电缆沟开挖施工方案



Work


Method


of


Cable


Trench


Excavation





制:


Compiled by:




核:


Reviewed by:


20 09



10



21




October 21, 2009







Content



.


概况


OVERVIEW ......................................... ..............


3



1.1


工程概况


PROJECT OVERVIEW ..........................................


3



1.2


施工范围


SCOPE OF WORK .............................................


3



二.编制依据


COMPILATION BASIS ...........................................


4



三.



施工工艺流程


CONSTRUCTION PROCESS:


...................................


4




.


前期准备


PREPARATIONS


................................................


4



4.1


技术准备


TECHNICAL PREPARATION


......................................


4



4.2


材料准备


MATERIAL PREPARATION


........................................


5



4.3


主要机具准备


MAIN EQUIPMENTS PREPARATION


.............................


5



4.4


作业环境准备


OPERATING ENVIRONMENT PREPARATIONS


......................


5




.


电缆沟施工


CABLE TRENCH CONSTRUCTION


.................................


5



5.1


电缆沟测量、定位


CABLE TRENCH MEASUREMENT AND POSITIONING ...........


5



5.2


电缆沟开挖


CABLE TRENCH EXCAVATION


..................................


6




.


质量控制


QUALITY CONTROL

< br>..............................................


7



6.1


电缆沟外形尺寸允许偏差表


ALLOWABLE DEVIATED EXTERNAL DIMENSIONS OF CABLE


TRENCH TABLE


............... ..............................................


7



6.2


应注意的质量问题


QUALITY ISSUES


......................................


8




.


成品保护


FINISHED PROTECTION


..........................................


8




.


施工记录


CONSTRUCTION OF RECORD


.......................................


8




.


安全生产、文明施工要求和措施


SAFETY


AND


CIVILIZED


CONSTRUCTION


REQUESTS


AND


MEASURES


.... .................................................. ...........


9



附厂区电缆沟图:


ATTACHED: CABLE TRENCH DRAWING


.


..........................


9






.


概况


Overview


1.1


工程概况


Project Overview


项目名称:



本工程涉及三个变电站,分别是现有的


220/35kV A472


变电站、现有的


35/10kV B301S


变电站


以及新建的


35/10kV C581< /p>


变电站,工作内容为三个变电站之间和从三个变电站接至


MV


用户的


电力电缆、控制电缆、接地电缆敷设所需电缆沟的开挖工程。


The project involves three


substations,


namely


the


existing


220/35kV


A472


substation,


the


existing


35/10kV


B301S


the 35/10kV C581 substation and a new substation. This is the power, control and


grounding cable trench excavation project among three substations and for MV users


connected to the three substations.



1.2


施工范围


Scope of Work


1)



A472

变电站引出


3



35kV


出线。其中:



一路引至


B301S


建筑



35/10kV< /p>


变电站)



1#


主变,



1#


主变电缆将抽出,


与新增


4#


主变连接;


另两路引至


35/10kV C581


变电站


1#


主变和


2#


主变。回路采 用


FS-YJY-26/35kV-1*300mm2


单芯


电缆,直埋敷设。去


C581


的两路


35kV


线路,敷设时沿不同路径,以避免两回线路同时受损。


Pull three 35V outgoings from A472 substation. Of which:


The first outgoing is led to B301S Building (35/10kV substation) the original one #


main transformer, pull the original one # main transformer cable out, and connect to


the adding 4 # main transformer; the other two outgoings are led to 35/10kV C581 # 1


and substation 2 # main transformer. Use FS-YJY-26/35kV-1 * 300mm2 single-core cables


for Loop and buried pulling. Two 35kV lines to C581 are laid along different paths to


avoid damage of the two loops.


2)



B301S


变电站引出


7



10kV


出线。全部引至


B399


中心制冷站。回路 采用


10kV


截面为


95mm2


的三芯铠装电缆,由


B301S


南面现有的电 缆井引出直埋至装置。


Pull 7 10kV outgoings from


B301S


substation


to


B399central


refrigeration


station.


Loop


uses


10kV


three-core


armored cable with cross-section 95mm2 and pull out from the existing cable well in


the south of B301S then buried lay to the device.


3)



C581

< br>引出


10



10kV

< p>
线路,


分别为


A507


的 四台变压器,


B551


的两台变压器,


B553TDA


装置氢


气压缩机


2


台,


C521


盐酸装置氯气压缩机


1


台,盐酸压缩机


1


台 提供电源。其中,变压器回路


采用


10kV

截面为


185mm2


的三芯铠装电缆,马达回路采用


10kV


截面为


95mm2

< br>的三芯铠装电缆。


以上电缆线路均沿规划路径埋地敷设。


10


10kV


lines


led


from


C581


are


used


to


supply


power

-


-


-


-


-


-


-


-



本文更新与2021-02-10 17:02,由作者提供,不代表本网站立场,转载请注明出处:https://www.bjmy2z.cn/gaokao/630351.html

室外电缆沟施工方案(中英文)的相关文章

  • 余华爱情经典语录,余华爱情句子

    余华的经典语录——余华《第七天》40、我不怕死,一点都不怕,只怕再也不能看见你——余华《第七天》4可是我再也没遇到一个像福贵这样令我难忘的人了,对自己的经历如此清楚,

    语文
  • 心情低落的图片压抑,心情低落的图片发朋友圈

    心情压抑的图片(心太累没人理解的说说带图片)1、有时候很想找个人倾诉一下,却又不知从何说起,最终是什么也不说,只想快点睡过去,告诉自己,明天就好了。有时候,突然会觉得

    语文
  • 经典古训100句图片大全,古训名言警句

    古代经典励志名言100句译:好的药物味苦但对治病有利;忠言劝诫的话听起来不顺耳却对人的行为有利。3良言一句三冬暖,恶语伤人六月寒。喷泉的高度不会超过它的源头;一个人的事

    语文
  • 关于青春奋斗的名人名言鲁迅,关于青年奋斗的名言鲁迅

    鲁迅名言名句大全励志1、世上本没有路,走的人多了自然便成了路。下面是我整理的鲁迅先生的名言名句大全,希望对你有所帮助!当生存时,还是将遭践踏,将遭删刈,直至于死亡而

    语文
  • 三国群英单机版手游礼包码,三国群英手机单机版攻略

    三国群英传7五神兽洞有什么用那是多一个武将技能。青龙飞升召唤出东方的守护兽,神兽之一的青龙。玄武怒流召唤出北方的守护兽,神兽之一的玄武。白虎傲啸召唤出西方的守护兽,

    语文
  • 不收费的情感挽回专家电话,情感挽回免费咨询

    免费的情感挽回机构(揭秘情感挽回机构骗局)1、牛牛(化名)向上海市公安局金山分局报案,称自己为了挽回与女友的感情,被一家名为“实花教育咨询”的情感咨询机构诈骗4万余元。

    语文