-
船舶物料及管理
1
、
______ is
true
.
b
A
.
ISSA stores are
numbered in six digits
B
.
IMPA stores are
numbered in six digits
C
.
IMPA stores are
numbered in seven digits
D
.
both ISSA and
IMPA stores are numbered in unique six digits
2
、
“
15
02
41
Semi Double Queen
195
332
mm
”
is a description of
______
.
b
A
.
ISSA stores
B
.
IMPA stores
C
.
common marine
stores
D
.
a
reference to be studied
3
、
p>
“
77.143.02
,
< br>A-
22
…
Cylinder<
/p>
,
full
”
is a description of ______
.
a
A
.
ISSA stores
B
.
IMPA stores
C
.
common marine
stores
D
.
a
reference to be studied
4
、
A
“
figure
eight
”
knot is used to
______
.
d
A
.
be a stopper
B
.
shorten a line
C
.
join lines of
equal size
D
.
keep
a line from passing through a sheave
5
、
A change of a
documented vessel
'
s name can
only be made by the ______
.
d
A
.
CCS
B
.
Commissioner of
Customs
C
.
Treasury
Department
D
.
MSA
6
、
A device used
to enlarge the size of an existing bore
hole
,
having teeth arranged
on
its outside circumference to cut the
formation as it rotates is a
(
n
)
______
.
c
A
.
Enlarger
bit
B
.
Casing bit
C
.
Hole opener
D
.
Casing opener
7
、
A double male
coupling is one that ______
.
c
A
.
Has left hand
twist
B
.
Has
inside threads on both ends
C
.
Has outside
threads on both ends
D
.
Takes two men
to operate
8
、
A
single heavy wire made up for the topping lift is
called a ______
.
a
A
.
Bale
B
.
Spanner wire
C
.
Bull line
D
.
Working guy
9
、
A small light
tackle with
blocks of steel
or wood that is
used for
miscellaneous
small jobs is called a
______
.
c
1
A
.
snatch block
B
.
threefold
purchase
C
.
handy-
billy
D
.
chockablock
10
、
A splice that
can be used in running
rigging
,
where the line will
pass through
blocks
,
is a
______
.
b
A
.
Short splice
B
.
Long splice
C
.
Back splice
D
.
Spindle splice
11
、
A stay is
______
.
a
A
.
Standing
rigging
B
.
A
downhaul
C
.
A
halyard
D
.
A jib
12
、
A stopper is
______
.
a
A
.
A short length
of line used for temporarily holding another line
B
.
A snatch block
for handling a topping lift
C
.
An engine order
telegraph
D
.
The
brake on a cargo winch
13
、
A tackle by
which the outer end of a boom is raised and
lowered is the topping
______
.
b
A
.
Boom
B
.
Lift
C
.
Raise
D
.
Tackle
14
、
A well in the
uppermost deck of a shelter deck vessel which has
only a temporary
means of closing for
the purpose of gaining an exemption from tonnage
measurement
is called a
(
n
)
______
.<
/p>
d
A
.
Exemption space
B
.
Tonnage deck
C
.
Cofferdam
D
.
Tonnage opening
15
、
A wobbling
tail shaft is an indication of
______
.
d
A
.
Shallow water
B
.
An engine that
is misfiring
C
.
A
tight tail shaft gland
D
.
Worn stern
bearing or misalignment
16
、
After an
engine is started you should
______
.
c
A
.
increase engine
speed to insure adequate flow of oil to all parts
of the engine
B
.
pay no
attention unless there are unusual noises from the
engine
C
.
check
operating pressures and
temperatures
,
and check for
leaks
D
.
run the
engine at idle until the temperature has increased
17
、
Before
starting to hoist
provisions
,
which should be
checked ________
.
d
2
-
-
-
-
-
-
-
-
-
上一篇:李世民英文简介
下一篇:世界名著及作者英文名表达