TBM Second Stage Beijing Machine C.O. Report Zhang Li 2003/08/17



TBM Second Stage Beijing Machine C.O. Report




1. C.O. Basic Information



Reference:


TBM second stage operator





Date:


08/14/2003



Shift:


middle shift (1B)





Site


: B-02


Operator:


2954




Analyst:


Zhang Li



Start time:


14:48







End time


: 22:55



Product


: 032.011 (175/65R14 82T R23


)



2. C.O. Result


Production:


170



Hourly Outpu t


35


30


30


t


u


25


25


29


p


t


20


15


19


20


u

10


14


15


18


o


5


0


1

2


3


4


5


6


7


8


Hour


output


3. Cycle Time Analysis



Time for building one bandage (not including weighing & VCVB)


Total Average:


1.54 min


Total Median:


1.45min


Cycle Time Distribution (not including weighing & VCVB)


e


g


70


61


a


60

n


d


a


50


b


40


34


39

f



o



30


22


r


e


20


9


m


b


1 0


4


1


n


u< /p>


0


5


0


5


0


0


0


0

< p>
3


5


7


0


5


0


0


.

.


.


.


.


.


.


1


1


1< /p>


2


2


3


3


~


~


~


~

< p>
~


~


>


0


5


0


5


0

0


0


3


5


7


0


5


.


.< /p>


.


.


.


.


1


1


1


1

< p>
2


2


cycle time



1


TBM Second Stage Beijing Machine C.O. Report Zhang Li 2003/08/17


Cycle Time (not including weighing & VCVB)


3.50



c


y


c


l


e

< br>


t


i


m


e



(


m


i


n


)


3.00


2.50


2.00


1.50


1.00< /p>


0.50


0.00


cycle time


1


0


1


1


1


1


1


2


1


1


3


1


1


4


1


1

< br>5


1


output


1

< p>
6


1


1


1


2


1


3


1

4


1


5


1


6


1


7


1


8< /p>


1


9


1


1


From the Cycle Time Trend Chart, the real cycle time(not including weighing & VCVB) can be


1.35 min.





Time of Weighing & VCVB


2 actions, weighing and VCVB, are required now to get the quality of bandages


controlled. After time study in this continuous observation, the normal contribution to the


cycle time of these 2 actions is defined as 0.15 min.



Cycle Time


Through time study, the target cycle time is figured out as 1.50 min/unit.



ement



1)



Material Change


Material


Changing Time


NST


26.78


Booking Cart


4.68


NSF


3.51


Carcasse Cart


1.68


total


36.65



Changing Time Breakdown


5%


NST

Booking Cart


10%


13%

< br>72%


NSF


Carcasse Cart



2

-


-


-


-


-


-


-


-