Engineering cost management


Project cost control emphasis should be transferred to the project construction early


days,


is


transferred


to


the


project


decision


and


design


stage.


Project


cost


control


in


construction projects


throughout


the entire process,


the key lies in


the pre construction


investment


decision-making


with


design


phase,


whereas


in


the


investment


decision


is


made, the key lies in designing. According to expert analysis: architectural design, in the


preliminary design stage, design stage, construction design stage to the engineering effect


were 75% ~ 95%, 35% ~ 75%, 5% ~ 35%; while in the construction phase, through the


optimization of construction organization design, construction cost saving the possibility


of only 5% to 10%. We should put the focus shifted to the design stage, in order to get


twice the result with half the effort.


Pay


attention


to


the


technical


and


economic


optimization


combination.


The


combination


of


technology


with


economy


is


most


effective


way


to


control


engineering


cost.


China


engineering


fields


for


a


long


time


did


not


do


this.


The


lack


of


technical


personnel economy idea, design thought is conservative, the design of the outcome of the


economy


are


not


fully


reflect.


Therefore,


we


should


solve


the


problem


is


to


improve


economic efficiency as the goal, in the construction process, organization, technology and


economy organic ground union rises. Through the economic analysis, comparative study


and


effect


evaluation,


correct


processing


of


advanced


technology


and


reasonable


in


economy between the relation of unity of opposites, strive to advanced technology under


the


conditions


of


economic


rational,


reasonable


in


economy


based


on


advanced


technology.


Carry out


value


engineering


to


the


specific


design,


actively


promote


quota


design


in


engineering


design contract, by way of bidding. This has been proven in practice is an effective way,


it is not only an economic problem, more precisely a technical and economic problems.


This



is


designed


to


achieve


the


desired


objectives,


should


be


involved


in


the


design


personnel


must


be


experienced


skilled


economic


designer.


Their


design


results


must be practical, advanced and reasonable cost. Control of engineering cost on the other


hand


is


the


need


for


comparison,


because


the


outcome


is


a


process


of


gradual


improvement, and not to decide, so the comparison is a measure of its practical, advanced


and economical means.


Do


good


project


cost


control


in


the


process.


(


1)


compilation


of


economic


and


feasible


construction


scheme.


Before


construction,


construction


enterprises


should


be


combined


with


the


construction


drawings


and


the


actual


situation


at


the


scene,


their


mechanical


equipment,


construction


experience,


the


management


level


and


technical


specification acceptance criteria, a set of practical and feasible construction scheme. The


construction scheme is engineering implementation of the programme of action. ( 2) to


technical


personnel,


materials,


machinery


and


personnel


staff


communication


and


coordination.


In


the


process


of


construction,


construction


technology,


materials


and


mechanical personnel should cooperate closely, understand each other, to management as


the


core,


to


reduce


costs


for


the


purpose


of.


(


3)


to


the


project


completion


settlement.


Strict


supervision


system.


Control


project


cost


effectively,


in


the


early


phase


of


the


project


shall


be


subject


to


supervision


(including


cost


management


)


system.


Through


analyzing


the


design


process


of


supervision,


make


the


design


more


reasonable,


cost


control


to


limit


the


scope


of,


accomplish


truly


with


the


smallest


investment


maximize


output.


Strict supervision system. Control project cost effectively, in the early phase of the


project


shall


be


subject


to


supervision


(including


cost


management


)


system.


Through


analyzing


the


design


process


of


supervision,


make


the


design


more


reasonable,


cost


control


to


limit


the


scope


of,


accomplish


truly


with


the


smallest


investment


maximize


output.


To establish and perfect the independent project cost advisory body, cultivate a Zhi


De have both engineering team. To establish a real sense of independent engineering cost


consulting


agencies.


Through


improving


the


laws


and


regulations,


normative


behavior,


separate


government


functions


from


enterprise


management,


the


establishment


of


independent business partnership, share-holding system, the limited responsibility system


and other forms of organization, an industry-based, diversified services integrated project


consulting


company,


build


and


development


and


reform


the


engineering


cost


intermediary


service


institutions,


make


construction


project


management


of


a


gradual


transition by an independent specialized agency in charge of project cost whole process


tracking management, truly between owner and contractor plays an intermediary role. To


strengthen engineering cost consulting industry association construction, establish project


cost


consulting


industry


self-discipline


mechanism,


and


constantly


improve


the


Engineering Cost Association in engineering cost consulting industry status, to be truly


representative


of


the


interests


of


the


majority


of


the


industry


practitioners,


government


and enterprises to become connection link and the bridge. At the same time to strengthen


the


project


cost


specialty


in


higher


education


and


in


service


education.


As


a


result


of


project


cost


management


in


construction


projects


and


various


economic


interests


are


closely


related,


and


the


whole


social


economic


activities


play


a


very


important


role,


it


requires


the


cost


engineering


technical


personnel


should


have


different


levels


of


knowledge, in addition to their professional knowledge and have a deep understanding,


also


deal


with


the


design


content,


design


process,


construction


technology,


project


management,


economic


laws


and


regulations


have


a


comprehensive


understanding


of.


Therefore,


the


project


cost


management,


project


cost


per


unit


of


society


groups,


has


already obtained a cost engineer qualification personnel, in order to carry out plan, has

-


-


-


-


-


-


-


-