had-过河
Drilling-COSL
钻井事业部“三基”工作手册
钻井常用英汉对照表
打捞工具和常用词语
spear
side wall core
casing
scraper
mill
die stamp
pin tap
box tap
packer
opener
junck sub
fishing over shot
cutter
blades
pony D.C
pup joint
slick M.D.C
fishing neck
perforate
no accident
HRS on swivel
below jar W.T
HRS on jar
seal assembly
total mud cost
centrifugal pump
brine
sub sea camera
core barrel
travelly block
Draw works
port
annular prevent
打捞矛
井壁取芯
套管清刮器
磨鞋
铅印
公锥
母锥
封隔器
扩眼器
打捞杯
打捞筒
割刀
刀臂
短钻鋌
短钻杆
光滑防磁钻鋌
打捞短节
射孔
无事故
水龙头时间
震击器以下重量
震击器时间
密封总成
泥浆总消耗量
灌注泵
饱和盐
水下电视
岩芯筒
游车
钻井绞车
左舷
万能防喷器
back
pressure
drill out cement
explosive
squeeze cement
fast line spooler
shallow
gas
panels
bridge plug
回压
钻水泥塞
炸药
挤水泥
快绳排绳器
浅层气
面板
桥塞
well
kick
and
50BBLs
pits
井涌增量
50
桶
gain
kelly
guard
blow out
guideline
guide rail
pick up weight
sluck off weight
rotating
weight
max torque
rotating
HRS
total BHA length
check
crown o matic
total BHA weight
方钻杆保护接
头
井喷
导向绳
导轨
上提重量
下放重量
总重量
最大扭矩
纯钻井时间
总
BHA
长度
检查防碰天车
总
BHA
重量
held
safety
meeting
on
rig
钻台举行安全
floor
会
wear bushing
bridge crane of the BOP
liner
Wash pipe packing
sand traps
compensator
crown block
stabilizer
starboard
choke/kill line
抗磨补芯
BOP
叉车
尾管
冲管盘根
沉沙池
补偿器
天车
扶正器
右舷
阻流和压井管
线
第
1
页
共
6
页
Drilling-COSL
钻井事业部“三基”工作手册
钻井常用英汉对照表
shear ram
trip tank
plug back
nozzle
boost line
marine swivel
prepare
break CIRC
degasser
desander
shale shaker
gas cut mud
open hole
tubing
testing
plugged bit
well off set
recover survey
rig heading
wind speed
roll
visible
剪切闸板
计量罐
打水泥塞
水眼
加速管线
水下水龙头
准备
短时循环
除气器
除沙器
震动筛
气侵泥浆
裸眼
油管
测试
泥包钻头
井口位移
回收测斜仪
平台首向后
风速
横摇
能见度
choke manifold
gas peak
dart sub
jetter
core point
trip gas
after effect
mud cleaner
desilter
prior/before
helicopter
special tool
No.4 guide line brocken
fix
caving
D.c twist off
tugger
pitch
sweel
wave
heave
dir
阻流管汇
气测值
投入式止回阀
喷射冲洗器
取芯点
后效气
后效
泥浆清洁器
除泥器
在
——
之前
直升飞机
特殊工具
四号导向绳断
掉
修理
垮塌
钻鋌折断
气动绞车
纵摇
涌
浪
升沉
方位
钻井常用短语
Last
anchor on rack at 0600HR
Start of contract at 1530HR
End of contract at 0300HR
Rig on tow
Rig
arrived well location at 1000HR
Run anchors and first anchor on bottom
at 1100HR
Ballast rig to
70ft draft
deballast
rig
六点最后一个锚上架
下午三点半合同开始
早上三点合同结束
平台拖航
早上十点到达井位
抛锚。第一个锚<
/p>
11
点到底
压
载到
70
英尺
平台卸载
adjust well
location with pull No .1 and No.2 anchors
< br>拉
1
和
2
号锚调整井位
gain
anchor tension test No.3 and
No4-ok
wait slack
tide
replace upper felly
cock
1
和
2
号锚张力试验
-OK
等待平潮
替换方钻杆上阀
第
2
页
共
6
页
Drilling-COSL
钻井事业部“三基”工作手册
钻井常用英汉对照表
spuded time
arrived time
开钻时间
到达井位时间
drill 36
p>
钻
36
井眼从
12
0
米至
200
米
,
每接
each connection and ream
each connection once
一拄前滑眼一次
并泵入
50
桶泥浆
open 17-1/2
leak
off test at 1.2SG leak off @625psi
ream hole from 450m to 500m
core drill from 1300m to
1320m
collect/remove core
and service core equipment
sweep hole with 100bbl HI-VIS
mud
slug the hole with
viscous mud
pump 6000stks
HI-VIS mud
circulate and
working on pipe
circulate
and wash from 100m to 200m
circulate bottom up
circulate for sample
flow check at 2300m due to drilling
break
circulate for flow
check
circulate
and condition mud
reverse
circulate
pooh no rotary and
no drag
run in
W/26
RIH to wipe
trip
RIH to tag top of
cement at 1000m
short trip
over pull 50klbs
make up new
bottom hole assy
drop survey
pump slug and POOH
retrieve/return survey
inside BOP drill at casing
shoe
用
17-1/2
钻头扩眼从
250
米至
5
00
米
破裂试验
.
井深
500
米、泥浆比重
1.2SG.
泄漏压力为
625PSI
倒划眼从
450
米
至
500
米
取芯钻进从
1300
米至
1320
p>
米
收集
/
甩下岩芯并包装处理
用
100
桶高粘泥浆清洗井
泵送一段稠泥浆进井
泵
6000
冲高沾泥浆
循环并活动钻杆
循环清洗
100
米至
200
井段<
/p>
循环井底出来
循环取样
流量观察因钻至
2300
米时突变
循环观察
循环处理泥浆
反循环
起钻不用转盆也不拖挂
下
26
领眼钻头和
36
扩眼
器至
117
米探海底泥面
下钻通井
下钻探水能面在
1000
米处
短起过提
50
千磅
组合新的下部钻具
投测打重泥浆
p>
.
起钻
回收测斜仪
在套管鞋进行防喷演习
POOH
circ
&
fill
annular
W/.P
no
good.
起钻灌浆不正常
,
怀疑是泥浆问题
.
Suspect mud
problems. W/pull out every 5 Stands&fill
每起五柱灌浆
-
正常
a time ok
POOH
due to change bit
POOH due
to plan change
POOH for
changing bottom hole assy
POOH wet pipe and no slug
POOH no rotary
第
3
页
共
6
页
因要换钻头所以起钻
计划改变起钻
起钻更换下部钻具组合
起钻喷泥浆因没打重泥浆
起钻不转转盆
POOH due
to lost pump pressure suspect washout
D.C
泵压下降起钻
,
怀疑钻鋌刺漏
had-过河
had-过河
had-过河
had-过河
had-过河
had-过河
had-过河
had-过河
-
上一篇:常用工具英语
下一篇:金康合同中英文对照(整理打印版)