关键词不能为空

当前您在: 主页 > 英语 >

wipe英语重难点

作者:高考题库网
来源:https://www.bjmy2z.cn/gaokao
2021-01-28 17:45
tags:

wipe-秘诀

2021年1月28日发(作者:许多孩子)


B3.


Precision engine bearing inserts are manufactured with a small portion of the bearing ends


extending


beyond


the


bearing


housing


or


caps.



The


installation


process


of


these


bearings


requires sufficient ______.



A. overlap







B. crush







C. lap or lead







D. protrusion


A4.


The ability of a fuel particle to travel into the combustion chamber before burning is called


_____.



A. penetration






B. permanence






C. turbulence







D. atomization


47



Electric insulation is made of organic substances and so gradually ___ with age




A



deteriorates




B



increases





C



are fouled




D



becomes better


DA main bearing consists of two shells which are secured by means of studs and______


A. tie rods










B. through bolts





C. lead wires









D. bearing caps



D24. Waterside scale in a fire-tube boiler may cause ______.


A. increased heat transfer



















B. fireside erosion


C. high steam demand






















D. overheated tubes


A29. Which of the listed conditions can lead to cavitation in a centrifugal pump?


A. Vapor pockets formed in the suction flow stream


B. Rough casing volute surfaces


C. Worn wearing rings


D. Heavy fluid in the flow stream


58B. The ground terminal of a starter should be connected to ________.





A. the common ground point















B. the starter



s frame






C. the communicator





















D. the starter



s mounting bolts


A61.


In


an


alternating


current


electrical


system,


a


low


system


power


factor


is


a


direct


sign


of


_____





A. wasted energy






















B. efficient operation


C. a short in the exciter field windings




D. an excessive number of minor system grounds


D76.


In


the


Oil


Record


Book,


a


comprehensive


list


of


operational


items


are


grouped


into


operational sections Each section is codified by a/an ________







A. number





































B. abbreviation







C. letter
































D.


number, abbreviation and letter



B77. Under MARPOL Code the ship to which it applies has to carry_______.







A. an International Ship Security Certificate







B. an International Oil Pollution Prevention Certificate







C. a Safety Management Certificate







D. an International Ballast Water Management Certificate


C78. Which one is not the



clear grounds



for a more detailed inspection?








A. the master and the chief engineer are unable to communicate effectively








B. serious corrosion on the hull








C. damaged sanitary pump








D. one page missing in the oil record book


A79.




Insufficiency of manning or insufficiency of certification of seafarers



is an identification


of a ________









A. substandard ship







B. standard ship





C. over-standard ship




D. reference ship


B80. STCW 78/95 Convention shall apply to seafarers _____ on board seagoing ship entitled to


fly the flag of a Party.








A. served








B. serving








C. surveyed









D. surveying



D81. The officer in charge of the engineering _______ the watch to the relieving officer if there is


reason to believe that the latter is obviously not capable of carrying out the watch-keeping duties


effectively.





A. shall take over






B. shall not take over





C. shall band over




D. shall not hand over




A82. When the order given by bridge may have bad results, the duty engineer should_____







A. inform the captain for a further consideration







B. inform the captain, and not perform it







C. stop the M/E immediately, and then inform the chief engineer








D. stop the M/E immediately, and then inform the captain


D83. The scuppers should be plugged _____.


A. only if fixed containment is not used





B. only if portable containment is not used



C. only if fixed containment drains are open




D. whenever the vessel is being bunkered



A84.


If


it


becomes


necessary


to


pump


bilges


while


a


vessel


is


in


port,


which


of


the


following


procedures should be followed?







A. Pump only if the discharge is led to a shore tank or barge







B. Pump only during the hours of darkness








C. Pump only on the outgoing tide








D. Pump only as much as is necessary



A85. The SOLAS convention prescribes that in the fire fighting drill the duty engineer should start


the fire pump and supply deck water in _______ minute(s)








A. 5









B. 3








C. 2










D. 1


D86. According to the ISM CODE, the < /p>



person



in the phrase



to designate a person or persons


ashore having direct access to the highest level of management



refers to ________.







A. the manager of the shipping company





B. the master of the ship







C. the designated person on board shop






D. the designated person ashore



B87. In order to strengthen maritime security and prevent and suppress acts of terrorism against


shipping,


a


new,


comprehensive


security


regime


for


international


shipping


was


set


to


enter


into


force in July 2004. The new regime is ________.







A. ISM Code










B. ISPS Code








C. FSS Code







D. IBCC Code



A88. In the voyage, when carrying out abandon ship drill, ________ should be test every time.







A. the emergency lighting system for muster and abandon ship








B. air/oil emergency shut-down








C. M.E. emergency operation







D. main/auxiliary steering gear changing



Scavenge


port


inspection


provides


useful


information


about


the


condition


of


cylinders,


pistons,


and rings, at low expense. The inspection consists of visually examining the piston, the rings and


the lower part of the cylinder liner, directly through the scavenge air ports To reduce the risk of


scavenge box fire, remove any oil sludge and carbon deposits in the scavenge air box and receiver


in connection with the inspection.


The port inspection should be carried out at the first stop after a long voyage, e.g. by anchoring if


possible, to obtain the most reliable result with regard to the effectiveness and sufficiency of the


cylinder lubrication and the combustion cycle (complete or incomplete)


A misleading result


may be obtained if the port


inspection is carried out after arrival at harbor,


since


manoeuvring


to


the


quay


and


low-load


running,


e.g.


river


or


canal


passage,


requires


increased


cylinder


oil


dosage,


i.e.


the


cylinders


are


excessively


lubricated,


Further,


during


low


load, the combustion ccle might not be as effective and complete as expected, due to the actual


fuel


oil


qualities


and


service


(running)


condition


of


the


fuel


injection


equipment.


It


is


highly


recommended to take this information into consideration.


89. The components of an engine involved in normal scavenge port inspection comprise _______.



the piston







piston rings







the lower part of the cylinder liner





the fuel injector







A.


①②











B.


①②③④








C.


②③










D.


①②③



90. If the scavenge box had too much oil sludge and carbon deposits, what would occur?







A. excessive cylinder oil consumption






B. the scavenge box fire







C. the crankcase explosion















D. excessive wear of the cylinder liner


91. In order to obtain the most reliable result with regard to the effectiveness and sufficiency of


the cylinder lubrication and the combustion cycle, when should the scavenge port inspection be


carried out?







A. at the first stop after a long voyage, e.g. by anchoring if possible








B. at the first stop after arrival at harbor







C. at the first stop after low load running








D. at the first stop after passing river or canal passage


92. Under


what


condition


that


the


scavenge


pot


inspection


can


gain a


misleading


result?



after


passed


through


Panama


Canal



after


got


alongside


shanghai


quay



after


arrival


shanghai


roadstead (


外锚地


)







A.


②③








B.


①②











C.


①②③












D




第二组



Current regulations with respect to the discharge of oily water set limits of concentration 15 parts


per million. A monitor is required to measure these values and provide both continuous records


and an alarm where the permitted level is exceeded.


The principle used is that of ultra-violet fluorescence. This is the emission of light by a molecule


that has absorbed light. During the short interval between absorption and emission, energy is lost


and


light


of


a


longer


wavelength


is


emitted.


Oil


fluoresces


more


readily


than


water


and


this


provides the means for its detection.


A


sample


is


drawn


off


from


the


overboard


discharge


and


passes


through


a


sample


cell.


An


ultra-violet light is directed at the sample and the fluorescence is monitored by a photoelectric cell


Where an excessive level of contamination is detected an alarm is sounded and diverting valves


are operated. The discharging liquid is then passed to a slop tank.


93. The passage is mainly about ________.







A. oily water separator














B. current regulations related to oil pollution







C. oil in water monitor














D. the principle of ultra-violet fluorescence


94. A monitor can obtain all of the following functions except _______.







A. measuring oil content values








B. providing continuous records







C. lowering the oil content below 15 ppm







D. providing an alarm unit warning of levels of discharge in excess of 15 ppm

wipe-秘诀


wipe-秘诀


wipe-秘诀


wipe-秘诀


wipe-秘诀


wipe-秘诀


wipe-秘诀


wipe-秘诀



本文更新与2021-01-28 17:45,由作者提供,不代表本网站立场,转载请注明出处:https://www.bjmy2z.cn/gaokao/580925.html

英语重难点的相关文章