中英文对照翻译工程施工管理



5.1


现场布置



5.1 Site Layout




5.1.1


项目组织机构图



5.1.1 Project Organization Chart



























5.1.2


组织机构说明



中英文对照翻译工程施工管理



5.1.2 Introduction of Organization









< br>,



















Magwi- Lobone


公路项目部,项目经理为项目的第一责任人。



In


accordance


with


features


of


the


project


and


under


the


principle


of



high capability and efficiency



, establish the Southern Sudan Magwi-Lobone


Highway Project Department, and the project manager is the primary person


in charge of the project.





项目部下设:



The Project department comprises:




决策层:项目经理、项目副经理、总工程师;




Decision-making


level:


Project


Manager,


Deputy


Project


Manager,


General Project Engineer;





管理层:施工部、技术部、合同部 、财务部、


QHSE


部、机物部、


行政 部;




Management


level:


Construction


Dept.,


Technology


Dept.,


Contract


Dept.,


Financial


Dept.,


QHSE


Dept.,


Mechanical


Materials


Dept.,


Administration Dept.;





工区作业层:根据本工程特点,按 照工区管理作业队及班组的形


式。设置


4


个工区,即土方一工区、土方二工区、路面工区、综合工区。





Work area operation level: in accordance with features of the project


and as per work area



s form to manage operation teams and groups, set up 4


work areas, namely Earthwork area I, Earthwork area II, Road pavement area,


Complex processing area.



5.1.3


主要管理层的主要工作内容及职责



5.1.3 Main Work Content and Duties of Main Management Level


?



施工部:负责施工现场的调度及生产组织等。负责测量队的归口


管理及协 调工作。



中英文对照翻译工程施工管理



?



Construction Dept.: be responsible for scheduling of construction site


and organization of production, etc. In charge of the centralized management


and coordination work of Survey Team.



测量队:负责本项目测量控制网 建立、地形地貌测绘,施工现场测


控、结算测量以及竣工测量等工作。

< br>


Survey Team: be responsible for the establishment of surveying control


network


and


geographic


and


geomorphic


surveying


and


mapping


of


the


project,


construction


site


survey


and


control,


settlement


survey


and


final


survey, etc.




?



技术部:负责工程的施工方案和施 工技术措施的编写,施工图纸


的设计,进度的编制及进度更新等工作。

< br>


?



Technology Dept.: be responsible for the compilation of construction


scheme


and


construction


technical


measure


of


the


project,


design


of


construction drawings, compilation of schedule and schedule update, etc.


?



QHSE


部:负责工程质量控制管理,各工序施工终检、验收,竣


工资料整编等。负责施工安全管 理、爆破安全、交通安全管理、施工人


员健康、消防、保卫、施工区环境保护等。负责实 验室的归口管理及协


调工作。



?



QHSE


Dept.:


be


responsible


for


the


project



s


quality


control


management, final inspection and acceptance of construction of all processes,


reorganize completion data, etc. In charge of construction safety management,


blasting


safety,


traffic


safety


management,


health


of


construction


personnel,


fire


control,


security,


construction


area


environmental


protection,


etc.


In


charge of the centralized management and coordination work of Laboratory.




?



实验室:负责本项目原材料检测、 土工试验、混凝土现场实验、


沥青混凝土实验任务以及外送委托实验任务等内容等。



?



Laboratory: be responsible for material test, soil test, concrete field


experiment,


asphalt


concrete


experiment


task


and


outside


entrusted


中英文对照翻译工程施工管理



experiment task and other content of the project, etc.



?



合同部:负责合同管理、工程结算、资金流控制、预算编制等。



?



Contract


Dept.:


be


responsible


for


contract


management,


project


settlement, fund flow control, budgeting, etc.



?



财务部:


负责成本管理、


成本控制、


内部经营及负责项目部的内、


外财务运作及管理等。



?



Financial


Dept.:


be


responsible


for


cost


management,


cost


control,


internal


operation


and


in


charge


of


internal


and


external


financial


operation


and management of the Project Department, etc.



?



机物部:负责设备、物资、施工材 料、设备配件供应及物供合同


的管理,项目部仓储系统的管理,施工设备运行及修理的管 理。



?



Mechanical Materials Dept.: be responsible for supply of equipment,


material,


construction


material,


equipment


accessories


and


management


of


material


supply


contract,


management


of


the


Project


Department



s


storage


system,


and


management


of


the


operation


and


repair


of


construction


equipment.



?



行政部 :负责文件收发、档案管理,内部行政事务,对外协调;


负责后勤服务;负责项目的人力 资源招聘及管理等。



?



Administration Dept.: be responsible for receiving and sending files,


archives


management,


internal


administrative


affairs


and


external


coordination; in charge of logistics service; in charge of the human resource


recruitment and management of the project, etc.



?



一工区:包括

2


个路基作业队,


1


个结构物作业 队和


1


个排水作


业队。


负责


0+000-40+000


段的清表、

< p>
土石方开挖回填、


排水沟、


涵洞、


桥梁的施工管理。



?



Work


area


I:


includes


2


subgrade


construction


teams,


1


structure


construction team and 1 drains construction team. Be responsible for surface

-


-


-


-


-


-


-


-