九、设备制作周期:
Manufacture
cycle:
设备制作周期:收到定金之日起
150
个天完工(制作时间
100
天、安装调
试时间
50
天)
。
Complete in 150
working days after receive down payment
(manufacture time: 100
days,
installation and commissioning time: 50
days)
十、售后服务及质量保证:
After Sales
Service & Warranty
:
1
、售后服务保证:
After
Sales Service & Warranty
:
A
、设计图纸:
Design
Drawing
乙
方在设备验收前,
向甲方交付:
文字版或电子版技术资料一套,
包括:
设备主要性能、技术参数、主要机械结构图、网管图、电
器原理图及接
线图。
Before
acceptance
of
the
equipment,
HEKEDA
will
supply
the
following
documents to the
customer: 1 set English text version and Chinese
version or
an
electronic
version of the
technical information,
including: major equipment
performance
data,
technical
parameters,
the
main
mechanical
structure
drawings, piping
diagrams, electrical schematics and wiring diagram
B
、使用说明书
Operation
instruction
< br>乙方在设备验收前,
向甲方交付:
设备使用手册及维护保
养手册各一套。
Before acceptance of
the equipment, HEKEDA will supply 1 set of
equipment
operation manual and
maintenance manual in English version to the
customer.
C<
/p>
、易损件、关键部件
Consumable Parts and
main parts:
乙方在设备验收前,向甲方交付一套易损件、关键部件的清单。
Before the acceptance of the equipment,
HEKEDA will supply the consumable
and
main parts list to the customer
D
、技术培训
Technical
Training
技术培训人员为机电工程师和现场操作工人,
培训内容为机械及电气维
< br>修、保养和生产线操作。
Provided
technical
training
for
the
operators,
training
content
is
including
mechanical and
electrical repair, maintenance and plating line
operation.
E
、质保期及服务方法
Warranty Period &
Service
乙
方所提供的设备保修期为一年。
保修期内,
凡该生产线所出现的
非人
为因素损坏故障,
乙方都将负责免费维修。
对其它原因造成的损坏,
以
及保修期结束后,乙方仍将
以优惠的价格为需方提供服务。
Warranty
period
of
the
equipment
is
1
year.
During
the
warranty
period,
the
damage caused by non-
human factor, HEKEDA will be responsible for the
free
repair or replacement. Damages
caused by other factors or after the
warranty
period, HEKEDA will
continue to provide services with reasonable price
to the
customer.
F
、应急响应时间
Emergency Respond
Time
乙方在接
到甲方通知后,
2
个工作小时内给予明确答复,
24
个工作小时
赶到现场。
After
receiving
the
notice
from
the
customer,
HEKEDA
will
respond
to
the
customer within 2 hours.
HEK
EDA?s service engineer will arrive
the
site within 24
hours
2
、生产线的设计使用寿命≥
p>
12
年。
Life time of Designed Machine
≥12
years
售后服务
After sale
service
a
、本装置(
RO
反渗透膜及其它另有规定的除外)质保期为现场安装结束后
12
个月。质保
期内凡因买方原因造成本装置
出力不够、
水质不合格及其它与本技术规范约定不相符合的情
况
,卖方负责免费处理或更换相应的设备或部件;
Guarantee period of the machine is 12
months (exclude: RO reverse osmosis membrane
and mentioned) after finished the
installation.
if unusual
phenomenon occurs like water disqualification and
other technology are not
according with
the agreement
,
supplier will
be responsible for the free repair or
replacement.
b
、在质
保期内,在正常使用、维护保养的情况下,主要设备部件出现两次以上故障,买方
有权要
求退货;所产生的相关的一切费用由卖方承担;
Under
the normal operation and maintenance condition, if
the main parts occur two times
stoppage, the buyer should has right to
return goods and related costs from
supplier.
c.
我公司对所
提供的设备负责终身维护,对保修期外的服务可协议收取配件成本费及服务
费;
Supplier has responsible for
maintenance the machine lifetime, after the
warranty period,
supplier continues
to offer the technical service, but
replacing
the
spare parts,
supplier
only charge for material and
service fee.
a.
我公司将每六个月一次对客户进行一次回访,
了解并处理工程运行过程中出现的各种问<
/p>
题;
Supplier will
be every three months to check the machine whether
is running good or not.
b.
对
用户在日常使用过程中出现的设备质量投诉做出快速反应,最迟不得超过
24
小时到
达现场予以解决。
After receiving the notice from the
buyer, supplier will respond to the customer
within 24
hours on the spot to solve
the problems.
一、
Quotation of
Validity
:
30 days
报价的有效期:
30
天
二、
Time of
Finished
:
15
weeks
交货期:
15
weeks
三、
< br>Delivery
、
Installation
、
Training
、
Maintenance
:交货,安装,培训,维
护
A
、
Delivery:
交货
Our fact
ory is
in
charge
of transport
from
Shenzhen
to Xiamen’s factory.
Customer need to prepare the Lift
hoisting for l
oading and
unl
oading;
我们公司负责从深圳到厦门工厂的运输
费,客户需自提装卸货费用。
B
、
Installation:
安装
After
inspected
the
running
of
equipment
at
our
factory.
Then
will
be
finished
the
installation
and
commission
at
customer’s
factory,
provid
e
d
etails of instruction book.
装置在我司验收结束后将会完成安装并提供安装说明书。
C
、
Training:
培训
Training
course
to
operator
and
maintainer,
including
normal
operating,
maintenance, troubl
e
shooting and so on.
培训针针对操作和维护人员包括正常操作,
维护,故障解决等等。
D
、
Time of
Guarantee: One year (Heater is six month)
保修期:一年
(加
热器六个月)
However,
man-mad
e
and
the
damage
caused
by
natural
disasters
not
within the warranty.
人为损害和自然灾害不在保修范围内。
I.
Warranty and
Service
保修服务
A warranty of 24 months on “Insert
Supplier Name” fabricated equipment
components is included with the
purchase of the equipment. Purchased
components will be warranted per the
manufacturer’s warranty. The warranty
period starts after successful
start-
up in the Purchaser’s plant and
after final
acceptance has
been signed off.
“
插入供应商名称
“
制造的设备组件包含购买的设备,保修期为
24
个月。购买的
组件将通过制造商的质量保证审核。
质保期从设备使用,
以及在买方的工厂验收
完成
后签字确认后开始算起。
If equipment
breakdown occurs during weekdays (Monday to
Saturday) which
would result in the
loss of production, and the equipment manufacturer
is
notified by 3PM, service technician
from the manufacturer must arrive in
Federal-Mogul facility within 24 hours
from notification for analysis and repair.
The repair must take place
immediately after procurement of the necessary
spare parts.
Any
parts that will take more than two (2) days to
procure must be
included in recommended
spare parts list provided by the equipment
manufacturer.
如果设备在工作日(周一到周六
)发生故障,导致对生产造成损失,并且在下午
三点前已经通知设备制造商,制造商的服
务技术员必须在接到通知后
24
小时内
到达
Federal-Mogul
公司工厂进对设备行分析和维
修。
得到必要的备用零件后必
须马上进行维修。
超过两天后还没买到的任何零件必须包含在设备供应商的建议
备用清单里面。<
/p>
II.
Terms of
payment
付款条件
All
capital
expenditures
fall
under
the
responsibility
of
Global
Purchasing
who
will
negotiate
contract
terms
and
conditions
with
prospective vendors.
所有资金支出都
属于与潜在供应商协商合同条款和条件的全球采购员的
责任。
The
following
standard
payment
terms
are
mandatory
for
capital
equipment purchases
regardless of the value:
以下付款条件标准不管价格是多
少都由固定设备采购员强制执行:
?
N
o
up-front payment with
order
订单禁止预付款。
?
8
0%
payment upon shipment, with terms of net, 60 days
from the date
of invoice.
出货
时,从发票日起
60
天内以网上转账的方式支付
80%
的货款。
?
R
emaining 20% paid after
successful final run-off and confirmed
acceptance of the equipment at F-M
facility, with terms of net, 60
days
from the date of final acceptance.