(整理)工程管理外文翻译

作者:高考题库网
来源:https://www.bjmy2z.cn/gaokao
2021-02-10 14:12
tags:

-

2021年2月10日发(作者:心扉)


.................





























































.................
























能源与建筑工程学院















工程管理










































































2015





4




10







































































.................


THINKING OF COST ENGINEERING PROJECT



Abstract:



The


premise


of


the


project


cost


management


is


to


meet


the


project


quality,


schedule, contract requirements, as for the project costs, as well as achieving the intended


target


by


planning,


organization,


control


and


coordination,


and


as


a


scientific


management activities to reduce the cost


As


far


as


possible.


It


is


mainly


through


technology


(such


as


the


selection


of


the


construction plan), economic (such as accounting) and management (such as construction


organization


management,


rules


and


regulations


etc.)


activities


to


achieve


the


intended


target and the purpose of profit.


Cost is the sum of all kinds of construction process in the project cost. The content of cost


management is very extensive, runs through every procedure and every aspect of project


management activities, from the signing of the contract to the construction preparation,


until the



completion acceptance, every link cannot do without the cost management. As


for the complete process of cost management to say, its content includes: cost prediction,


cost


control,


cost


accounting,


cost


analysis


and


cost


assessment,


etc..


Here


only


to


analysis


through


three


aspects


:project


cost


forecast,


cost


control,


the


effective


way


reduce the cost to elaborate.


1. Do a good cost forecast, identify the objectives of cost control



Cost


prediction


is


the


basis


of


cost


plan,


which


provide


the


basis


for


compiling


the


scientific, reasonable cost control target. Therefore, to improve the scientific cost forecast,


cost plan to reduce costs and improve economic efficiency, which plays an important role


in


engineering


management.


Strengthening


the


control


of


cost,


first


of


all


to


pay


more


attention on cost prediction is an essential behavior. The main content of Cost prediction


is


the


use


of


scientific


methods,


to


forecast


according


to


cost


target


of


the


project ,construction conditions, mechanical equipment, and the quality of personnel of


the project.



tion of



workers, material, cost



The first is to analysis the project's artificial cost price, then analysis the wages and


the market of the social workers , according to the amount of time and ready for the staff


to analysis if the accommodation is covered in the project contract price of labor cost.




The material costs accounted for a large proportion of Construction and installation


.................


.................


cost,


should


be


the


focus


to


accurately


grasp.


to


analysis


the


main


materials,


auxiliary


materials, other materials, approved materials supply locations, the purchase price, mode


of transport and handling costs. analysis the quota material specified in the specifications


with


the


actual


material


specifications


of


different


comparison


of


actual


use,


with


different cement content and quota ratio, pooled analysis of budget in other materials, in


the concrete practice to be mixed with a certain amount of admixture.




Fees


for


using


machinery:


the


models


and


the


number


of


machinery


and


equipment bidding application in the group is usually calculated by the construction


method of the quota, which is different from the actual construction site in some ways,


and


work


efficiency


is


also


different.


Therefore,


We


have


to


measure


the


actual


forecast


happen


machine


cost.


At


the


same


time,


we


also


have


to


calculate


the


amortization machinery rental possible fees and the purchase of new machinery and


equipment costs, approve the main mechanical shift production quota.



1.2 Prediction of cost changes caused by the plan of construction project


The project after winning the bid, must develop advanced and feasible in technology and


reasonable


construction


organization


design


according


to


the


actual


situation


of


the


construction


site


of


the


project,


combined


with


the


local


economy,


natural


and


geographical conditions, the construction technology, equipment selection, and the actual


situation of project scheduling. Comparing the different between the construction method


implemented by applying group and tender preparation time, or the different of quota of


construction method to design a correct prediction.


tion of aided engineering fee


Aided engineering refers to engineering quantity list or not given in the design drawings,


and


it


is


indispensable


in


construction,


such


as


concrete


mixing


station,


tunnel


construction of the three tube line two, high pressure into the hole, also need to predict by


construction plan for actual.


1.4 .Prediction of large temporary facilities fee


Prediction


of


large


temporary


work


fee


should


be


investigated


in


detail


and


fully


demonstration, to determine a reasonable target values.



tion



of



small temporary facilities fee, and the transferring of site fee



Small


temporary


facility


costs


include:


temporary


facilities


layout,


according


to


how


.................


.................


much


time


period


and


planned


to


invest


in


personnel,


equipment


to


determine


the


temporary facilities scale and standard, according to actual and reference of the historical


data for the control of construction in the objective value determination. The transferring


of site should be based on the distance and quasi transfer personnel, equipment to predict


the target value.


1.6. Prediction of the risk of out of control of cost


Risk analysis of project cost targets, is to implement the prediction of the factors that may


affect


the realization of ex ante analysis in


the project,


often can be


analyzed from


the


following aspects:


1) Understanding of the technical characteristics of engineering project, such as structural


characteristics, geological features.


2) On the analysis of the unit owners, including credit of owners of units , the availability


of funds, organization and coordination ability.


3)


Analysis


of


internal


project


organization


system,


including


the


construction


organization design, resources, quality and other aspects.


4) The analysis of traffic, energy, electric power of project in local site.


5) Analysis on climate.


In


short,


through


the


prediction


of


the


main


cost


above,


we


can


determine


the


control


standard of worker, material, machine and indirect costs, can also determine the needed


time


to


complete


this


project


in


the


long


period,


so


to


finish


the


target


control


of


the


management fee. Therefore, cost forecasting is the basis of cost control.


the cost objectives, determining the cost control principles


The


construction


project


cost


control


is


the


input


of


resources


in


the


implementation


process,


and


pay


attention


on


the


supervision


of


construction


process


and


the


results,


inspection and measurement, and to take measures to


ensure achieving the project cost


goals.


The object of cost control is project, its subject is the person's management activities, the


purpose


is


reasonable


use


of


manpower,


material


and


financial


resources,


reduce


cost,


increase benefit. Therefore, the general principle of cost control are:



2.1 Saving principle




Save means project save the human, material and financial resources construction, which


.................


.................


is


the


basic


principle


of


cost


control.


Saving


is


not


absolutely


negative


restriction


and


supervision,


but


to


create


a


condition


actively,


we


should


focus


on


the


per


inspection,


process control , and check the deviation in the implementation process, to optimize the


construction scheme, improve the scientific management level of the project to save.


2.2 The principle of full control


The principle of full control includes two meanings, namely the full staff control and full


process control.


1) Project full staff control


Cost control consists of all departments, team and staff in project organization of work


involved, and related to each of the vital interests of employees, so should fully mobilize


the enthusiasm of each department, each employee team for controlling and concerning


about


the


cost,


to


establish


full


control


idea,


if


we


only


consider


that


cost


control


is


responsible for ore settlement and financial matters, it is just one- sided.


2) The entire process of project cost control


The


project


cost


involves


the


entire


project


cycle,


the


whole


process


of


project


cost


formation,


from


the


beginning


of


construction


preparation,


through


the


construction


process


to


be


completed


after


the


transfer


of


the


warranty


period.


Therefore,


the


cost


control work is to accompany each stage of project construction, such as the formulation


of


optimal


construction


scheme


in


the


construction


preparation


stage,


according


to


the


requirements of design and construction specification for construction, make full use of


existing


resources,


reduce


the


construction


cost,


and


ensure


the


project


quality,


reduce


project rework fee and after the project there may form the transfer of the warranty cost.


In work



s acceptance stage, we have to adopt timely manner to the additional contract


price for the project settlement, so that the cost of the project from first to last can be hold


under effect management.


2.3 Target control principle


Target


management


is


the


basic


techniques


and


methods


of


management


activities.


It


realize the



plan policy, task, target and measures and make that to be implemented by


decomposition.


In


the


implementation


process


of


the


management


of


objectives,


target


setting


should


be


practical,


the


more


detailed


the


better,


to


implement


the


department,


team


and


group


or


individual;


target


responsibility


should


be


comprehensive,


not


only


have


the


responsibility,


but


also


to


have


more


responsibility


of


cost;


combining


the


.................


.................


responsibility,


right,


benefit,


make


effort


on


the


responsible


departments


(people)


for


examination and evaluation of the performance, and with the salary, bonus, do award or


publish.


2.4 Dynamic control principle


Cost control is carried out in a continuously changing environment management activities,


so we must adhere to the principle of dynamic control, dynamic control is to input the


labor,


material,


machine


into


the


construction


process,


to


collect


the


actual


value


cost,


compare


it


with


the


target


value,


check


whether


there


have


any


deviation,


if


without


deviation,


continued


the


process,


or


to


find


the


specific


reasons,


to


take


corresponding


measures.


The


implementation


of


cost


control


process


should


follow


the



management method, the so- called



problem which do not often


appear


in


the


project


construction


activities,


but


the


key


problem


of


cost


have


a


major


influence successfully completed, also must be attached great importance. In the project


implementation of process the


aspects:


1)


Importance:


general


is


difference


from


the


amount


of


point


of


view


which


have


important


significance,


it


is


called



if


we


have


to


determine


the


cost


difference


between


the


amount,


we


should


determine


the


percentage


difference


for


the


original standard according to the specific circumstances of the project. The difference


also can be divided into favorable and negative. The actual cost is lower than the standard


cost too much is not necessarily a good thing, it could cause two cases: one is the adverse


impact to the follow-up project or assignment: another may cause low quality, and lead to


rework and increased warranty cost, quality cost control also affect corporate reputation.


2)


Consistency:


although


some


of


the


cost


difference


is


no


more


than


the


percentage


specified or the minimum amount, but has been hovering near the upper lower limit line,


should also be regarded as


not accurate, should be timely adjusted according to actual situation.


3) Ability to control: some are project managers can not control the cost of the project,


even if significant differences occurred, should also be regarded as


land acquisition, demolition, temporary rental costs rise.


4) The particularity of the project construction: which have effect on the whole process of


project cost, even if the differences did not reach the importance position, should also be


.................


.................


paid attention to cost management. Such as mechanical repair expenses of the one-sided


emphasis on savings. It may reduce the cost in the short term, but due to lack of repair


may cause future downtime repair, thereby affecting the smooth progress of construction


production.


3 .To find effective ways ,and to achieve the cost control target


There


have


a


variety


methods


to


reduce


the


project


cost,


it


can


take


measures


from


organization technology, economy, to contract management.


3.1 Organizational measures taken to control engineering cost


First


of


all


to


clear


the


institutions


and


personnel


of


Project


Manager


Department


and


division


of


functions


and


powers


of


that.


The


project


manager


department


is


operating


management team,


it is appointed by legal


person of enterprise as his


representative to


power project management team, after the completion of the project this appointment will


collapse, so he is not an economic entity , and he is responsible for the overall interests,


also


should


coordinate


responsibility,


right,


interests



between


the


company


and


the


company.


Secondly, define the cost control and tasks, so that certain person will responsible for the


cost control, avoid there have unclear responsibility while problem happen.


3.2 To take technical measures to control project cost


Take technical measures is to give no limitation on subjective initiative of technical staff


in


the


construction


stage,


and


try


to


check


and


approve


technical


and


economic


demonstration which is necessary, then to seek more economic and reliable solution, thus


reduce the cost of the project, including the use of new materials, new technology, new


method to save energy, improve the mechanical operation etc..


3.3Take economic measures to control engineering cost


Economic measures to control project cost includes:



(1) The artificial cost control:


Labor costs accounted for a larger proportion of project costs, generally at about 10%, so


we should strictly control the labor cost. To control the amount of labor, we must reduce


or shorten labor consumption in some procedures, so as to reduce the labor consumption,


control engineering cost objective.



(2) Control material cost:


The cost of materials general of the total project cost of the 65%~75%, directly influence


.................

-


-


-


-


-


-


-


-