-
LOGO
Subject
文件名称
:
QUALITY SYSTEM
Number
文件编号
:
PD-S2-02
PROCEDURE
Department
部门
:
质
量
体
系
程
序
PU
采购部
Purchase Management
Procedure
采购管理程序
Revision
版本
:
Effective
Date
生效日期
:
1.0
2012-01-01
审核:
Page
1
of 8
批准:
作成:
Revision
版本
Effective Date
生效日期
Change History
变更记录
Originator
编写人
Reasons for
Change
修改原因
1.0
P
URPOSE
目的
1.1
The procedure standards the purchasing
request and order process to ensure the quality of
products and service meet the
production and customer
’
s
requirements.
规范公司各项物资的采购活动,确保满足生产及客户的需求。
2.0
S
COPE
范围
2.1
Apply to operations for all production
and non- production requisitions and purchase
orders.
适用于公司所有生产和非生产物料的采购活动。
3.0
D
EFINITIONS
定义
3.1
Production
Material
:
All the materials
used in products BOM
,
can
calculate amount through
ERP system
生产性物料:所有用于产品
BOM
的物料,可
以通过
ERP
展算用量。
3.2
Non-Production
Material
:
Material that
don
’
t directly used for
products
,
such as production
equipment
,
instrum
ent
,
low-value consumption
goods
。
非生产性物料:指不直
接用于公司产品上的物料。包括用于生产的设备、仪器、低值易耗品。
4.0
R
EFERENCE
DOCUMENTS
参考文件
4.1
4.2
4.3
4.4
4.5
5.1
5.2
5.3
5.4
PD-S2-01
Supplier management Procedure
供应商管理程序
PD-C4-01
Planning Management Procedure
计划管理程序
PD-C4-02
Material And Goods Management
Procedure
物料管理程序
PD-S5-01 Product Monitoring and
Measurement
Procedure
产品监视与测量程序
PD-S6-01 Nonconforming Product Control
Procedure
不合格品控制程序
5.0
R
ECORDS
记录
FN-PU-012
Purchase Order
采购订单
FN-PU-013 Capital approval Form
固定资产审批单
FN-PU-014
Purchasing Requisition Form
采购申请单
FN-PU-015
Purchasing Inquiry Form
询价单
Confidential company files and
don
’
t share with outside.
公司内部文件严禁外泄。
Please save paper and
don
’
t print without
restriction.
请节约用纸,不要随意打印文件。
LOGO
Subject
文件名称
:
QUALITY SYSTEM
Number
文件编号
:
PD-S2-02
PROCEDURE
Department
部门
:
质
量
体
系
程
序
PU
采购部
Purchase Management
Procedure
采购管理程序
Revision
版本
:
Effective
Date
生效日期
:
1.0
2012-01-01
Page
2
of 8
5.5
FN-PU-016 Urgency
Purchasing Requisition Audit
Form
紧急需求申请审批单
5.6
FN-PU-017 Purchasing Inquiry Record
采购询价记录表
5.7
FN-PU-018 Notice of Deductions
供应商扣款单
5.8
FN-PU-019 Purchasing Change Application
Form
采购变更申请审批单
6.0
R
ESPONSIBILIT
Y
职责
6.1
Purchasing department: Purchasing for
productive materials and non- productive, such as
equipments, tooling and fixtures,
measuring instruments, and etc.
采购部
:负责生产性物料和非生产性物料的采购,非生产性物料如设备、工装、量具等。
6.2
Quality:
Responsible for define
goods
’
quality requirement
and the testing method ,the incoming
inspection and the re-inspection
regularly
质量部
:负责制定采购物资的质量要求和
检验方法,负责物资进厂检验及定期复验。
6.3
Responsible: Responsible for Purchasing
requirement
各部门
:负责采购申请单的提出
7.0
P
ROCESS
流程
7.1
Purchase finished-goods, material in
BOM and subcontract process in Routing
成品,
BOM
中物料和
Routing
中外包工序的采购:
7.1.1
Logistics department responsible for
the purchasing requirement (FN-PU-014 Purchasing
Requisition Form) for finished-goods,
material in BOM and subcontract in Routing,
according to customers’
foreca
st and the inventory in factory,
after got approval by their
supervisor,
provide it to Purchasing department.
物流部根据客户预示量及厂内实际库存,提出
FN-PU-01
4
采购申请单,并将批准后的采购
申请单,提供给采购部。
p>
7.1.2
Purchasing
department get PO approved based on below rule.
采购部
根据以下规则批准
FN-
PU-012
采购订单。
Amount
金额
≤
2500
>2500
GM
总经理
X
VP
副总裁
X
7.1.3
Purchasing department release PO to
supplier and get acknowledgement, follow up
delivery until supplier ships the goods
to warehouse.
采购部
下采购订单给供应商并得
到供应商的确认,跟踪订单的交货直到供应商送货到仓库。
7.1.4
Warehouse do goods
receipt after confirm the document and physical
goods after quality
do incoming
inspection if need. Details refer to PD-C4-02
Management
Procedure> and PD-S5-01
Procedure>.
仓库检查
文件和实物后收货入库,如果需要质量检验,质量检验合格后收货入库,详细参考
PD-
C4-02
《物流管理程序》和
PD-S5-01
《产品监视与测量程序》。
7.1.5
If the goods could not pass quality
inspection, return to supplier or refer to
PD-S5-01
warehouse do goods receipt.
Confidential company files
and don
’
t share with
outside.
公司内部文件严禁外泄。
Please save paper and
don
’
t print without
restriction.
请节约用纸,不要随意打印文件。
-
-
-
-
-
-
-
-
-
上一篇:庄子《逍遥游》准确翻译
下一篇:现代人力资源管理-英文文献翻译