水处理常用构筑物专用词汇及例句(专业英语)(1)

作者:高考题库网
来源:https://www.bjmy2z.cn/gaokao
2021-02-13 17:21
tags:

-

2021年2月13日发(作者:convey)


水处理常用构筑物专用词汇及例句(


1




1


、集水井



collector well


集水坑



sump


集水池



collecting tank


例句:



The


sewage


first


treated


by


pretreatment


system


(including


accidents


regulation


pits,


collecting


tank


,


pH


adjustment,


and


cooling


tower),


then


treated


by


UASB


reactor,


the


removal


rate of


CODcr


of


water


after


treatment


was


76 % and removal rate of BOD reached 83 %, finally the water flew into SBR pits


for


further


treatment,


the


removal


rate


of


CODcr


and


BOD5


reached


91


%


and


95


%


respectively.






污水先经预处理系统


(


包括事故调节池、


集水池



pH


调节、


冷却塔

< br>)


处理后进入


UASB


反应器处 理


,


经处理后出水


CODcr


去除率达


76%,BOD


去除率达


83%




然后进入


SBR


池处理。





2


、调节池



regulating-pool












Adjustive pool





例句:



Improving


Regulating- Pool


's Usable Function by Applying the Theory of


Completely Mixing and Hydrolysis-Acidification



应用完全混合、水解—酸化理论提高


调节池


的使用功能。



With the need of idiographic project, the hydraulic characteristics of


adjustive


pool



is


thoroughly


discussed.


The


diagnostic


expressions


is


obtained,


and is analysed.



结合工程实际,对水量


调节池


的水力特性进行了较深入的探讨,推导出已知变进

< p>
水量调节池的特征公式,并进行了验证和分析。



3


、沉淀池



settling tank


例句:







Study


on


the


Application


of


SD


Tank


Bottom


Valve


in


Stilt


Pipe


Settling


Tank



of Brine.


SD

池底阀在卤水斜管


沉淀池


中的应用研究。

< br>



初沉池



primary settling tank






例句:







Sewage


sludge


which


mainly


comes


from


the


primary


settling


tank



and


discharge of surplus sludge is the deposit produced in each operating unit in


municipal wastewater treatment plant.



城市污泥是城市污水处理厂经各 级处理净化污水而产生的沉积物,主要来自


初沉



和剩余污泥的排放。




二沉池



secondary settling tank




例句:







When the wastewater is treated by UASB reactor,58.9%COD is removed, and


granular sludge is formed in UASB reactor. When the UASB reactor effluents go

-


-


-


-


-


-


-


-