1
.
为什么资格预审?
(
why
prequalification
)
The successful execution of contracts
for large buildings, civil engineering, supply
and installation, turnkey, and design-
and-build projects requires that contracts are
awarded only to firms, or combinations
of firms, that are suitably experienced in the
type
of
work
and
construction
technology
involved,
that
are
financially
and
managerially
sound,
and
that
can
provide
all
the
equipment
required
in
a
timely
manner.
The
assessment
by
an
implementing
agency
of
the
suitability
of
firms
to
carry
out
a
particular
contract
prior
to
being invited to submit a bid is a process called
prequalification.
2.
< br>资格预审会不会降低后续施工招标中的积极性
p>
不会。投标时并不是越多越好,而是要选择合格的承包商。不合格的承包商没有可比性。同一
流
的建筑公司,管理成本正规
i
,报价
保证自己的利润。竞争的是技术实力,投入更多精力来编织技术
标,竞争力更强。
同一档次的不是越多越好,二流三流成本低管理不好,容易胡报价。
t of prequalification
The
prequalification
process
is
of
benefit
to
both
bidders
and
Executing
Agencies
alike,
in
that
?
the process enables
prospective bidders, who may be insufficiently
qualified on
their
own,
to
avoid
the
expense
of
bidding,
or
to
form
a
joint
venture
that
may
give
a
better
chance
of
success;
?
with
prequalification,
well
qualified
firms
will
price
their
bids
with
the
knowledge that they are competing against other
qualified bidders meeting realistic
minimum
competence
criteria,
and
with
the
assurance
that
inadequately
qualified
competitors
will be excluded
from submitting unrealistically low bids, leading
contractors are
encouraged
to
bid;
?
prequalification
enables
Executing
Agencies
to
assess
the
interest
from
qualified firms generated by the
contract and, in the event that only a limited
number of
applications are received, to
make any necessary adjustments in the procurement
process;
?
it helps to
expose potential conflicts of interest of an
applicant with other parties
involved
in
this
prequalification
process;
?
it
reduces
the
amount
of
work
and
time
involved
by
Executing
Agencies
in
evaluating
bids
from
unqualified
contractors;
it
encourages
local
firms to form joint ventures with other
local or international firms, thereby benefiting
from their resources and
experience;
?
it enables the
Executing Agencies to assess the
likelihood
o
f
contractors’
eligibility
for
domestic
bidder
price
preference
in
borrowing
countries where
this is applicable; and
?
it
reduces significantly, if not eliminates,
problems of rejection associated with
low-priced bids submitted by bidders of doubtful
capability.
e contract
将标划分成很多块来判断承保能力。不同性质的标段由不同
的承包商承担。判断承保能力。
5.
资格预审包含的内容
Instructions to Applicants (ITA).
Application Data Sheet. Qualification Criteria.
Application Forms. Eligible Countries.
Scope of Contract.
6.
业主有权拒绝资格预审资料
18.1 The Employer reserves the right
to accept or reject late Applications.
s in qualification
Any
change in the qualification status of an Applicant
after being prequalified in
accordance
with ITA Clause 27 shall be subject to the written
approval of the Employer.
Any
such
change
shall
be
submitted
to
the
Employer
not
later
than
fourteen
(14)
days
after
the
date of the Invitation to Bid. Such approval shall
be denied if as a consequence of
any
change,
(a)
the
prequalified
Applicant,
after
the
change,
no
longer
substantially
meets
the qualification criteria set forth in
Section III, Qualification Criteria; or (b) a new
partner that had not been prequalified
as an Applicant or a Specialist Subcontractor as
per ITA 24.2 is added to a prequalified
Applicant.
8.
甲方组织招标编制的招标文件的内
容
PART I Bidding
Procedures
;
Section 1 -
Instructions to Bidders
(ITB)
;
Section 2
-
Bid Data Sheet (BDS)
;
Section
3 - Evaluation and Qualification Criteria
(EQC)
;
Section 4 - Bidding
Forms (BDF)
;
Section 5 -
Eligible Countries
(ELC)
;
PART II
Req
uirements
;
Section 6 -
Employer
’
s Requirements
(ERQ)
;
PART III Conditions of
Contract and Contract
Forms
;
Section 7 - General
Conditions (GCC)
Section 8 - Particular
Conditions (PCC)
;
Section 9 -
Contract Forms (COF)
10.
招标文件的修改
8.1 At any time prior to the deadline
for submission of bids, the Employer may amend the
Bidding Document by issuing addenda.
8.2 Any addendum issued shall be part of the
Bidding
Document
and
shall
be
communicated
in
writing
to
all
who
have
obtained
the
Bidding
Document
from the Employer
in accordance with ITB 6.3.
11.
投标文件的内容
The Bid shall comprise the
following:(a) Letter of Bid; (b) completed
schedules as
required, including priced
Bill of Quantities, in accordance with ITB 12 and
14; (c) Bid
Security, in accordance
with ITB 19; (d) alternative bids, if permissible,
in accordance
with ITB 13; (e) written
confirmation authorizing the signatory of the Bid
to commit the
Bidder, in accordance
with ITB 20.2; (f) documentary evidence in
accordance with ITB 17
establishing the
Bidder
’
s
qualifications to perform the contract if its Bid
is accepted;
(g) Technical Proposal in
accordance with ITB 16; (h) any other document
required in the
BDS.
12.
alternative bids
13.1
Unless
otherwise
indicated
in
the
BDS,
alternative
bids
shall
not
be
considered.13.2
When alternative times for completion
are explicitly invited, a statement to that effect
will
be
included
in
the
BDS,
as
will
the
method
of
evaluating
different
times
for
completion.
13.3 Except as
provided under ITB 13.4 below, Bidders wishing to
offer technical
alternatives to the
requirements of the Bidding Document must first
price the Employer
’
s design
as described in the Bidding Document and shall
further provide all information
necessary
for
a
complete
evaluation
of
the
alternative
by
the
Employer,
including
drawings,
design calculations, technical
specifications, breakdown of prices, and proposed
construction methodology and other
relevant details. Only the technical alternatives,
if
any, of the lowest evaluated Bidder
conforming to the basic technical requirements
shall
be considered by the Employer.
13.4 When specified in the BDS, Bidders are
permitted to
submit alternative
technical solutions for specified parts of the
Works. Such parts will
be
identified
in
the
BDS
and
described
in
Section
6
(Employer
’
s
Requirements).
The
method
for their evaluation
will be stipulated in Section 3 (Evaluation and
Qualification
Criteria).
13.
开标顺序:
First,
envelopes marked
“
WITHDRAWAL
”
shall be opened and read
out
and the envelope with the
corresponding bid shall not be opened, but
returned to
the Bidder. Next, envelopes
marked
“
SUBSTITUTION
< br>”
shall
be
opened
and
read
out
and
exchanged
with
the
corresponding
bid being
substituted,
and
the
substituted
bid
shall
not
be
opened,
but
returned
to
the
Bidder.
Envelopes
marked
“
MODIFICAT
ION
”
shall
be
opened
and
read
out
with
the
corresponding
bid. All other
envelopes shall be opened one at a time
如何判断标书是符合还是不符合包括哪几个内容
?
1.
未按业主要求投标,
2
增大业主责任,减轻自己责任
3
,关
键资料未提交
ions,reservations and
omissions
(a)
“
D
eviation
”
is
a
departure
from
the
requirem
ents
specified
in
the
Bidding
Document;
(b)
“
Reservation<
/p>
”
is the setting of limiting
conditions or withholding from complete
acceptance
of
the
requirements
specified
in
the
Bidding
Document;
and
(c)
“
Omission
”
is
the
failure
to
submit
part
or
all
of
the
information
or
documentation
required
in
the
Bidding
Document.
15.
实质性不符合
符合:
A
substantially responsive
bid
is one that meets the requirements of the Bidding
Document without material deviation,
reservation, or omission. A material deviation,
reservation,
or
omission
is
one
that,
(a)
if
accepted,
would:(i)
affect
in
any
substantial
way
the
scope,
quality,
or
performance
of
the
Works
specified
in
the
Contract;
or
(ii)
limit
in any substantial
way,
inconsistent with the Bidding
Document, the Employer
’
s
rights or
the
Bidder
’
s
obligations
under
the
proposed
Contract;
or
(b)
if
rectified,
would
unfairly
affect
the
competitive
position
of
other
Bidders
presenting
substantially
responsive
bids.
16.
非实质性不符合可以补救,实质性不能补救
Provided
that
a bid is substantially
responsive, the Employer may waive any
nonconformities in the bid that do not
constitute a material deviation,
reservation or omission.
Provided
that
a bid
is substantially
responsive, the Employer may request that the
Bidder submit the
necessary information
or documentation, within a reasonable period of
time, to
rectify nonmaterial
nonconformities in the bid related to
documentation
requirements.
Provided
that
a
bid
is
substantially
responsive,
the
Employer
shall
rectify nonmaterial
nonconformities related to the Bid Price.
< br>17.
投标人资格审查程序
(
Q
ualification of the
Bidder
):
36.1
The Employer shall
determine
to its satisfaction whether the Bidder that is
selected as having
submitted the lowest
evaluated and substantially responsive bid meets
the
qualifying criteria specified in
Section 3 (Evaluation and Qualification
Criteria).
36.2
The determination shall be based upon
an examination of the
documentary
evidence of the Bidder
’
s
qualifications submitted by the Bidder,
pursuant
to
ITB
17.1.
36.3
An
affirmative
determination
shall
be
a
prerequisite
for
award of the Contract to the Bidder. A
negative determination shall result in
disqualification
of
the
bid,
in
which
event
the
Employer
shall
proceed
to
the
next
lowest
evaluated
bid
to
make
a
similar
determination
of
that
Bidder
’
s
qualifications
to perform
satisfactorily.
18.
业主评标的依据:
(a)
the
bid
price,
excluding
Provisional
Sums
and
the
provision,
-
-
-
-
-
-
-
-
-