合同模板
Contract
建筑装饰工程施工合同
Contract
发包方(简称甲方)
Party
A:
承包方(简称乙方):上海
装饰设计有限公司
Party B:
i-point design (Inspiration Point Design)
根据
<
中华
人民共和国合同法
><
中华人民共和国消费者权益保护法
><
中华人民共和国价格法
><
上海市合同格式条款监督条例
>,<
上
海市建筑市场管理条例
>,
以及其他有关法律法规规
定的原则,结合本工程的具体情况,甲、乙双方在平等、自愿、协商一致的基
础上达成如
下协议,共同遵守
According to: “PRC
Contract Law”, “Law on the Protection of Consumer
Interests”, “PRC Price Law”, “Shanghai
Su
pervision of
Contract
Terms”, “Shanghai Construction Market Management
Regulations”, as well as other laws and
regulations relevant to
the specific
circumstances of this project, parties A and B
have hereby equally and voluntarily entered into
the following
agreement executed on the
basis of mutual respect.
一、概况
OVERVIEW
1.
甲方装饰物业系合法物业
Party
A is the owner of the property.
2.
乙方为本市经工商行政管理机关核准登记,并可从事装潢装修
的企业
Party B is approved and
registered with the city industrial and commercial
administrative organs as an
enterprise
engaged in renovation and decoration.
3.
装饰施工地点
Construction site:
4.
建筑结构:
建筑面积
平方米,施工面积
平方米。
2
2
Construction
area: total area (including stairwells and other
common areas):
m
, private
living area:
m
.
5.
装饰施工内容:住宅装饰
,
详见附件一
<
工程估价单
>
Structure: residential.
6.
承包方式
:
详见附件一
<
工程估价单
>
Contractor engagement method: See annex
–
(quotation).
7.
总价款:
.00
元,大写
< br>(
人民币
):
元整。
Total price:
.00
RMB; in words:
元整
. Any changes in this
price must be agreed
by both parties in
writing.
8.
工期
:
自
年
月
日开工,至
年
月
p>
日前竣工
,
工时总计
天,不含国家法定节假日
p>
,
乙方委派现场
施工监理为
先生,联系方式
:
Period: Start:
(year)
(month)
(day);
Completion before:
(year)
(month)
(day); Total days
(excluding
national holidays):
days. Party B's on site
construction supervisor will be:
二、关于工程付款及结算的约定
TERMS OF PAYMENT
1.
工程款的付款方式如下
The
payment schedule shall be as follows:
合同签订后
60%
After
the contract is signed.
付
款
时
间
Timing of Payments
付
款
时
间
Amount (RMB)
Date ()
油漆工进场前
30%
When
half
of
the
project
period
time has elapsed.
家具、灯具进场前
5%
Furniture
of
lamps
and
lanterns,
before
the approach
验收合格后
,
五天内
5%
Upon Acceptance of
the completion of the
project.
增加工程项目
100%
Project changes.
空调工程项目
100%
Air
conditioning project
家具工程项目
100%
Furniture engineering
签订工程项目变更单
100%
Date of signing for the project change.
-
-
-
-
-
-
-
-
-