关键词不能为空

当前您在: 主页 > 英语 >

土木工程专业外文文献及翻译

作者:高考题库网
来源:https://www.bjmy2z.cn/gaokao
2021-02-11 04:50
tags:

-

2021年2月11日发(作者:albania)


关于政府采购工程招标与评标的实践探索





















































































学校代码:






号:







外文文献及翻译
























About


Buiding


on


the


Structure Design




< br>姓
























< br>:




















< br>程











(








)



0

< br>8


-


4























.


1



关于政府采购工程招标与评标的实践探索





英文原文:



Building construction concrete crack of



prevention and processing



Abstract



The crack problem of concrete is a widespread existence


but again


difficult


in


solve


of


engineering


actual problem,


this


text


carried


on


a


study


analysis


to


a


little


bit


familiar


crack


problem


in


the


concrete


engineering,


and


aim


at


concrete


the


circumstance


put


forward


some


prevention,


processing measure.



Keyword:


Concrete crack prevention processing



Foreword



Concrete's ising 1 kind is anticipate by the freestone


bone, cement, water and other mixture but formation of the


in


addition


material


of


quality


brittleness


not


and


all


e the concrete construction transform with


oneself, control etc. a series problem, harden model of in


the concrete existence numerous tiny hole, spirit cave and


tiny


crack,


is


exactly


because


these


beginning


start


blemish


of


existence


just


make


the


concrete


present


one


some


not


and


all the characteristic of tiny crack is a kind


of


harmless


crack


and


accept


concrete


heavy,


defend


Shen


and


a


little


bit


other


use


function


not


a


creation


to



after the concrete be subjected to lotus carry, difference


in


temperature


etc.


function,


tiny


crack


would


continuously


of


expand


with


connect,


end


formation


we


can


see


without


the


.


2



关于政府采购工程招标与评标的实践探索



aid


of


instruments


of


macro


view


the


crack


be


also


the


crack


that the concrete often say in the engineering.



Concrete


building


and


Gou


piece


usually


all


take


sewer


to


make


of,


because


of


crack


of


existence


and


development


usually make inner part of reinforcing bar etc. material


creation


decay,


lower


reinforced


concrete


material


of


loading ability, durable and anti- Shen ability, influence


building


of


external


appearance,


service


life,


severity


will


threat


arrive


people's


life


and


property


safety.A


lot


of


all


of


crash


of


engineerings


is


because


of


the


unsteady


development of the crack with the result age


science


research


with


a


great


deal


of


of


the


concrete


engineering


practice


certificate,


in


the


concrete


engineering


crack


problem


is


ineluctable,


also


acceptable


in


certainly of the scope just need to adopt valid of measure


will


it


endanger


degree


control


at


certain


of


scope



reinforced


concrete


norm


is


also


explicit


provision:Some


structure


at


place


of


dissimilarity


under


the


condition


allow


existence


certain the crack


of



at


under construction should as far as possible adopt a valid


measure


control


crack creation,


make the structure don't


appear crack possibly or as far as possible decrease crack


of


amount


and


width,


particularly


want


to


as


far


as


possible


avoid


harmful


crack


of


emergence,


insure


engineering


quality


thus.



Concrete


crack


creation


of


the


reason


be


a


lot


of


and


have


already transformed to cause of crack:Such as temperature


variety,


constringency,


inflation,


the


asymmetry


sink


to


sink


etc.


reason


cause


of


crack;Have


outside


carry


the


crack


that


the


function


cause;Protected


.


environment


not


3



关于政府采购工程招标与评标的实践探索



appropriate


the


crack


etc.


caused


with


chemical



differentiation


to


treat


in


the


actual


engineering,


work°out


a problem according to the actual circumstance.



In the concrete engineering the familiar crack and the


prevention



Suo crack and prevention



Stem


the


Suo


crack


much


appear


after


the


concrete


protect


be


over


of


a


period


of


time


or


concrete


sprinkle


to


build


to


complete


behind


of


around


a



the


cement


syrup


humidity


of


evaporate


would


creation


stem


Suo,


and


this


kind


of


constringency


is


can't



Suo


crack


of


the


creation


be


main


is


because


of


concrete


inside


outside


humidity


evaporate


degree


dissimilarity


but


cause


to


transform


dissimilarity


of


result:The


concrete


is


subjected


to exterior condition of influence, surface humidity loss


lead


quick,


transform


bigger,


inner


part degree of humidity


variety smaller transform smaller, bigger surface stem the


Suo


transform


to


be


subjected


to


concrete


inner


part


control,


creation more big pull should dint but creation


relative


humidity


is


more


low,


cement


syrup


body


stem


Suo


more


big, stem the Suo crack be more easy the Suo


crack


is


much


surface


parallel


lines


form


or


the


net


shallow


thin


crack,


width


many


between


0.05-0.2


mm,


the


flat


surface


part


much


see


in


the


big


physical


volume


concrete


and


follow


it more in thinner beam plank short to Suo


crack


usually


the


anti-


Shen


of


influence


concrete,


cause


the


durable


of


the


rust


eclipse


influence


concrete


of


reinforcing


bar, under the function of the water pressure dint would


creation the water power split crack influence concrete of


loading dint etc..Concrete stem the Suo be main with water


.


4



关于政府采购工程招标与评标的实践探索



ash of the concrete ratio, the dosage of the composition,


cement of cement, gather to anticipate of the dosage of the


property and dosage, in addition etc. relevant.



Main


prevention


measure:While


being


to


choose


to


use


the


constringency


quantity


smaller


cement,


general


low


hot


water


mire


and


powder


ash


from


stove


cement


in


the


adoption,


lower


the dosage of is a concrete of stem the Suo be


subjected


to


water


ash


ratio


of


influence


more


big,


water


ash


ratio more big, stem Suo more big, so in the concrete match


the ratio the design should as far as possible control good


water


ash


ratio


of


choose


to


use,


the


Chan


add


in


the


meantime


accommodation


of


reduce



is


strict


control


concrete mix blend with under construction of match ratio,


use of concrete water quantity absolute can't big in match


ratio design give settle of use water is the


earlier


period which strengthen


concrete to protect, and


appropriate


extension


protect


of


concrete



construction


want


to


be


appropriate


extension


concrete


heat


preservation


to


overlay


time,


and


Tu2


Shua


protect


to


is a constitution the accommodation is in the


concrete structure of the constringency sew.



Su constringency crack and prevention



Su


constringency


is


the


concrete


is


before


condense,


surface


because


of


lose


water


quicker


but


creation


of


Su constringency crack is general at dry


heat


or


strong


wind


the


weather


appear,


crack's


much


presenting


in


the


center


breadth,


both


ends


be


in


the


centerthin and the length be different, with each other not


coherent


r


crack


general


long


20-30


cm,


the


longer


crack


can


reach


to


a


2-3


m,


breadth


1-5



creation


.


5



关于政府采购工程招标与评标的实践探索



of main reason is:The concrete is eventually almost having


no strength or strength before the Ning very small, perhaps


concrete just eventually Ning but strength very hour, be


subjected to heat or compare strong wind dint of influence,


the concrete surface lose water to lead quick, result in in


the


capillary


creation


bigger


negative


press


but


make


a


concrete


physical


volume


sharply


constringency,


but


at


this


time


the


strength


of


concrete


again


can't


resist


its


constringency,


therefore


creation



influence


concrete Su constringency open the main factor of crack to


have


water


ash


ratio,


concrete


of


condense


time,


environment


temperature, wind velocity, relative humidity...etc..



Main


prevention


measure:One


is


choose


to


use


stem


the


Suo


value smaller higher Huo sour salt of the earlier period


strength


or


common


the


Huo


sour


brine



is


strict


the


control water ash ratio, the Chan add to efficiently reduce


water


to


increment


the


collapse


of


concrete


fall


a


degree


and


with easy, decrease cement and water of is to


sprinkle before


building concrete, water basic level and


template


even


to


soak



is


in


time


to


overlay


the


perhaps


damp


grass


mat


of


the


plastics


thin


film,


hemp


slice


etc., keep concrete eventually before the Ning surface is


moist, perhaps spray to protect etc. to carry on protect in


the


concrete



is


in


the


heat


and


strong


wind


the


weather to want to establish to hide sun and block breeze


facilities, protect in time.



to sink crack and prevention



The creation which sink to sink crack is because of the


structure


foundation


soil


quality


not


and


evenly,


loose


soft


or


return


to


fill


soil


dishonest


or


soak


in


water


but


result


.


6



关于政府采购工程招标与评标的实践探索



in


the


asymmetry


sink


to


decline


with


the


result


that;Perhaps


because


of


template


just


degree


shortage,


the


template


propped


up


to


once


be


apart


from


big


or


prop


up


bottom


loose


move etc. to cause, especially at winter, the template prop


up


at


jelly


soil


up,


jelly


the


soil


turn


jelly


empress


creation asymmetry to sink to decline and cause concrete


structure


creation



kind


crack many


is


deep


enter


or pierce through sex crack, it alignment have something to


do with sinking to sink a circumstance, general follow with


ground perpendicular or present 30 °s-45 ° Cape direction


development,


bigger


sink


to


sink


crack,


usually


have


certain


of wrong, crack width usually with sink to decline quantity


direct proportion width under the influence


of


temperature


variety



foundation


after


transform stability sink to sink crack also basic tend in


stability.



Main


prevention


measure:One


is


rightness


loose


soft


soil,


return to fill soil foundation a construction at the upper


part


structure


front


should


carry


on


necessity


of


Hang


solid


with is the strength that assurance template


is enough and just degree, and prop up firm, and make the


foundation


be


subjected


to


dint



is


keep concrete


from


sprinkle


infusing


the


foundation


in


the


process


is


soak


by



is


time


that


template


tore


down


to


can't


be


too


early,


and


want


to


notice


to


dismantle


a


mold


order


of



is


at


jelly


soil


top


take


to


establish


template


to notice to adopt certain of prevention measure.



ature crack and prevention



Temperature crack much the occurrence is in big surface


or


difference


in temperature variety


of


the physical


volume


.


7



关于政府采购工程招标与评标的实践探索



concrete


compare


the


earth


area


of


the


concrete


te


after


sprinkling


to


build,


in


the


hardening the process, cement water turn a creation a great


deal of of water turn hot, .(be the cement dosage is in the


350-550


kg/m


3,


each


sign


square


the


rice


concrete


will


release


a


calories


of


17500-27500


kJ


and


make


concrete


internal thus the temperature rise to reach to 70



or so


even


higher)Because


the physical


volume


of


concrete


be more


big, a great deal of of water turn hot accumulate at the


concrete


inner


part


but


not


easy


send


forth,


cause


inner


part


the temperature hoick, but the concrete surface spread hot


more


quick,


so


formation


inside


outside


of


bigger


difference


in


temperature,


the


bigger


difference


in


temperature


result


in inner part and exterior hot the degree of the bulge cold


Suo


dissimilarity,


make


concrete


surface


creation


certain


of


pull should pull should dint exceed the anti- of


concrete


pull


strength


extreme


limit,


concrete


surface


meeting creation crack, this kind of crack much occurrence


after


the


concrete


under


construction



the


concrete


of under construction be difference in temperature variety


more big, perhaps is a concrete to be subjected to assault


of


cold


wave


etc.,


will


cause


concrete


surface


the


temperature


sharply


descend,


but


creation


constringency,


surface constringency


of


the


concrete be subjected to


inner


part concrete of control, creation very big of pull should


dint but creation crack, this kind of crack usually just in


more shallow scope of the concrete surface creation.



The


alignment


of


the


temperature


crack


usually


none


settle


regulation,


big


area


structure


the


crack


often


maneuver


interleave;The


size


bigger


structure


of


the


beam


plank


length,


.


8



关于政府采购工程招标与评标的实践探索



the crack run parallel with short side more;Thorough with


pierce through sex of temperature crack general and short


side


direction


parallelism


or


close


parallelism,


crack


along


long


side


cent


the


segment


appear,


in


the


center


more



width the


size


be


different,


be


subjected


to


temperature variety influence more obvious, winter compare


breadth, summer more concrete temperature crack


that the heat inflation cause is usually in the center the


thick both ends be thin, but cold Suo crack of thick thin


variety


not


too



emergence


of


the


this


kind


crack


will


cause


the


rust


eclipse


of


reinforcing


bar,


the


carbonization


of


concrete,


the


anti-


jelly


which


lower


concrete melt, anti- tired and anti- Shen ability etc..



Main


prevention


measure:One


is


as


far


as


possible


choose


to


use


low


hot


or


medium


hot


water


mire,


like


mineral


residue


cement,


powder


ash


from


stove


cement...etc..Two


is


a


decrease


cement dosage, cement dosage as far as possible the control


is in the 450 kg/m 3 is to lower water ash


ratio,


water


ash


of


the


general


concrete


ratio


control


below



is


improvement


the


bone


anticipate


class


to


go


together


with,


the


Chan


add


powder


ash


from


stove


or


efficiently


reduce


water


etc.


to


come


to


reduce


cement


dosage


and lower water to turn is an improvement concrete


of mix blend to process a craft, lower sprinkle of concrete


to


build



is


the


in


addition


that


the


Chan


add


a


have


of


fixed


amount


to


reduce


water


and


increase


Su,


slow


Ning


etc.


function


in


the


concrete,


improvement


the


concrete


mix


to


match


a


thing


of


mobility,


protect


water,


lower


water


to


turn


hot,


postpone


hot


Feng


of


emergence



is


the


heat


season


sprinkle


to


build


can


the


adoption


take


to


.


9



关于政府采购工程招标与评标的实践探索



establish


to


hide


sun


plank


etc.


assistance


measure


control


concrete


of


Wen


Sheng,


lower


to


sprinkle


temperature


of


build


the



is


the


temperature


of


big


physical


volume


concrete


should


the


dint


relate


to


structure size, concrete


structure size more big, temperature should dint more big,


so want reasonable arrangement construction work preface,


layering,


cent


the


piece


sprinkle


to


build,


for


the


convenience


of


in


spread


hot,


let


up



is


at


great


inner


part


constitution


of


the


physical


volume


concrete


cool


off piping, cold water perhaps cold air cool off, let up


concrete


of


inside


outside


difference


in



is


the


supervision


which


strengthen


concrete


temperature,


adopt


to cool off in time, protection measure.11 is to reserve


temperature


constringency


to


sew.12


is


to


let


up


to


control,


sprinkle proper before building concrete in the Ji rock and


old


concrete


top


build


a


5


mm


or


so


sand


mat


a


layer


or


usage


asphalt etc.


material


Tu2


Shua.13 is


to


strengthen concrete


to


protect,


the


concrete


after


sprinkle


build


use


moist


grass


Lian


in


time,


hemp


slice's


etc.


overlay,


and


attention


sprinkle


water


to


protect,


appropriate


extension


protect


time, assurance


the


concrete surface be slow-moving


cool



the


cold


season,


concrete


surface


should


constitution


heat preservation measure, in order to prevent cold wave


assault.14


is


the


allocation


be


a


little


amount


in


the


concrete


of


reinforcing


bar


perhaps


add


fiber


material


concrete of temperature crack control at certain of scope


inside.



and prevention that the chemical reaction cause



Alkali


bone's


anticipating


the


crack


that


reaction


crack


and reinforcing bar rust eclipse cause is the most familiar


.


10


-


-


-


-


-


-


-


-



本文更新与2021-02-11 04:50,由作者提供,不代表本网站立场,转载请注明出处:https://www.bjmy2z.cn/gaokao/634195.html

土木工程专业外文文献及翻译的相关文章