
Air distributor timing
has been wrong
Etc.
7.
When main engine stops
after running a while, what are the possible
causes?
The following reasons may lead
to the problem:
(1)
Some
of the high injection pumps are sticked
(2)
There is no fuel oil
because valve is not open or the fuel pump is not
running
(3)
Lube oil
pressure is too low, or control air pressure is
too low
8.
What is the purpose of taking lube oil samples for
analysis?
By
analyzing
the
lube
oil
sample,
we
want
to
know
whether
the
lube
oil
meets
the
stipulated
standards in
viscosity, TBN (total base number), flash point,
water contents, mechanic impurities
etc.
. If impurities (i.e.
metals) are found, it means something wrong with
the bearing and crankshaft.
If the
viscosity is lower than the standard, it may mean
that fuel oil may have leaked into the lube oil
system. Too much fuel oil in the lube
oil system can lower the flash point of the lube
and also may
lead to possible
explosion. The important figure is TBN. If the TBN
is lower than the standard, it
means
the loss of the
anti-acid
ability
and this will lead to the
moving parts corrosive in the near
future.
9.
What are the things you need to take
note during the handover (before you sign off)?
The outgoing First Engineer shall
prepare a set of handover notes for the incoming
First Engineer
and
shall
ask
the
incoming
First
Engineer
be
familiar
with
the
note
contents.
One
copy
of
the
handover notes with
their signatures shall be given to the Chief
Engineer for file. In general the
handover procedure shall include the
following
(1)
A tour of
the engine room, with view of the engines,
documents and equipments
(2)
Discussion
on
current
and
future
engine
and
machine’s
operation
problems,
spare
part
requirement
(3)
Information on the
maintenance work and program
(4)
Dry dock repair list, if there if any
(5)
Discussion
on the junior engineers or crew’s capacity and
personalities
(6)
Survey status and requirements
(7)
Store and
status of the ship’s safety equipment and
machines
(8)
Current status of the ship’s safety
equipments and machines
(9)
Safety and environment protection
procedures and any special requirement by the
company
and in some areas in the world
(10) Disciplinary procedures and
management practice in the Engine department
(11) Any other matters that the
outgoing First Engineer thinks necessary and
important
After the handover, the two
First Engineers should sign all the Handover
Checklist as evidence and
for files.
p>
大管轮也是船上特别是轮机部非常重要的职位,所以交接班非常重要。
10. Before and after any hot works
is carried out, what are the safety precautions
you take?
(1)
An
application of hot work permit must made before
this kind of work is done. One copy shall
be put on hot work spot, and another
copy in ship’s file
(2)
Make sure that you are suitably
equipped and clothed
(3)
Observe carefully to see whether the weather, and
the temperature are fit for firework
(4)
See whether the fired
part and its vicinity have any potential
inflammable materials or toxic
gases
that can arise any fire or poisoning disaster.
Make sure that the hot work spot is cleaned and
is free from such thins as diesel oil,
kerosene, paint, cleaners or thinners.
(5)
And make sure that you
have enough extinguisher equipment available.
(6)
When the hot work is
done, make sure the firemen are standing by for
any emergency
(7)
After
the firework is done, check carefully whether any
inflammable things are left
(8)
Ask one or two person to watch
carefully for a period time until you are sure
that there will not
be any inflammation
or ignition after you leave the spot.
11. What kind of work belongs to hot
work? When are you not allowed to do hot work?
Hot work refers to all the work
involving high temperature, open flames, or sparks
that can cause
ignition
of
combustible
gases,
vapor,
or
liquid
in
vicinity
where
such
is
done.
This
kind
of
work
includes electric and
gas welding and cutting or burning, grinding,
metal chipping, sandblasting/grit
blasting, work with sparks caused by
falling or hitting, work with electric sparks,
other work with high
temperature etc.
Under the following circumstances, hot
work is forbidden:
(1)
Anywhere on the ship during cargo operation, when
handling flammable cargoes unless the
ship has got permission from the
terminal and port authority
(2)
Anywhere and any time during the
bunkering
(3)
In enclosed
paces or where atmosphere is suspicious
(4)
Where painting work is
underway at same time
(5)
Where unsafe factors are suspected
12.
How do you carry out gas testing and how do you
test the explosion?
I use the gas
tester to detect the gas composite content.
In the vicinity of the places to be
tested, the flammable gas content should not more
than the limited
figure, and no
combustive materials are available to avoid any
fire.
13.
Pleas explain the
meaning of “SOPEP”? What contents should be
included in the SOPEP?
SOPEP
means Shipboard Oil Pollution Emergency Plan and
it should contain the following:
-
-
-
-
-
-
-
-
-