关键词不能为空

当前您在: 主页 > 英语 >

多层住宅建筑给排水设计的几个问题(外文翻译)

作者:高考题库网
来源:https://www.bjmy2z.cn/gaokao
2021-02-10 12:35
tags:

-

2021年2月10日发(作者:七届二中全会)


****


学院本科毕业设计












































































原文



The multilevel residential housing is given and drains off water several


questions designed



Summary : This text give and drain off water on multilevel residential housing design supply water the


exertion of the tubular product , Way of laying of pipeline, water gauge produce family set up,


establishment and air conditioner condensation water of pot-type boiler discharge issue goes on the


discussion , And put forward some concrete views.



Keyword: Skyscraper, supply water the tubular product , the pipeline


is laid, The water gauge, the solar


water heater






The skyscraper is simple with its auxiliary facility, the fabrication cost is low, the characteristic such


as being convenient of estate management, Receive the welcomes of the real estate developer and vast


resident of small and medium-sized cities very much. How project planning and design of inhabited region,


scientific and technological industry of comfortable house, lead the request according to 2000, Improve the


design level of the house, build out a comfortable living space for each household, It is each designers duty.


As the heart of the house --The kitchen, bathroom, is that the function is complicated, hygiene, safe and


comfortable degree are expected much, It is miscellaneous to build, the space expecting much in


technology. So, the designer must consider synthetically with the idea and method of global design that the


kitchen, bathroom give installation of the drainage pipeline and equipment,etc. . Give and drain off water


on skyscraper design supply water exertion, to lay pipeline of tubular product, water gauge produce family


set up, establishment and empty of pot- type boiler now Transfer condensation water discharge issue


discuss together with colleagues.







( 1)supply water tubular product select problem for use Traditional watersupply tubular product adopt


zinc-plated steel tube generally, because zinc-plated steel tube exchange the corrosion, Use short-lived ,


use for and send domestic water can satisfied with water quality sanitary standard shortcoming, Ministry of


Construction is popularizing the application of the feed pipe of plastics energetically . A


lot of districts and


cities have already expressed regulations: Forbid designing and using the zinc- plated steel tube , use


widely the feed pipe of plastics. The plastics supply water In charge of compared with metal pipeline, light,


it is fine to able to bear the intensity of keeping, Send obstruction little liquid , able to bear chemistry better


to corrode performance, it is convenient to install, The steel energy- conservation of the province, merit of


having long performance life etc.. Supply water and use plastics pipeline: Hard polyvinyl


chloride( PVC-U), high density polyethylene( HDPE), pay and unite polyethylene( PEX) , modify the


polypropylene( PP-R, PP-C), gather butene( PB), aluminium mould and compound and in charge of and


the steel is moulded and compound and is managed etc.. Choice of tubular product economic comparative


course of technology, technology should from pressure, temperature, environment for use, install


method,etc. go on and consider, Combine owners at the same time request and the house of grade,carry on


and fix after being consider synthetically technology not economic. The above plastics supply water


tubular product can supply water tubular product as house life. The economic and functional house


conciliating Strand room in the face of the masses of with low- and medium-level incomes resident, can


select for use hygiene grades of hard polyvinyl chloride in charge of as feed pipe mainly, In order to reduce


the fabrication cost; Medium-to-high grade commodity apartment available aluminium Mould and


compound and in charge of or other plastics supply water the tubular product as the feed pipe. House mix


hot water temperature that water order exceed 600 C, so above-mentioned tubular product in charge of


except hard polyvinyl chloride and aluminium plastics compound and in charge of( PE- AL-PE), Mostly the


tubular product can be regarded as the hot water pipeline of the house.





( 2) pipeline lay problem 1. give and drain off water it set up there arent one that in charge of



****


学院本科毕业设计












































































原文




1)Will install it in the corner place of the kitchen, bathroom tomorrow. Adopting this kind of way of


laying


more


in


the


design


of


house


in


the


past,


it


is convenient


for


it


to


construct,


But


will


reveal


the


pipeline and hinder the room beautifully tomorrow Watch, the households will mostly be hidden with the


light quality material in the equipment two times.




2)Will


install


it in the overcast angle place of the outer wall of the building tomorrow. Way this


suitable for southern weather warm district only, the minimum temperature in winter cant be lower than


zero degrees Centigrade, In case water pipe water-logging freeze ice is bloated to split pipeline, influence


household use. Pipeline lay


in outer wall, influence building to be beautiful, too inconvenient on manage


and maintain in the future.




3)Lay it in the pipeline well. This way makes the room clean and beautiful , but the pipeline well


has taken up the area of the bathroom, And pipeline construct, maintain relatively more difficult. Bathroom


set up concentrate pipeline well, concentrate pipeline on assign in the well feed pipe, drain pipe, This is


that the civilized


importance lives


in the kitchen of comfortable house, bathroom Embodiment. I think :


Should


consider


the


establishment


of


the


pipeline


well


of


the


bathroom


in


the


medium-to- high


grade


building conceptual design of commodity apartment, Improve quality of using of bathroom promptly so ,


can


solve


hard


polyvinyl


chloride


drain


pipe


rivers


noise


heavy


problem,


Improve


the


environmental


quality level of the room; Whether for bathroom


in the areas for little economic and functional house and


Overcome


difficulties


room,


warm


area


give


and


drain


off


water


and


set


up


and


in


charge


of


and can


consider


and


lay


in


the


outer


wall


in


the


South,


In


order


to


increase


using


the


space


of


the


bathroom;


Pipeline


install


and


in


the


room,


should


influence


kitchen,


bathroom


every


sanitary


equipment


use


of


function tomorrow





supply water and prop up there arent tube House supply water prop up and in charge of pipe diameter


one



32mm,


de


of


battle,,


little


plastics


feed


pipe


of


pipe


diameter


is


the


crooked state, So


the


house


supplies


water


and


is


propped


up


and


in charge


of


being


recommended


and


adopted


and set


up


secretly.


Supply water to prop up to manage darkly There are thes way had:




1)Set up in the brick wall secretly. Wall turn on and in charge of trough in brick when constructing,


in charge of trough width tube +20 mm, de of external diameter,, degree of depth tube external diameter de,


The pipeline is imbedded and managed directly Trough, and with in charge of card fix in trough of inning


charge of son.



2)Whether pipe diameter supply water and prop up and last de


≤ 20mm,can set up at floor secretly


piece make level by layer. Turn on and in charge of trough in floor( ground) the board when constructing, it


wides trough have to be de +10 mm deeply 1/2 of the de, Half pipeline imbed and in charge of trough, and


with in charge of card fix in trough of inning charge of tube. Aluminium mould compound and in charge of


and


pay


and


unite


polypropylene


in


charge


of


pipeline


adopt


metal


pipe


fittings


connection,


Must


strengthen and in charge of trough size when adopting and set up secretly, and rivers some flood peak loss


relatively


heavy.


Assign


the


relative


house


that


concentrated


to


the


kitchen,


bathroom


interior


hygiene


utensil, Can adopt


and divide Water device go on and


join , divide water device whether one more than


branch


in


charge


of


and connect,


every


hygiene


utensil


supply


water


and


prop


up


and


in


charge


of


and


connects and publishes from the water dividing device separately. Can already prevent the tube burying the


pipeline secretly from being connected like this Permeate the question. Can reduce some flood peak lost,


decrease the fabrication cost of pipe networks






3)Drain off water and prop up the tube to lay House room drain off water and in charge of and should


set


up


at


the


time


of


inning


this


each,


drain


off


water


and


in


charge


of


permeating


sideways


like


this


canning prevent the sewage from waiting for the pollutant to enter the neighbor family sideways, Will not


influence


the


neighbor


either


when


the


pipeline


is


maintained


Normal


life


of


one.


Kitchen


wash water


drainage of basin propped up and in charge of generallying


inserts draining off water to stand to


manage


****


学院本科毕业设计












































































原文



this layer of floor sideways; Floor drain drain off water propped up and in charge of laying the room of


lower floor. A


lot of colleagues think now: Whether kitchen the ground it lay ceramic tile of,whose name is


clean


in


when


need


develop


with


water,not strong


in


meaning


to


set


up


floor


drain,


So


kitchen set


up


ground


floor


drain,


avoid


and


drain


off water


and


prop


up


and


in


charge


of


and


enter


neighbor


family


sideways already so, Can increase using the space of the kitchen . Bathroom drain off water and prop up


and in charge of and lay concrete measure have in this layer sideways inside:




1)Improve the bathroom ground . Ground tendency high 150mm, adopt back row type take stool


pot, washing basin, bath tub, water drainage of floor drain in charge of and bury in cushion layer secretly


sideways.



2)Adopt


the


sinking


type


bathroom.


Bathroom


sink


350mm


the


floor,


hygiene


utensil


drain


off


water and in charge of and bury on sinking space secretly sideways







Two method these can realize water drainage of bathroom prop up and in charge of earths surface to


bury underground this one without entering the neighbor family sideways. Bury pipeline when installing,


construction


quality


must


check


on


strictly,


can


construct


bathroom


ground


after


confirming


qualified


secretly, So as not to leave the hidden danger in giving in the future using. Bathroom ground construct and


can pack coal ash light quality material , also can adopt and lay bricks impracticable to lay plate making


construct


ground,


Ground


must


make


waterproof


to


deal


with,


method


can


waterproof


to


deal


with


according to roofing, make two oil one rubber and plastic ointment waterproof cloth.









3) water gauge the open air set up problem The water gauge is had indoors, not only the work load


of checking meter is very heavy , but also make the security and privacy of the house reduce greatly . So


house


divide


into


households


of water


gauge


or


divide


households


of


figure


of water


gauge


Show


that


should


be set


up


in


the


open


air.


Skyscraper


water


gauge


the


open


air set


up following


several


kinds


of


forms: Whether far it pass by water gauge Change the ordinary water gauge into and pass the water


gauge


far,


is


joined


the


water


gauge


and


data


gathering


machine


by


a


signal


line,


And


then


reach


intelligence to manage( the computer). Its merit lies in saving a large amount of people Strength comes to


check


meter,


the


data


are


accurate,


the


shortcoming


is


that


the


fabrication cost


is


high.


Whether



magnetic


stripe


card


of


by water


gauge


Users


buy


the


electronic card


of


the


running water


Company


in


advance


,


then


insert


it


in


the


storing


device


of


the


water


gauge,


Card


amount


of


money


deduct


automatically on the water, this way user need to prepay the water rate, The price of the water gauge is


relatively high.





adopt it set up at the open air water gauge not ordinary




1)The water


gauge


is


set


up


in


the


stair


have


a


rest


in


the


alcove


of


the


platform.


Household


watersupply to


prop


up


and


manage


and


enter


the


kitchen,


bathroom


after


the water


gauge


is


measured.


Way this realize water gauge produce room set up, equivalence low project have , supply water and set up


and in charge of and set up with water gauge office results in aesthetic problems in stair. It suitable for the


South warm district kitchen, bathroom assign close to the houses of positions of staircase.




2)The water gauge concentrates on being set up among the water gauges( meter box). Person who


give


when supplying


water,


set


up water


gauge


in


ground floor( meter


box)


on


falling,


every


household


watersupply to prop up and is in charge of applying having


in the pipeline well, Southern area can overcast


horn


place


lay


along


the


outer wall


in


building


too;


Person who


give


when


supplying


water, can set


up


water gauge in roof( meter box) under upgoing. This way increases and supplies water to prop up In charge


of and lay length, pipeline lay and influence building to be beautiful along outer wall. Water gauge produce


way


choice


that


family


assign,


must


combine


house


kitchen,


bathroom


plane


assign


characteristic


and


concrete request of developer, Carry on to several feasibility scheme the above economic technology fix


after comparing. Property well-managed medium-to-high grade commodity apartment of housing district,


can adopt and pass the water gauge far , It is that the water gauge will use the developing direc


tion in the


****


学院本科毕业设计












































































原文



future;


Estate


management


perfect


medium-


to-high


grade


commodity


apartment


of


housing


district, can


adopt magnetic stripe card water gauge( Company have this kind district of business can design in running


water) Or concentrate on setting up it among the water gauges( case); Southern area unit type house can set


up rest platform office in stair with ordinary water gauge, In order to reduce the fabrication cost.






4) establishment question of the pot-type boiler Should reserve and install hot water supply terms of


facility, set up hot water supply facilities with when the design of house. Have and concentrate house that


hot water supply on , should consider house assign with installation position and cold hot water pipeline of


hot water device. The pot-type boiler generally has three kinds, such as gas, electricity, solar energy,etc..


Whether


last


kitchen


gas


heater


and


electric


heater


or


Bathroom


inside,


give


when


draining


off


water


design


shoulding


reserve


installation


position


and cold


hot water


interface


of


pipeline


of water


heater


in


advance in building, Install by oneself when convenient users fit up. Solar energy and hot water It is simple


and convenient and safe for device to use, need fuel and electric power is low to run the expenses, Have


long performance life, pollution-free, received by the masses of users favourably very much, Many houses


have been small


in recent years The district all


install the solar water heater at the time of designing and


construct. Solar


water


heater


install


and


at


the


roof,


need


to set


up


the cold


hot


water


pipeline


among


bathroom


and water


heater


of the


roofing


like


this


generally,


Consider


installation


of


solar water


heater


when the design of house, household can only lay cold and hot pipeline along the building outer wall when


installing in the future, Increase household degree of difficulty when installing like this , increase pipeline


make


the


investment,


influence


building


beautiful.


Give


when


draining


off water


the


design


needing


to


solicit


the


developers


suggestion


first


in


building,


Interconnected


system


one


design, construct


the


solar


water heater in unison; Reserve solar water heater and cold hot water installation position of pipeline in


advance only. The cold hot water pipeline of the solar water heater can be laid In the pipeline well; Set up


pipeline house of well , can set up one UPVC drain pipe of de110 as solar water heater hot water sleeve


pipe of pipeline close to corner of person who take a shower in bathroom, Set up a de110 *75 three direct


links in each hygiene interval ground, as connecting the entry of cold and hot water pipe





(


5)


air


conditioner condensation


ink


discharge


the


issue


In


recent


years,


air conditioner


enter


huge


numbers


of


families


gradually,


condensation


water


amorphous


to


discharge


the


building


outer


wall


of


pollution air conditioner have, Have influenced a beautiful important problem of biotope already. Building


give


when


draining


off water


design


shoulding


consider


air conditioner


condensation


ink


discharge


in


a


organized


way.


Concrete


method


can


machine


set


up


the


water


drain


pipe


of


the


condensation


by


the


position outside reserving air conditioner, Drain off water and set up and in charge of and select PVC-U


drain pipe de40 for use , reserve three direct links of draining off water highly in each air conditioner, It is


convenient for air conditioner to drain off water hose insert directly.

-


-


-


-


-


-


-


-



本文更新与2021-02-10 12:35,由作者提供,不代表本网站立场,转载请注明出处:https://www.bjmy2z.cn/gaokao/629102.html

多层住宅建筑给排水设计的几个问题(外文翻译)的相关文章

多层住宅建筑给排水设计的几个问题(外文翻译)随机文章