-
水处理常用构筑物专用词汇及例句(
1
)
1
、集水井
collector well
集水坑
sump
集水池
collecting
tank
例句:
The
sewage
first
treated
by
pretreatment
system
(including
accidents
regulation
pits,
collecting
tank
,
pH
adjustment,
and
cooling
tower),
then
treated
by
UASB
reactor,
the
removal
rate of
CODcr
of
water
after
treatment
was
76 % and removal rate of
BOD reached 83 %, finally the water flew into SBR
pits
for
further
treatment,
the
removal
rate
of
CODcr
and
BOD5
reached
91
%
and
95
%
respectively.
污水先经预处理系统
(
包括事故调节池、
集水池
、
pH
调节、
冷却塔
< br>)
处理后进入
UASB
反应器处
理
,
经处理后出水
CODcr
去除率达
76%,BOD
去除率达
83%
。
然后进入
SBR
池处理。
2
、调节池
regulating-pool
Adjustive pool
例句:
Improving
Regulating-
Pool
's Usable Function by Applying the
Theory of
Completely Mixing and
Hydrolysis-Acidification
应用完全混合、水解—酸化理论提高
调节池
的使用功能。
With the need of idiographic
project, the hydraulic characteristics of
adjustive
pool
is
thoroughly
discussed.
The
diagnostic
expressions
is
obtained,
and
is analysed.
结合工程实际,对水量
p>
调节池
的水力特性进行了较深入的探讨,推导出已知变进
水量调节池的特征公式,并进行了验证和分析。
3
、沉淀池
settling tank
例句:
Study
on
the
Application
of
SD
Tank
Bottom
Valve
in
Stilt
Pipe
Settling
Tank
of Brine.
SD
池底阀在卤水斜管
沉淀池
中的应用研究。
< br>
初沉池
primary settling tank
例句:
Sewage
sludge
which
mainly
comes
from
the
primary
settling
tank
and
discharge of surplus
sludge is the deposit produced in each operating
unit in
municipal wastewater treatment
plant.
城市污泥是城市污水处理厂经各
级处理净化污水而产生的沉积物,主要来自
初沉
池
和剩余污泥的排放。
二沉池
secondary
settling tank
例句:
When the
wastewater is treated by UASB reactor,58.9%COD is
removed, and
granular sludge is formed
in UASB reactor. When the UASB reactor effluents
go
-
-
-
-
-
-
-
-
-
上一篇:味精生产工艺初步设计说明书完成
下一篇:1 漆膜附着力测定法 GB