关键词不能为空

当前您在: 主页 > 英语 >

困难群众(完整版)土木工程毕业论文外文翻译339361

作者:高考题库网
来源:https://www.bjmy2z.cn/gaokao
2021-01-28 00:54
tags:

困难群众-飘浮

2021年1月28日发(作者:巴拉迪)





































































07


级< /p>






03















指导教


















职称




























毕业论文成绩













































Building construction concrete crack of


prevention and processing


Abstract


The


crack


problem


of


concrete


is


a


widespread


existence


but


again


difficult in solve of engineering actual problem, this text carried on a study


analysis to a little bit familiar crack problem in the concrete engineering,


and


aim


at


concrete


the


circumstance


put


forward


some


prevention,


processing measure.



Keyword:Concrete crack prevention processing


Foreword




Concrete's ising 1 kind is anticipate by the freestone bone, cement, water


and


other


mixture


but


formation


of


the


in


addition


material


of


quality


brittleness


not


and


all


e


the


concrete


construction


transform


with


oneself,


control


etc.


a


series


problem,



model


of


in


the


concrete existence numerous tiny



and a little bit other use function not a


creation


to



after


the


concrete


be


subjected


to


lotus


carry,


difference


in


temperature


etc.


function,


tiny


crack


would


continuously


of



expand


with


connect,


end


formation


we


can


see


without


the


aid


of


instruments


of


macro


view


the


crack


be


also


the


crack


that


the


concrete


often say in the engineering.




Concrete


building


and


Gou


piece


usually


all


take


sewer


to


make


of,


because of crack of existence and development usually make inner part of


reinforcing


bar


etc.


material


creation


decay,


lower


reinforced


concrete


material


of


loading


ability,


durable


and


anti-


Shen


ability,


influence


building


of


external


appearance,


service


life,


severity


will


threat


arrive


people's


life


and


property


safety.A


lot


of


all


of


crash


of


engineerings


is


because


of


the


unsteady


development


of


the


crack


with


the


result



age


science


research


with


a


great


deal


of


of


the


concrete


engineering practice certificate, in the concrete engineering crack problem


is ineluctable, also acceptable in certainly of the scope just need to adopt


valid


of


measure


will


it


endanger


degree


control


at


certain


of


scope



reinforced


concrete


norm


is


also


explicit


provision:Some


structure


at


place


of


dissimilarity


under


the


condition


allow


existence


certain


the


crack


of



at


under


construction


should


as


far


as


possible adopt a valid measure control crack creation, make the structure


don't appear crack possibly or as far as possible decrease crack of amount


and width, particularly want to as far as possible avoid



of the reason be a


lot


of


and


,


the


asymmetry


sink


to


sink


etc.


reason


cause


of


crack;Have


outside carry the crack that the function cause;Protected environment not


appropriate the crack etc. caused with chemical differentiation


to


treat


in


the


actual


engineering,


work°


out


a


problem


according


to


the


actual circumstance.





In the concrete engineering the familiar crack and the prevention




Suo crack and prevention




Stem the Suo crack much appear after the concrete protect be over of a


period of time or concrete sprinkle to build to complete behind of around a



the


cement


syrup



stem


Suo,


and


this


kind


of


constringency


is


can't



Suo


crack


of


the


creation


be


main


is


because


of


concrete


inside


outside



of


influence,


surface



more


big


pull


should


dint


but


creation



relative


.Stem


the


Suo


crack


is


much


surface


parallel


lines


form


or


the


net


shallow


thin


crack,


width


many


between


0.05-0.2


mm,


the


flat


surface


part


much


see


in


the


big


physical


volume


concrete and follow it more in thinner beam plank short to


Suo crack usually the anti- Shen of influence concrete, cause the durable of


the rust eclipse influence concrete of reinforcing bar, under the function of


the


water


pressure


dint


would


creation


the


water


power


split


crack


influence concrete of loading dint etc..Concrete stem the Suo be main with


water ash of the concrete


ratio,


the dosage of the composition, cement of


cement, gather to anticipate of the dosage of the property and dosage, in


addition etc. relevant.




Main


prevention


measure:While


being


to


choose


to


use


the


constringency


quantity


smaller


cement,


general


low



the


adoption,


lower


the


dosage


of



is


a


concrete


of


stem


the


Suo


be


subjected


to


water ash ratio of influence more big, water ash ratio more big, stem Suo


more


big,


so


in


the


concrete


match


the


ratio


the


design


should


as


far


as


possible control good water ash ratio of choose to use, the Chan add in the


meantime accommodation of reduce is strict control concrete



mix


blend


with


under


construction


of


match


ratio,


use


of


concrete


water


quantity


absolute


can't


big


in


match


ratio


design


give


settle


of


use


water



is


the


earlier


period


which


strengthen


concrete


to


protect,


and


appropriate


extension


protect


of


concrete



construction


want to be appropriate extension concrete



to overlay time, and Tu2 Shua


protect


to



is


a


constitution


the


accommodation


is


in


the


concrete structure of the constringency sew.




Su constringency crack and prevention




Su constringency is the concrete is


before condense, surface because of


lose


water


quicker


but


creation


of



Su


constringency


crack is general at dry



the center breadth, both ends be in the centerthin


and


the


length


be


different,


with


each


other


not


coherent


r


crack


general


long


20-30


cm,


the


longer


crack


can


reach


to


a


2-3


m,


breadth


1-5



creation


of


main


reason


is:The


concrete


is


eventually


almost



in


the


capillary


creation


bigger


negative


press


but make a


concrete physical volume sharply


constringency, but at


this


time


the


strength


of


concrete


again


can't


resist


its


constringency,


therefore


creation



influence


concrete


Su


constringency


open


the main factor of crack to



prevention measure:One is choose to use stem


the Suo value smaller



the Huo sour brine is strict the control


water ash ratio, the Chan add to efficiently reduce water to increment the


collapse of concrete fall a degree and with easy, decrease cement and water


of



is


to


sprinkle


before


building


concrete,


water


basic


level


and template even to soak is in time to overlay the perhaps


damp


grass


mat


of


the


plastics


thin


film,



protect


in


the


concrete



is in the



and block breeze facilities, protect in time.




to sink crack and prevention




The


creation


which


sink


to


sink


crack


is


because


of


the


structure


foundation


soil


quality


not


and


evenly,


loose


soft


or


return


to


fill


soil


dishonest or soak in water but result in the asymmetry sink to decline with


the


result


that;Perhaps


because


of


template


just


degree


shortage,


the


template propped up to once be apart from


big


or prop up bottom loose


move etc. to cause, especially at winter, the template prop up at jelly soil up,


jelly the soil turn jelly empress creation asymmetry to sink to decline and


cause concrete structure creation kind crack many is deep enter


or


pierce


through


sex


crack,


it


alignment



development,


bigger


sink


to


sink


crack,


usually



of


wrong,


crack


width


usually


with


sink


to


decline


quantity


direct


proportion



width


under


the


influence


of


temperature variety foundation after transform stability sink


to sink crack also basic tend in stability.




Main


prevention


measure:One


is


rightness


loose


soft


soil,


return


to


fill


soil


foundation


a


construction


at


the


upper


part


structure


front


should


carry


on


necessity


of


Hang


solid


with



is


the


strength


that


assurance template is enough and just degree, and prop up firm, and make


the


foundation


be


subjected


to


dint



is


keep


concrete


from


sprinkle


infusing


the


foundation


in


the


process


is


soak


by



is


time that template tore down to can't be too early, and want to notice to


dismantle a mold order of is at jelly soil top take to establish


template to notice to adopt certain of prevention measure.




ature crack and prevention





Temperature crack much the occurrence is in big surface or difference


in temperature variety of the physical volume concrete compare the earth


area of the concrete te after sprinkling to build, in the



a


creation a great deal of of water turn



the



kgm 3, each sign square the


rice concrete will release a calories of



kJ and make concrete internal thus


the


temperature


rise


to


reach


to


70




or


so


even




inside


outside


of


bigger


difference


in


temperature,


the


bigger


difference


in


temperature


result


in


inner


part


and


exterior



certain


of


pull


should



pull


should


dint


exceed


the


anti-


of


concrete


pull


strength


extreme


limit,


concrete


surface


meeting


creation


crack,


this


kind


of


crack


much


occurrence after the concrete under construction the concrete of


under construction be difference in temperature variety more big, perhaps


is a concrete to be subjected to assault of cold wave etc., will cause concrete


surface


the


temperature


sharply


descend,


but


creation


constringency,


surface constringency of the concrete be subjected to inner part concrete of


control, creation very big of pull should dint but creation crack, this kind


of


crack


usually


just


in


more


shallow


scope


of


the


concrete


surface


creation.




The alignment of the temperature crack usually none settle regulation,


big


area


structure


the


crack


often


maneuver


interleave;The


size


bigger


structure of the beam plank length, the crack run parallel with short side


more;Thorough with pierce through sex of temperature crack general and


short side direction parallelism or close parallelism, crack along long side


cent the segment appear, in the center more width the size


be different, be subjected to temperature variety influence more obvious,



winter compare breadth, summer more concrete temperature


crack that the



cause is usually in the center the thick both ends be thin,


but cold Suo crack of thick thin variety not too emergence of


the


this


kind


crack


will


cause


the


rust


eclipse


of


reinforcing


bar,


the


carbonization of concrete, the anti- jelly which lower concrete


melt,


anti-


tired and anti- Shen ability etc..




Main


prevention


measure:One


is


as


far


as


possible


choose


to


use


low



the 450 kgm 3 is to lower water ash ratio, water ash of the


general


concrete


ratio


control


below



is


improvement


the


bone


anticipate class to go together with, the Chan add powder ash from stove


or efficiently reduce water etc. to come to reduce cement dosage and lower


water


to


turn



improvement


concrete


of


mix


blend


to


process


a


craft,


lower sprinkle of concrete to build is the in addition that


the Chan add a



in the concrete, improvement the concrete mix to match a


thing of mobility, protect water, lower water to turn



is the



sprinkle to


build can the adoption take to establish to



plank etc. assistance measure


control concrete of Wen Sheng, lower to sprinkle temperature of build the



is


the


temperature


of


big


physical


volume


concrete


should


the


dint


relate


to


structure


size,


concrete


structure


size


more


big,


temperature


should


dint


more


big,


so


want


reasonable


arrangement


construction


work


preface,


layering,


cent


the


piece


sprinkle


to


build,


for


the


convenience


of


in


spread



of


the


physical


volume


concrete


cool


off


piping,


cold


water


perhaps


cold


air


cool


off,


let


up


concrete


of


inside


outside difference in is the supervision which strengthen


concrete temperature, adopt to cool off in time, protection measure.11 is to



reserve temperature constringency to sew.12 is to let up to control, sprinkle


proper before building concrete in the Ji rock and old concrete top build a


5 mm or so sand mat a layer or usage asphalt etc. material Tu2 Shua.13 is


to


strengthen


concrete


to


protect,


the


concrete


after


sprinkle


build


use


moist grass Lian in time,



sprinkle water to protect, appropriate extension


protect time, assurance the concrete surface be slow- moving cool the


cold


season,


concrete


surface


should


constitution



measure,


in


order


to


prevent


cold


wave


assault.14


is


the


allocation


be


a


little


amount


in


the


concrete


of


reinforcing


bar


perhaps


add


fiber


material


concrete


of


temperature crack control at certain of scope inside.


and prevention that the chemical reaction cause




Alkali bone's anticipating the crack that reaction crack and reinforcing


bar


rust


eclipse


cause


is


the


most


familiar


in


the


reinforced


concrete


structure of because of chemical reaction but cause of crack.




The


concrete


blend


a


future


reunion


creation


some


alkalescence


ion,


these ion with some activity the bone anticipate creation chemical reaction


and absorb surroundings environment in of water but the physical volume


enlarge,


make


concrete


crisp


loose,


inflation


open



this


kind


of


crack


general


emergence


concrete


structure


usage


period,


once


appear


very difficult remediable, so should at under construction adopt valid the


measure carry on of prevention measure:While being to


choose to anticipate with the alkali activity small freestone is the


in


addition


which


choose


to


use


low


lye


mire


with


low


alkali


or



which


choose to use accommodation with anticipate to repress an alkali bone to


anticipate reaction.





Because


the


concrete


sprinkle


to


build,


flap


Dao


bad


perhaps


is


a


reinforcing bar protection layer thinner, the



rust eclipse, the reinforcing


bar physical volume of the rust eclipse inflation, cause concrete bulge crack,


the crack of this kind type much is a crack lengthways, follow the position


of reinforcing bar y of prevent measure from



the thickness


of the is a concrete class to go together with to want


is


a


concrete


to


sprinkle


to


note


and


flap


Dao


airtight



is


a


reinforcing bar surface layer Tu2 Shua antisepsis coating.


Crack processing




The emergence of the crack not only would influence structure of whole


with


just


degree,


return


will


cause


the


rust


eclipse


of


reinforcing


bar,


acceleration concrete of carbonization, lower durable and anti- of concrete


tired, anti- Shen ore according to the property of crack and


concrete circumstance we want differentiation to treat, in time processing,


with assurance building of safety usage.




The repair measure of the concrete crack is main to



sew method, the


structure


reinforce


a


method,


concrete


displacement


method,


electricity


chemistry protection method and imitate to living from



be applicable to


stability and to structure loading the ability don't



crack daubery cement


syrup, the wreath oxygen gum mire or at concrete surface Tu2 Shua paint,


asphalt


etc.


antisepsis


material,


at


protection


of


in


the


meantime


for


keeping concrete from continue under the influence of various function to


open


crack,


usually


can


adoption


the


surface


in


crack


glue


to


stick


glass


fiber cloth etc. measure.




1, infuse syrup, the Qian sew method

困难群众-飘浮


困难群众-飘浮


困难群众-飘浮


困难群众-飘浮


困难群众-飘浮


困难群众-飘浮


困难群众-飘浮


困难群众-飘浮



本文更新与2021-01-28 00:54,由作者提供,不代表本网站立场,转载请注明出处:https://www.bjmy2z.cn/gaokao/575714.html

(完整版)土木工程毕业论文外文翻译339361的相关文章

  • 爱心与尊严的高中作文题库

    1.关于爱心和尊严的作文八百字 我们不必怀疑富翁的捐助,毕竟普施爱心,善莫大焉,它是一 种美;我们也不必指责苛求受捐者的冷漠的拒绝,因为人总是有尊 严的,这也是一种美。

    小学作文
  • 爱心与尊严高中作文题库

    1.关于爱心和尊严的作文八百字 我们不必怀疑富翁的捐助,毕竟普施爱心,善莫大焉,它是一 种美;我们也不必指责苛求受捐者的冷漠的拒绝,因为人总是有尊 严的,这也是一种美。

    小学作文
  • 爱心与尊重的作文题库

    1.作文关爱与尊重议论文 如果说没有爱就没有教育的话,那么离开了尊重同样也谈不上教育。 因为每一位孩子都渴望得到他人的尊重,尤其是教师的尊重。可是在现实生活中,不时会有

    小学作文
  • 爱心责任100字作文题库

    1.有关爱心,坚持,责任的作文题库各三个 一则150字左右 (要事例) “胜不骄,败不馁”这句话我常听外婆说起。 这句名言的意思是说胜利了抄不骄傲,失败了不气馁。我真正体会到它

    小学作文
  • 爱心责任心的作文题库

    1.有关爱心,坚持,责任的作文题库各三个 一则150字左右 (要事例) “胜不骄,败不馁”这句话我常听外婆说起。 这句名言的意思是说胜利了抄不骄傲,失败了不气馁。我真正体会到它

    小学作文
  • 爱心责任作文题库

    1.有关爱心,坚持,责任的作文题库各三个 一则150字左右 (要事例) “胜不骄,败不馁”这句话我常听外婆说起。 这句名言的意思是说胜利了抄不骄傲,失败了不气馁。我真正体会到它

    小学作文