孟加拉国
Ghorasal 2×
150MW<
/p>
燃气发电机组
4
年长维护服务
报价单
Four
Years
’
Maintenance Service
of Bangladesh
Ghorasal
2×
150MW Gas Turbine
Generator Units
Quotation
List
1
、
项目名称:孟加拉国
Ghorasal 2×
< br>150MW
燃气发电机组
4
年长
维护服务
Project Name: Four
Years
’
Maintenance Service
for Bangladesh Ghorasal 2×
150MW
Gas Turbine Generator Units
2
、
项目总价:我方按照业主要求,完成附件
1
< br>所列服务项目工作,对该项目总体报
价为
USD2,284,800
元。
Total Price of Project: According to
the Owner
’
s requirement, our
party shall finish the
services
for
project
scheduled
in
Appendix
1.
Total
quotation
for
this
project
is
USD2,284,800.
费用计算如下:
Fee is
calculated as follows:
项目
Item
人月单价
Man month
unit rate
4500
人数
Number of
personnel
16
人月总数
Total number
of man
month
672
总价格
Total price
2,284,800
3
、
以上报价包括:
Above quotation includes:
?
我方人员工资
,
加班工资
,
补助、交通费,保险、企
业的有关费用、中国国内的
税收等。
(业主方须提供必要的生活
办公设施如:住房、办公室、办公桌、椅、
床、空调,以及厨房用具等)
。
Our
personnel
’
s
salary,
overtime
pay,
subsidy,
traffic
expense,
insurance,
relevant
charge of enterprise, tax in
China, etc. (The Owner
shall
afford necessary
facilities
for
living
and
working,
such
as:
living
rooms,
offices,
desks,
chairs,
beds,
air-conditioners and appliance in
kitchen.
?
我方人员的签
证费及相关费用,但不包括在当地的各种税费及管理费用。
Our
personnel
’
s
fee
for
visa
and
relevant
fees,
however,
not
include
local
various
taxes and charges or
management fees.
?
我方人员日常办公费用、通讯费用等。
Our
personnel’s
daily working charges and communication
charges.
4
、附录:
Appendix:
附件
1
工作服务范围
Attachment
1: Working Service Scope
附件
2
人员配置清单
Attachment
2: Personnel Allocation List
附件
3
差异及须澄清的内容
Attachment 3: Difference and Content
to
be Clarified.
附件
1
Attachment 1:
孟加拉国
Ghorasal2×
150MW
燃气发电机组
长期服务工作范围
Bangladesh Ghorasal
2×
150MW
Gas
Turbine Generator Units
Long Term
Service Scope
我
方派驻人员,主要完成该
2
台机组质保期后开始的商业运行期间
,共四年的服务工
作,工作形式为技术监督和指导,不负责检修维护的人员组织和材料备
件组织(除非甲
方另有要求)。
The
personnel
dispatched
from
our
party
should
mainly
finish
four
years’
service
for
2
units
during
business
operation
after
warrantee
period.
Service
forms
include
technology
supervision
and
instruction,
not
including
organizing
overhaul
&
maintenance
staffs
or
material spare parts (
Unless
The Owner has other requirement).
对于
4
年期内的大小修项目,
不包含在本服务范围内,
但可作为单独项目另行约定费
用及
工作内容。
Overhaul and minor
overhaul items in the four years are not included
in this service scope,
but they can be
agreed on fees and service content as an
independent
item
.
我方报价和工作内容暂时不包括备品备件、材料、生产消耗性材料的采购,若业主有
要
求,可另行约定费用及内容。
Our
quotation
and
service
scope
do
not
include
purchase
of
spare
parts,
material,
consumable
material
for
production
temporarily.
If
The
Owner
requires,
it
could
be
negotiated
on fees and
content separately.
其主要内容如下
Main
content is
as follows:
1
、设备停
运期间的检查和厂家要求的定期检查
根据燃气轮机发电机定期停运检查要求或参照制造商说明和下表所列时间:
Inspection during outage of equipments
and periodical inspection The Owner required
should
be
carried
out
according
to
periodical
outage
inspection
requirements
of
GTG
or
manufacturer's guidelines and at such
time as set out in the table below:
停运检查的时间安排
Timing
检查类型
of
Scheduled Outage
Inspection
Type of Inspection
运行至少达
7000
小时左右
At
燃烧检查(总承包(
EPC
p>
)合同下的质保期内的第一次
7000 Hr or
Equivalent Starts
燃烧检查)
属于安装工程总承包商质保期之外的维护服务应列入长期服务
协议内
Combustion Inspection
(1st CI within the warranty period
under the EPC contract)
Scheduled maintenance services beyond
the EPC contractor's warranty period to
be rendered under the LTSA
运行至少达
20000
小时左右
At least 20000 Hr
p>
运行至少达
27000
小时左右
At least 27000
Hr
运行至少达
40000
小时左右
At least 40000 Hr
p>
运行至少达
48000
小时左右
At
least 48000 Hr
热气路径检查
Hot Gas Path Inspection
燃烧检查
Combustion Inspection
热气路径检查
Hot
Gas Path Inspection
大检
/
大修
Major Inspection / Overhaul
2
、重点检查和指导的工作内容
Service content of critical inspection
and conduct
我方所派遣的技术专家,
须
监督和完成上表列明的基本辅机设备的
CI(
燃烧检查
)/HGPI
(热气路径检查
)
/
MI
(大检)
&
大修和维护,以及下述(包括但不限于)检测
&
调
试项目等:
The Experts proposed
by our
party shall supervise and carry out the CI/HGPI /
MI
&
overhauling,
maintenances
of
essential
BOP
equipment
scheduled
in
above
table
and
testing & commissioning
items of the followings (indicative, but not
limited to):
热块和燃烧室的拆卸
(应该根据要求参比测量再组装的联轴器对中、
叶片和汽封间隙)
?
Disassemblyof thermal block and
combustion chamber (Reference measurements have to
be
taken for coupling alignments, blade
and labyrinth Clearances required for re-assembly,
as
-
-
-
-
-
-
-
-
-