复合土工膜防渗施工方案
compound
geomembrane anti-seepage
construction
plan
1.0
项目简介
:
1.0 project introduce:
基于环境保
护的目的,
业主拟采用先进的技术工艺,
使铺设在
100m
×
100m
×
p>
1.5m
的蒸发池池底和池侧的复合土工膜形成一扇完全封闭且质量
优良的防渗漏墙,
以阻止蒸发池内的含油物质进入到蒸发池外的自然环境中。
2.0
施工方案
2.1
复合土工膜施工工艺原理
2.1 composite geomembrane construction
technology principle
复合土工膜是
一种土工合成材料,具有较好的防渗效果,一方面将复合土工膜
铺设在需要进行防渗处理
堤段坡面上,
利用自身的连接形成一整体坡面防渗体,
另一方面
使坡面铺设的复合土工膜的下部与坡脚垂直防渗墙进行连接,使复合
土工膜与坡脚防渗墙
形成一整体,另外,复合土工膜上部与压顶路肩梁相接,
使堤基防渗墙,坡面复合土工膜
,堤顶压顶砼形成一个整体完全封闭的防渗体
系。
Composite
geomembrane
is
a
kind
of
geosynthetic
materials,
good
anti-seepage
effect, on the
one hand, the composite geomembrane laid side
slope in some seepage
prevention
treatment
is
required
to
use
their
connections
to
form
a
whole
slope
seepage prevention body, on the other
hand to make the bottom of the slope surface
of
composite
geomembrane
laid
connection
with
slope
toe
vertical
cut-off
wall,
composite geomembrane
and
slope
foot
cut-off
wall
to
form
a
whole,
in
addition,
composite geomembrane upside and coping
shoulder beam, the cut-off wall in the
dam
foundation
and
slope
of
composite
geomembrane,
new
coping
completely
closed anti-
seepage concrete forming a whole system.
2.2
复合土工膜施工工艺流程
2.2 composite geomembrane construction
process
在复合土工膜铺设前,大堤迎水面土方填筑
及坡面修整完毕,坡面平整度、压
实度均达到设计要求并经监理工程师验收合格后方可进
行复合土工膜的铺设,
本工程复合土工膜铺设的工艺流程包含但不限于下述内容:
Before composite geomembrane
laying, levee meet the earthwork filling and slope
surface
dressing,
slope
surface
roughness,
degree
of
compaction
shall
meet
the
design requirements and the supervision
engineer acceptance rear can for composite
geomembrane
laid,
composite
geomembrane
laid
the
technological
process
of
this
project
included (not limited) as follows :
---
蒸发池池底平整压实与检查
---
蒸发池堤岸平整压实与检查
---
土工膜材料检查
---
土工膜场外拼接
---
土工膜铺设
---
土工膜施工拼接
---
修补与处理
---
锚固沟开挖
---
土工膜锚固施工
---
保护层施工
---
交工验收
2.3
蒸发池土建施工:
2.3.1
蒸发池池底平整压实
p>
采用压路机对池底进行压实,普氏测试压实度达到
85%
,并及时平整压实中对
土工膜产生不利影响的地方。
2.3.2
蒸发池堤岸平整压实
采用压路机对蒸发池堤岸进行压实,普氏测试压实度达到
85%
,并及时平整压
实中对土工膜产生不利影响的地方。同时按业主
要求保证土壤的质量要求,使
堤岸倾斜度为
1
< br>:
2.
2.3.3
堤坡的清理
、平整场地,清除一切尖角杂物,欠坡回填夯实、富坡削坡挖
平后经监理验收合格,为复
合土工膜铺设提供工作面。
2.3.3 clean up
of dike slope and flat field, remove all sharp
corners, owe rich backfill
compaction
of the slope, slope cutting slope dig flat after
supervision acceptance, for
composite
geomembrane laying face.
2.4
复合土工膜施工
2.4composite geomembrane construction
2.4.1
复合土工膜材料检查
2.4.1.1
相关文件检查
本工程所用复合土工膜为一布一膜
针刺复合土工膜,是国家经贸委公布重点土
工合成材料生产企业
');
企业,湖南湘维有限公司生产产品,使用前委托南京
水利
科学研究院实验中心对产品的各项技术指标进行检测,各项指标均符合标
准规定和设计要
求。
2.4.1.1
composite
geomembrane
materials
quality
testing
this
project
used
composite
geomembrane to two
cloth membrane composite geomembrane, is published
by the
state
economic
and
trade
commission
key
geosynthetic
materials
production
enterprises');
nanjing before use water conservancy
science research institute technical indicators
of
experimental
center
of
product
testing,
the
indicators
are
in
line
with
the
prescribed standards and design
requirements.
2.4.1.2
厚度尺寸检查
利用检查设备和仪器对土工膜的幅宽、长度和厚度进行检查。使用材料规格数
< br>量如下:
---liner:14000m
2
HDPE,thk:1mm;
---bottom
layer:200gr/cm
2
geotextile.
2.4.2
土工膜场外拼接
为了施
工方便,
保证拼接质量,
复合土工膜应尽量采用宽幅,
减少现场拼接量,
施工前应根据复合土工膜幅宽、现场长度需要,在厂内
剪裁,并拼接成合符要
求尺寸的块体,卷在钢管上,人工搬运到工作面铺设。
2.4.2
geomembrane
field
joining
together
in
order
to
convenient
for
construction,
ensure the
quality of stitching, composite geomembrane
breadth should be adopted
as far as
possible, decrease the scene splicing, before
construction should according
to the
requirements of the composite geomembrane width,
length, cut in the factory,
and
spliced
into
the
required
size
of
the
block,
to
roll
on
the
steel
pipe,
manual
handling to the face.
2.4.3
复合土工膜的铺设
2.4.3 the laying of composite
geomembrane
2.4.3.1
复合土工膜的铺设方法
2.4.3.1the composite geomembrane laying
method
复合土工膜铺设分齿槽坡脚平台铺设、坡面铺
设两个部分,齿槽坡脚平台铺设
结构形式见大样图
A
,该项工程应在堤基垂直防渗墙施工结束,齿槽开挖符合
要求,坡脚平台验
收合格后进行。铺设方法:沿防渗墙轴线方向水平滚铺。坡
面铺设在坡面验收合格后,从
堤顶向堤脚沿垂直于堤轴线方向缓慢展铺到坡脚
处与坡脚平台铺设丁字形相接。
Composite
geomembrane
laid
the
cogging,
slope,
slope
toe
platform
laid
laid
two
parts,
tooth
trough
slope
toe
platform
laying
structure
see
details
A,
the
project
should be at the end
of the vertical cut-off wall construction in the
dam foundation,
the tooth
groove
excavation
conforms
to
the
requirements,
after
the
acceptance
of
the slope
toe platform.
Laid
method:
along the
axis direction
of
horizontal
cut-off
wall. Upon the
acceptance of spread in slope, slope toe from new
slowly along the
direction
perpendicular to the axis of the dike exhibition
shop to the slope and slope
toe
platform laid into the crowd.
2.4.3.2
复合土工膜的铺设技
术要求
2.4.3.2 composite
geomembrane laying technology requirements
铺设应在干燥和暖天气进行,为了
便于拼接,防止应力集中,复合土工膜铺设
采用波浪形松驰方式,富余度约为
1.5%
,摊开后及时拉平,拉开,要求复合土
工
膜与坡面吻合平整,无突起褶皱,施工人员应穿平底布鞋或软胶鞋,严禁穿
钉鞋,以免踩
坏土工膜,施工时如发现土工膜损坏,应及时修补。
Laid
shall be carried out in a dry and warm weather, in
order to facilitate splicing,
prevent
stress concentration, composite geomembrane laying
adopts wavy relaxation
method,
degree
of
surplus
is
about
1.5%,
spread
out
in
a
timely
manner
after
flattening,
and
required
composite
geomembrane
with
slope
surface
level
off,
without ridges fold,
construction personnel should wear cloth shoes
with flat or soft
rubber
shoes,
it
is
forbidden
to
wear
cleats,
in
order
to
avoid
stepping
on
geomembrane, if discover
geomembrane during construction, should be
repaired in a
timely manner.
2.4.4
复合土工膜施工拼接
-
-
-
-
-
-
-
-
-