关键词不能为空

当前您在: 主页 > 英语 >

PMS功能说明

作者:高考题库网
来源:https://www.bjmy2z.cn/gaokao
2021-02-17 16:27
tags:

-

2021年2月17日发(作者:待就业)



1




Generator protection.


发电机保护



The generators are protected against the various faults by protection devices which


are located in their respective generator panels and on the generator’s ACB itself.




发电机的保护由相应发电机屏内保护设备与发电机主开关实现




1.1.



MICROLOGIC5.0A control module




MICROLOGIC5.0A


控制模块



This device which is located on the individual generator ACB provides


generator protection against the following:



该装置在发电机主开关上< /p>


,


为发电机提供以下保护


:


?



Over-current (Long Time)


过电流(长延时):



When the prevailing load current of the generator exceed 125% of the protection


device’s setting and maintain for a duration of 15


~30s, it will cause the respective


generator ACB to trip.

< p>
当发电机电流超过额定电流


150%


< p>
,


延时


15~30s


发电机主开关跳闸。



?



Short-circuit current (Short Time)


过电流



(


短延时


)


When short-circuit current exceed 2.5 times of the protection device setting and


maintain for duration of 40


0 msec, it will cause the respective generator’s ACB to


trip.










当发电机电流超过额定电流


250%



,


延时


400 ms,


发电机主开关跳闸。



?



Short circuit current (Instantaneous Trip)


短路电流


(


瞬时


)



When short-circuit current of the generator exceed 10 times of the protection device


setting, it will cause the respective generator ACB to trip immediately.












当发电机电流超过额定电流


10


倍时


,


发电机主开关瞬时跳闸。



Reverse power relay


逆功率继电器



This device is located in the individual generator panel and built in PPU. During parallel


running when a DG start absorbing power from other DG in exceeding a preset value (10% of


it’s rated power) of the it’s protection device and if maintained for a duration of 10s, the


generator’s ACB will be tripped by the devi


ce.













该装置在发电机屏内,

< p>
当并联运行时一台发电机从其他发电机吸收功率持续超过某个值



10%


的额定功率)


10s

,发电机主开关跳闸




Undervoltage release


欠压脱扣装置



This device which is located in the generator’s ACB, providing protection against


undervoltage.


该装置在发电机主开关上


,


为发电机提供欠压保护



When the incoming voltage drop below a value between 35% and 70% of the respective rated


voltage, this release device will trip the ACB after a short period of time ranging from about


0.3 sec to 0.5 sec. The short time delay is to prevent the ACB from tripping in the event of the


transient voltage dip.


当发电机的电压低于发电机额定电压


35%




70%


之间时


,


欠压脱扣装置延时


0.3 sec ~


0.5 sec


动作


,

< p>
发电机主开关跳闸。延时是为了避免电压瞬时波动


,


而导致发电机跳闸。




Preferential trip relay


优先脱扣继电器



This device which is located in the individual generator pane and built in PPU, provides the


first stage of over-current protection


against a eventual tripping of the generator’s ACB


during heavy load condition. When the prevailing generator current exceed the preset value


(100


% of generator’s rated current) of the protection device and maintain for a duration of


5s


or 10s, it will trip the all the assigned non essential loads thus preventing the load current


from reaching the critical threshold value.


当发电机电流超过额定电流


100%



,


发电机屏内


PPU


中的优先脱扣 继电器动作


,


延时


5s ~10s,


将一些不重要负载切断






2



Alarm monitoring, generator automatic control and power


management system


报警监测,发电机自动控制与功率管理系统


:


General structure


总体结构



The typical processing pattern of the PLC as follows



PLC


典型处理方式如下


:


?



Acquisition of digital and analog input signals make via the I/O port of the PLC from the


various sensors within and outside of the MSB.


通过


PLC


输入输出接口


,

< p>
对来自主配电板内外传感器上模拟量数字


量信号的采集


?



Acquisition of information and instruction via the local network.


局域网信息采集



?



Processing of t


he user’s program.



用户程序处理



?



Changing and updating of the outputs at the I/O output of the PLC.


改变与更新


PLC


输出



System Architecture


系统结构




?



Black-out processing function


全船失电处理功能


:


The Main PLC issues a engine start signal to the DG defined within the


priority management function and couple the DG to the main bus, thus


completing the black-out processing function.


当一台在 网发电机发生故障


,


主开关跳闸


,


导致全船失电。



PLC


立刻发给另一台发电机起动


命令。当该发电机达到额定电压

85%,


主开关合闸。全船失电处理


功能完成。

< p>


?



Bus abnormal processing function (with blackout)


汇流排异常处理功能(包括汇


流排失电)


:



The Main PLC initiates the starting of the DG defined by the priority


management function. Upon voltage build-up, a CB trip signal is issued


to disconnect the duty DG and subsequently coupling the running


standby DG to the main bus, thus completing the bus abnormal


processing function.


当汇流排异常时


, PLC


立刻发给 另一台发电机起动命令。当该发电机达到额定电压


85%,


主< /p>


开关合闸。


实施负载转移之后


,


发给故障发电机停止负载转移


,


主开


关分闸。汇流排异常处理功能完成。



?



Underload detection and processing function


轻载解列功能


:



This function is activated when two or more DG are coupled to the bus.


When the prevailing load of each DG drops below the parameterized


percentage of it’s rated capacity and for a duration in exceeding the


parameterized time, the DG to be taken off from the main bus are


predefined by the priority management function, will undergo the


process of load shifting, uncoupling and engine stopping.


当两台或更多台发电机在网,如果每台发 电机的负载低于预先设定值,则


PLC


发出负载转


移命令,将其中一台发电机负载转移之后,该发电机主开关分闸,


发出停机命 令。



?



Large motor start request processing function


重载问询功能



Whenever a large consumer initiates a start request signal to the PMS,


the Main PLC will check for available power. If the available power is


sufficient to provide for the large motor without exceeding 85% of


coupled DG’s rated capacity, the Main PLC will then issue a start


authorized signal back to the calling consumer. Otherwise the Main


PLC will initiate the startup, auto coupling and load sharing sequence


of the next DG predefined by the priority management function via the


respective generator PLC. Subsequently the Main PLC will computed


the available power to confirm it is sufficient, before issuing the start


authorized signal to the calling consumer.


In the event if no DGs are available for the addition power requirement,


then the start authorized signal will not be issued and calling consumer


will be prevent from running until manual overriding by operator.


当功率管理系统接收到重载询问信号时,


PLC


计算在网发电机剩余


有效功率。


如果剩余有效功率能满足大电动机起动


(未超过发电机


额定功率


85%




P LC


发出重载起动认可信号。


如果剩余有效功率


不能满足大电动机起动,


PLC


先发出给予备用发电机 起机命令,



动并车,负载均分,最后


PLC


发出发出重载起动认可信号。



3



MSB operating procedure


操作方式



3.1 Under Manu mode


手动模式


:




With single DG running:


单台发电机运行



1.



Put the control of the selected DG to remote control possible to enable


the remote starting of engine from the MSB.


发电机转到遥控


,


将主配电板同步屏 上发电机控制开关选择到起


动位置


,


发 电机起动。



2.



Once the DG speed has pickup, the operator shall release the ENGINE


CONTROL switch letting it self-return to the neutral position. The DG


should run up to or close the rated speed. Simultaneously the generator


output voltage should reach the rated value.



一旦发电 机运转起来


,


放掉发电机控制开关手柄


,


开关将自动恢复


到断开位置。


< /p>


发电机将以额定速度运转。同时


,


发电机 输出电压将


达到额定电压。



3.



The frequency of the generator output voltage can now be monitored


on the respective frequency meter and if the value has deviated, the


operator can bring back to the rated value by adjusting the DG speed

-


-


-


-


-


-


-


-



本文更新与2021-02-17 16:27,由作者提供,不代表本网站立场,转载请注明出处:https://www.bjmy2z.cn/gaokao/662560.html

PMS功能说明的相关文章