-
问题名称:
关于
gN
odeB
标识长度异常导致
NR
添加成
功率低的问题分析和总结
现象概述:
NSA
终端驻留在
9FXYCX
新钢步
行街
(
桂花村
)1800-FDD1<
/p>
锚点小区,
PCell
用
户添加
SN
成功率极低。
1
、
问题分析
①
主节点添加
SN
信令如下:
UE
MN
1.
SgNB Addition Request
SN
S-GW<
/p>
MME
2. SgNB Addition Request
Acknowledge
3.
RRCConnectionReconfiguration
4.
RRCConnectionReconfigurationComplete
5.
SgNB Reconfiguration Complete
6. Random
Access Procedure
7. SN Status
Transfer
8. Data Forwarding
Path Update procedure
11. End Marker
Packet
9. E-RAB Modification
Indication
10. Bearer
Modication
12. E-RAB Modification
Confirm
1.
The MN
decides to request the SN to allocate resources
for a specific E-RAB, indicating E-
RAB
characteristics (E-RAB parameters, TNL address
information corresponding to bearer
type). In addition, for bearers
requiring SCG radio resources, MN indicates the
requested SCG
configuration
information, including the entire UE capabilities
and the UE capability
coordination
result. In this case, the MN also provides the
latest measurement results for SN to
choose and configure the SCG cell(s).
The MN may request the SN to allocate radio
resources
for split SRB operation. The
MN always provides all the needed security
information to the SN
(even if no SN
terminated bearers are setup) to enable SRB3 to be
setup based on SN decision.
In case of
bearer options that require X2-U resources between
the MN and the SN, the MN
provides X2-U
TNL address information for the respective E-RAB,
X2-U DL TNL address
information for SN
terminated bearers, X2-U UL TNL address
information for MN terminated
bearers.
In case of SN terminated split bearers the MN
provides the maximum QoS level that it
can support. The SN may reject the
request.
NOTE 1:
For split
bearers, MCG and SCG resources may be requested of
such an amount, that the
QoS for the
respective E-RAB is guaranteed by the exact sum of
resources provided by
the MCG and the
SCG together, or even more. For MN terminated
split bearers, the MNs
decision is
reflected in step 1 by the E-RAB parameters
signalled to the SN, which may
differ
from E-RAB parameters received over S1.
NOTE 2:
For a specific
E-RAB, the MN may request the direct establishment
of an SCG or a split
bearer, i.e.,
without first having to establish an MCG bearer.
It is also allowed that all E-
RABs can
be configured as SN terminated bearers, i.e. there
is no E-RAB established as
an MN
terminated bearer.
②
相关指标如下:
9FXYCX
新钢步行街
(
桂花村
)1800-FDD1
几乎都添加失败。
新钢步行街
FDD--
锚点
小区内所有
LTE-NR NSA
DC
的
开始时间
2020/6/13
2020/6/14
2020/6/15
PCell
用户
SgNB
增加尝试总次
数
(
无
)
5332
4969
1328
小区内所有
LTE-NR NSA DC
的
PCell
用户
SgNB
增加成功总次
数
(
无
)
113
69
10
增加成
功率
2.12%
1.39%
0.75%
其他锚点小区均成功。
抱石名居
FDD-
锚点
小区内所有
LTE-NR NSA
开始时间
2020/6/12
2020/6/13
2020/6/14
< br>DC
的
PCell
用户
SgNB
增加
尝试总次数
(
无
)
3534
2917
2295
小区内所有
LTE-NR NSA
D
C
的
PCell
用户
< br>SgNB
增加
成功总次数
(
无
)
3534
2917
2295
100.00%
100.00%
100.00%
增加成功率
2020/6/15
1141
抱石民居
5G
1141
100.00%
LTE-NR
NSA DC
场景下收到
SgNB
增加
尝试的次数
(
无
)
3795
3004
2345
692
LTE-NR NSA DC
场景下发送
SgNB
增加成功的次数
(
无
)
增加成
功率
开始时间
2020/6/12
2020/6/13
2020/6/14
2020/6/15
3795
100.00%
3004
100.00%
2345
100.00%
692
100.00%
指标恶化时间(
4<
/p>
月
29
日开始恶化)
:
5G
侧提取情况:
从锚点和
NR
的性能统计来看,锚点的尝试次数比
NR
的尝试次数要多,说
明
eNB
到
gNB
的部分请求,
NR
侧就没有收到。华为性能采样点如下:<
/p>
③
查询
X2
链路情况:
华为配置
4/5G
站点
X2
链路步骤:
第一步:核查
X2
链路,控制面和用户面端节点资源组
ID=16
第二步:
gNB
的
IP
地址
1
0.143.74.136
第三步
:控制面
SCTP
链路号
=71161
第四步:用户面链路号
=70939
第五步:查询端节点组
截止这里,
eNB
< br>侧
X2
链路添加都没有问题。
在查询该锚点的
X2
接口信息(
5G
基站的站号
504707,4G
也有一个
504707
站点)
< br>
在
X2
接口信息中只有邻基站的标识,确存在
2
条
X2interface
和
X2
锚
点到
gNB
的
X2
没问题,反过来核查
gNB
到锚点的
X2
情况。
高能上城
57
栋
Host
地址:
p>
10.143.72.19
核查步骤如下:
第一步:控制面模板
第二步:控制面
SCTPHost
和
SCTPPEER