Universal


DPL


WuHu


Industrial


Co.,Ltd


Come into Effect


2006.02.20



Status


Unqualified products control


Version


program



Code


A/5


QMP-08-05



1.0




Purpose


Regarding the company in all certified products and suspicious product


marking, the record, the isolation and processing carry on the


control, prevented the defective works and the suspicious product non-


anticipated use and flows out


2.0




Scope


It’s


suitable


for


purchasing


the


defective


works


control


after


this


company


which


is


in


the


production process defective works, may the product and leaves the plant occurs.


3.0




Responsibility


3.1




After the quality control department is responsible to purchase the original helping material the


defective


works,


in


the


production


process


the


defective


works


and


leaves


the


plant


the


defective works


control and processing


3.2



The engineering dept is responsible for in the new product test the defective works control and


processing


3.3




The purchase department is responsible for supplier all defective works processing


4.0



Method


4.1 The supplier expects not qualified processes



4.1.1


Plans


the


storekeeper


by


the


enterprise


first


to


check


the


commodity


name,


the


quantity,


the


specification, the model if are unqualified, records


on, the unqualified


item


makes


corresponding processing, and



stock Will


go into


storage List


4.1.2 When the supplier expects IQC examines according to


Book


is


unqualified,


the


result


recording


in



Examination


Data


sheet


on,


and


submits the purchase department and the enterprise delimits, and glues on red in the goods not


qualified marks, puts in the isolated plot by the storekeeper to carry on the isolation.


4.1.3


The


method


for


unqualified


product


IQC


in


after


the


feeding


examination


discovered


the


unqualified situation, records in


the


tube


department


manager


in



Examination


Data


sheet


to


fill


in


the


processing


opinion, by manages minister to authorize. The processing method includes:




a. Returns supplier b. The deviation uses c. The interior processes d. The total examines uses


4.1.4 After IQC will approve the note


(should


symbolize



will


transmit


for


the


purchase


department,


will


be


responsible by the purchase department in three effective working days to return the supplier,


and


will


send


out



to


the


supplier


Exceptionally


To


analyze


Report


the


request


supplier


basis


unqualified


phenomenon


will


make


the


reply,


the


tube


department


will


be


responsible


for



Exceptionally


Analyzes


Report


the


center


measure


track


Made by



Zhang XueBo


















































Date



2006 02.13


Approved by



He Xiaoping















































Date



2006 02.13


Issuing Dept



QA






















































Page




7



Total



9












































































Universal


DPL


WuHu


Industrial


Co.,Ltd


Come into Effect


2006.02.20



Status


Unqualified products control


Version


program



Code


A/5


QMP-08-05



confirmation.


4.1.5


If the production urgently needs or the company customer demand is urgent, proposed by the


purchase department


application, tube


department


basis unqualified condition


determination:


A.


The


deviation


uses


(refers


to



Special


permission


Processing


Work


Instruction


Book


must indicate flaw in the unqualified sample and enclosed


when necessity issues


department takes doing over/Repairs a second time, examines with the instruction, at the same


time


requests according to


second


time


and


examines


must


reexamine


with


the


qualified


after


product.


The


inspector


recording traces


the fence in



culls the defective works to have to fill in


on, reports the purchase department contact supplier to carry on sues for damages.


4.2



Process defective works processing






















































4.2.1 Produces the first examination not to be



unqualified, Fills in by the inspector


reorganize List


4.2.2 In the production process, the operator self-checks the unqualified product, does over directly by


the operator, cannot do over discards directly, and defective works quantity and phenomenon


recording in this location


4.2.3


Quality


control


department


IPQC


when


carries


on


inspects,


like


the


discovery


does


not


tally,


pastes by IPQC on this batch of products not qualified poster, and sends out


Good To do over Label


quantity


and


phenomenon


recording


in


this


location



Registration


form


on.


Like


this


location cannot carry on doing over, repair a second time (normal doing over, repairs a second


time),


issues



Processing


Written


notice


by


IPQC


to


hand


over


the


processing


department


to


take


doing


over/Repairs


a


second


time,


examines


with


the


instruction;


Meanwhile


requests


after



over


Work


Instruction


Book


to


carry


on


must


reexamine,


again examines the result recording


4


.


2.4IPQC when inspecting discovers not qualified according to 4.2.2



processing; When duplicates not qualified appears, should to the IPQC gang foreman reflect


that, at the same time sends out


notice


request, until conforms to the requirement to stop; Like cannot accept by is on duty the IPQC


gang foreman to report to the higher authority manager, and solicits the department person in


charge


suggestions,


the


IPQC


gang


foreman


acts


according


to


the


actual


situation,


the


form


requests


the


workshop


by



suspension


Written


notice


to


stop


producing


Made by



Zhang XueBo


















































Date



2006 02.13


Approved by



He Xiaoping















































Date



2006 02.13


Issuing Dept



QA






















































Page




7



Total



9











































































Universal


DPL


WuHu


Industrial


Co.,Ltd


Come into Effect


2006.02.20



Status


Unqualified products control


Version


program



Code


A/5


QMP-08-05



temporarily. Is on duty produces the gang foreman to be supposed to carry on the confirmation


to



suspension


Written


notice


and


to


the


unqualified


phenomenon


feedback


higher authority, carries on the reason analysis together, promptly adopts the measure solution.


IPQC


solution


measure


confirmation


which adopts


to


the workshop, when confirms


through


the extensive complex quantities pre-natal, needs the first examination,


at the same time the workshop personnel must carry on the correlation to inspect.


4.2.5 Even because of the mold, the craft question, the product somewhere does


not improve to, must the re- treatment conform to the requirement, issues


Written notice


confirmation,


and


arranges


the


inspector


to


paste


the


yellow



the


poster


in


the


commodity label corresponding processing working procedure examination fence. Doing over,


repairs a second time the after product to have to deliver examines. The processing department


culls the defective works, cannot the re-treatment have to fill in



4.2.6 The production on already the working procedure examination was qualified, But examines the


defective works in the under working procedure to have mutually to fill in


form


And


laying


aside


red


defective


works


box,


Latter


by


on


working


procedure


tube


confirmed again makes processing;


4.2.7 The production department smashing room recycles every day the


defective works must have



processing, when on the plastic like has other different materials, must the different material


eliminate, otherwise does


not


give discards directly. All powder


fragments in have not


been


under


the


customer


special


permission


in


the


situation


all


not


to


permit


to


use


arbitrarily


outside, should unify sells processing.


4.3




The disposal flow for outside inspection of NG


.


4.3.1



OQC


Examination


Data


sheet


by


OQC


in


End


on


to


indicate


the


unqualified


phenomenon, and fills in


department


OQC


manager


in



Inspection


Result


Written


notice


to


fill


in


the


processing


opinion, authorizes by the tube person in charge. The processing method includes:








a. Returns production workshop


b. The deviation


uses


c. The interior processes


d. The total


examines uses


4.3.2 Like the customer demand is urgent, plans or the banking department by the enterprise carries on


according to


4.3.3 Needs the re-process, OQC (end examines) goes into storage in the commodity label examines


in


the


fence


to


paste


the


character



OO/REJECTED



and


Finally


Inspection


Result


Written


notice



the


manifest


serial


number


to


fill


in


the


poster.


The


OQC


manager in returns goods on unqualified type to indicate the flaw spot, when necessity issues


Made by



Zhang XueBo


















































Date



2006 02.13


Approved by



He Xiaoping















































Date



2006 02.13


Issuing Dept



QA






















































Page




7



Total



9










































































-


-


-


-


-


-


-


-



本文更新与2021-02-28 10:52,由作者提供,不代表本网站立场,转载请注明出处:https://www.bjmy2z.cn/gaokao/680506.html

31Unqualified products control program的相关文章

  • 余华爱情经典语录,余华爱情句子

    余华的经典语录——余华《第七天》40、我不怕死,一点都不怕,只怕再也不能看见你——余华《第七天》4可是我再也没遇到一个像福贵这样令我难忘的人了,对自己的经历如此清楚,

    语文
  • 心情低落的图片压抑,心情低落的图片发朋友圈

    心情压抑的图片(心太累没人理解的说说带图片)1、有时候很想找个人倾诉一下,却又不知从何说起,最终是什么也不说,只想快点睡过去,告诉自己,明天就好了。有时候,突然会觉得

    语文
  • 经典古训100句图片大全,古训名言警句

    古代经典励志名言100句译:好的药物味苦但对治病有利;忠言劝诫的话听起来不顺耳却对人的行为有利。3良言一句三冬暖,恶语伤人六月寒。喷泉的高度不会超过它的源头;一个人的事

    语文
  • 关于青春奋斗的名人名言鲁迅,关于青年奋斗的名言鲁迅

    鲁迅名言名句大全励志1、世上本没有路,走的人多了自然便成了路。下面是我整理的鲁迅先生的名言名句大全,希望对你有所帮助!当生存时,还是将遭践踏,将遭删刈,直至于死亡而

    语文
  • 三国群英单机版手游礼包码,三国群英手机单机版攻略

    三国群英传7五神兽洞有什么用那是多一个武将技能。青龙飞升召唤出东方的守护兽,神兽之一的青龙。玄武怒流召唤出北方的守护兽,神兽之一的玄武。白虎傲啸召唤出西方的守护兽,

    语文
  • 不收费的情感挽回专家电话,情感挽回免费咨询

    免费的情感挽回机构(揭秘情感挽回机构骗局)1、牛牛(化名)向上海市公安局金山分局报案,称自己为了挽回与女友的感情,被一家名为“实花教育咨询”的情感咨询机构诈骗4万余元。

    语文