中英文对照翻译工程施工管理
5.1
现场布置
5.1 Site
Layout
5.1.1
项目组织机构图
5.1.1 Project Organization Chart
5.1.2
组织机构说明
中英文对照翻译工程施工管理
5.1.2 Introduction of Organization
根
据
本
工
程
的
特
点
< br>,
本
着
“
精
干
、
高
效
”
的
原
则
p>
组
建
南
苏
丹
Magwi-
Lobone
公路项目部,项目经理为项目的第一责任人。
In
accordance
with
features
of
the
project
and
under
the
principle
of
“
high capability and
efficiency
”
, establish the
Southern Sudan Magwi-Lobone
Highway
Project Department, and the project manager is the
primary person
in charge of the
project.
项目部下设:
The
Project department comprises:
◆
决策层:项目经理、项目副经理、总工程师;
◆
Decision-making
level:
Project
Manager,
Deputy
Project
Manager,
General Project Engineer;
◆
管理层:施工部、技术部、合同部
、财务部、
QHSE
部、机物部、
行政
部;
◆
Management
level:
Construction
Dept.,
Technology
Dept.,
Contract
Dept.,
Financial
Dept.,
QHSE
Dept.,
Mechanical
Materials
Dept.,
Administration Dept.;
◆
工区作业层:根据本工程特点,按
照工区管理作业队及班组的形
式。设置
4
个工区,即土方一工区、土方二工区、路面工区、综合工区。
◆
Work area
operation level: in accordance with features of
the project
and as per work
area
’
s form to manage
operation teams and groups, set up 4
work areas, namely Earthwork area I,
Earthwork area II, Road pavement area,
Complex processing area.
p>
5.1.3
主要管理层的主要工作内容及职责
5.1.3 Main Work Content and Duties of
Main Management Level
?
施工部:负责施工现场的调度及生产组织等。负责测量队的归口
管理及协
调工作。
中英文对照翻译工程施工管理
?
Construction
Dept.: be responsible for scheduling of
construction site
and organization of
production, etc. In charge of the centralized
management
and coordination work of
Survey Team.
测量队:负责本项目测量控制网
建立、地形地貌测绘,施工现场测
控、结算测量以及竣工测量等工作。
< br>
Survey Team: be responsible for the
establishment of surveying control
network
and
geographic
and
geomorphic
surveying
and
mapping
of
the
project,
construction
site
survey
and
control,
settlement
survey
and
final
survey, etc.
?
技术部:负责工程的施工方案和施
工技术措施的编写,施工图纸
的设计,进度的编制及进度更新等工作。
< br>
?
Technology
Dept.: be responsible for the compilation of
construction
scheme
and
construction
technical
measure
of
the
project,
design
of
construction drawings,
compilation of schedule and schedule update, etc.
?
QHSE
部:负责工程质量控制管理,各工序施工终检、验收,竣
工资料整编等。负责施工安全管
理、爆破安全、交通安全管理、施工人
员健康、消防、保卫、施工区环境保护等。负责实
验室的归口管理及协
调工作。
?
QHSE
Dept.:
be
responsible
for
the
project
’
s
quality
control
management, final inspection and
acceptance of construction of all processes,
reorganize completion data, etc. In
charge of construction safety management,
blasting
safety,
traffic
safety
management,
health
of
construction
personnel,
fire
control,
security,
construction
area
environmental
protection,
etc.
In
charge of
the centralized management and coordination work
of Laboratory.
?
实验室:负责本项目原材料检测、
土工试验、混凝土现场实验、
沥青混凝土实验任务以及外送委托实验任务等内容等。
p>
?
Laboratory: be responsible for material
test, soil test, concrete field
experiment,
asphalt
concrete
experiment
task
and
outside
entrusted
中英文对照翻译工程施工管理
experiment task and other content of
the project, etc.
?
合同部:负责合同管理、工程结算、资金流控制、预算编制等。
?
Contract
Dept.:
be
responsible
for
contract
management,
project
settlement, fund
flow control, budgeting, etc.
?
财务部:
负责成本管理、
成本控制、
内部经营及负责项目部的内、
外财务运作及管理等。
?
Financial
Dept.:
be
responsible
for
cost
management,
cost
control,
internal
operation
and
in
charge
of
internal
and
external
financial
operation
and management of
the Project Department, etc.
?
机物部:负责设备、物资、施工材
料、设备配件供应及物供合同
的管理,项目部仓储系统的管理,施工设备运行及修理的管
理。
?
Mechanical Materials Dept.: be
responsible for supply of equipment,
material,
construction
material,
equipment
accessories
and
management
of
material
supply
contract,
management
of
the
Project
Department
’
s
storage
system,
and
management
of
the
operation
and
repair
of
construction
equipment.
?
行政部
:负责文件收发、档案管理,内部行政事务,对外协调;
负责后勤服务;负责项目的人力
资源招聘及管理等。
?
Administration Dept.: be responsible
for receiving and sending files,
archives
management,
internal
administrative
affairs
and
external
coordination; in
charge of logistics service; in charge of the
human resource
recruitment and
management of the project, etc.
?
一工区:包括
2
个路基作业队,
1
个结构物作业
队和
1
个排水作
业队。
负责
0+000-40+000
段的清表、
土石方开挖回填、
排水沟、
涵洞、
桥梁的施工管理。
?
Work
area
I:
includes
2
subgrade
construction
teams,
1
structure
construction team
and 1 drains construction team. Be responsible for
surface
-
-
-
-
-
-
-
-
-