电缆沟开挖施工方案



Work


Method


of


Cable


Trench


Excavation





制:


Compiled by:




核:


Reviewed by:


20 09



10



21




October 21, 2009







Content



.


概况


OVERVIEW ......................................... ..............


3



1.1


工程概况


PROJECT OVERVIEW ..........................................


3



1.2


施工范围


SCOPE OF WORK .............................................


3



二.编制依据


COMPILATION BASIS ...........................................


4



三.



施工工艺流程


CONSTRUCTION PROCESS:


...................................


4




.


前期准备


PREPARATIONS


................................................


4



4.1


技术准备


TECHNICAL PREPARATION


......................................


4



4.2


材料准备


MATERIAL PREPARATION


........................................


5



4.3


主要机具准备


MAIN EQUIPMENTS PREPARATION


.............................


5



4.4


作业环境准备


OPERATING ENVIRONMENT PREPARATIONS


......................


5




.


电缆沟施工


CABLE TRENCH CONSTRUCTION


.................................


5



5.1


电缆沟测量、定位


CABLE TRENCH MEASUREMENT AND POSITIONING ...........


5



5.2


电缆沟开挖


CABLE TRENCH EXCAVATION


..................................


6




.


质量控制


QUALITY CONTROL

< br>..............................................


7



6.1


电缆沟外形尺寸允许偏差表


ALLOWABLE DEVIATED EXTERNAL DIMENSIONS OF CABLE


TRENCH TABLE


............... ..............................................


7



6.2


应注意的质量问题


QUALITY ISSUES


......................................


8




.


成品保护


FINISHED PROTECTION


..........................................


8




.


施工记录


CONSTRUCTION OF RECORD


.......................................


8




.


安全生产、文明施工要求和措施


SAFETY


AND


CIVILIZED


CONSTRUCTION


REQUESTS


AND


MEASURES


.... .................................................. ...........


9



附厂区电缆沟图:


ATTACHED: CABLE TRENCH DRAWING


.


..........................


9






.


概况


Overview


1.1


工程概况


Project Overview


项目名称:



本工程涉及三个变电站,分别是现有的


220/35kV A472


变电站、现有的


35/10kV B301S


变电站


以及新建的


35/10kV C581< /p>


变电站,工作内容为三个变电站之间和从三个变电站接至


MV


用户的


电力电缆、控制电缆、接地电缆敷设所需电缆沟的开挖工程。


The project involves three


substations,


namely


the


existing


220/35kV


A472


substation,


the


existing


35/10kV


B301S


the 35/10kV C581 substation and a new substation. This is the power, control and


grounding cable trench excavation project among three substations and for MV users


connected to the three substations.



1.2


施工范围


Scope of Work


1)



A472

变电站引出


3



35kV


出线。其中:



一路引至


B301S


建筑



35/10kV< /p>


变电站)



1#


主变,



1#


主变电缆将抽出,


与新增


4#


主变连接;


另两路引至


35/10kV C581


变电站


1#


主变和


2#


主变。回路采 用


FS-YJY-26/35kV-1*300mm2


单芯


电缆,直埋敷设。去


C581


的两路


35kV


线路,敷设时沿不同路径,以避免两回线路同时受损。


Pull three 35V outgoings from A472 substation. Of which:


The first outgoing is led to B301S Building (35/10kV substation) the original one #


main transformer, pull the original one # main transformer cable out, and connect to


the adding 4 # main transformer; the other two outgoings are led to 35/10kV C581 # 1


and substation 2 # main transformer. Use FS-YJY-26/35kV-1 * 300mm2 single-core cables


for Loop and buried pulling. Two 35kV lines to C581 are laid along different paths to


avoid damage of the two loops.


2)



B301S


变电站引出


7



10kV


出线。全部引至


B399


中心制冷站。回路 采用


10kV


截面为


95mm2


的三芯铠装电缆,由


B301S


南面现有的电 缆井引出直埋至装置。


Pull 7 10kV outgoings from


B301S


substation


to


B399central


refrigeration


station.


Loop


uses


10kV


three-core


armored cable with cross-section 95mm2 and pull out from the existing cable well in


the south of B301S then buried lay to the device.


3)



C581

< br>引出


10



10kV

< p>
线路,


分别为


A507


的 四台变压器,


B551


的两台变压器,


B553TDA


装置氢


气压缩机


2


台,


C521


盐酸装置氯气压缩机


1


台,盐酸压缩机


1


台 提供电源。其中,变压器回路


采用


10kV

截面为


185mm2


的三芯铠装电缆,马达回路采用


10kV


截面为


95mm2

< br>的三芯铠装电缆。


以上电缆线路均沿规划路径埋地敷设。


10


10kV


lines


led


from


C581


are


used


to


supply


power

-


-


-


-


-


-


-


-



本文更新与2021-02-10 17:02,由作者提供,不代表本网站立场,转载请注明出处:https://www.bjmy2z.cn/gaokao/630351.html

室外电缆沟施工方案(中英文)的相关文章

  • 爱心与尊严的高中作文题库

    1.关于爱心和尊严的作文八百字 我们不必怀疑富翁的捐助,毕竟普施爱心,善莫大焉,它是一 种美;我们也不必指责苛求受捐者的冷漠的拒绝,因为人总是有尊 严的,这也是一种美。

    小学作文
  • 爱心与尊严高中作文题库

    1.关于爱心和尊严的作文八百字 我们不必怀疑富翁的捐助,毕竟普施爱心,善莫大焉,它是一 种美;我们也不必指责苛求受捐者的冷漠的拒绝,因为人总是有尊 严的,这也是一种美。

    小学作文
  • 爱心与尊重的作文题库

    1.作文关爱与尊重议论文 如果说没有爱就没有教育的话,那么离开了尊重同样也谈不上教育。 因为每一位孩子都渴望得到他人的尊重,尤其是教师的尊重。可是在现实生活中,不时会有

    小学作文
  • 爱心责任100字作文题库

    1.有关爱心,坚持,责任的作文题库各三个 一则150字左右 (要事例) “胜不骄,败不馁”这句话我常听外婆说起。 这句名言的意思是说胜利了抄不骄傲,失败了不气馁。我真正体会到它

    小学作文
  • 爱心责任心的作文题库

    1.有关爱心,坚持,责任的作文题库各三个 一则150字左右 (要事例) “胜不骄,败不馁”这句话我常听外婆说起。 这句名言的意思是说胜利了抄不骄傲,失败了不气馁。我真正体会到它

    小学作文
  • 爱心责任作文题库

    1.有关爱心,坚持,责任的作文题库各三个 一则150字左右 (要事例) “胜不骄,败不馁”这句话我常听外婆说起。 这句名言的意思是说胜利了抄不骄傲,失败了不气馁。我真正体会到它

    小学作文