A






Risk Assessment Part 1:



Assessment with existing control measures



B


Activity (or area) being assessed:




Dytel/Moore Vernon Gauges




People




Rolls-Royce:


8


Frequency/duration:


8hs 3shfts




























Others:


0


Frequency/duration:


N/A


affected:







Business:




TURBINE SYSTEMS


Department:




DIMENSIONAL


Dept. no.:



2225


Location:



PCF




Assessment ref. no.










Date of assessment:




31/03/04



Assessor(s)/team: …














3


Review


Date:









Name:









Signed:









G



rd




NT


















4


Review


Date:









Name:









Signed:









H


J


th



Q


Periodic reviews



maximum


intervals for activities with:


1


Review


Date:


31/03/05


Name:



Signed:









E


st


2


Review


Date:









Name:









Signed:








nd


Medium risk (but ALARP) - annually


Low risk - three-yearly



C


D


F


Consequence


(outcome)



Hazard


(potential for harm)


Hazardous event


(what happens)


Fall from ladder


Foreseeable cause


(cause of hazardous event)


Loss of balance


Details of harm


Broken limbs


Value


1 to 5


3


Existing control


measures used


Probability


1 to 5


3


Risk


1 to 25


9


medium



Example:


Working at height


Ladder in good condition, at


correct angle and tied off


1Trapped Hand


2Operation of


machine


3Visual imparement


4Noise


5Physical injury


6Hand held tooling


vibration


Fixture closing on


components


RSI


Examining results on


display screens


General factory noise


Dropping of tooling fixtures


Vibration white finger from


moving parts


Unsafe working practices


Continuous loading &


unloading of components


Continuous use of DSE


Finish area extraction &


machine noise


unsafe working practices


Continuous use of air tools


Broken fingers



Wrist & backache


Gradual deteration of


eyesight


Gradual hearing


impairment


Bruises & abrasions,


possible broken fingers


Vibration white finger


1


Safe


procedures,Machine


integrated


Intermittent breaks


DSE legislation, not a


continuous process


Area is ppe controlled &


hearing protection must


be worn


Operator training


Annual monitoring @


OHD


1


2


2


3


6


3


3


1


2


2


2


1


2


6


6


2


6


Page 1







K



Risk Assessment Part 2:



Assessment of risk reduction actions



L


Expected risk after


completion of actions


Probability


2


M


N


P


Proposed actions


(risk reduction measures)


Example (continued):


Use tower scaffold or hydraulic access


platform ……but remember to


consider additional hazards



Consequence


3


Risk


6


med


Planned action


completion date


1/1/2001


Actual


completion


date


25/12/2000


I confirm that the proposed actions have


been completed and that the expected


risk reduction has been achieved


Name


J. Bloggs


Re-assess risks to show how proposed


actions will be effective in reducing the risk.


Signature


Date


26/12/2000


?



?



?



?



Also consider whether any new


hazards will be introduced .



Joe Bloggs






































1








2








3








4 Noise reduction plan in


progress


5








6 Better Hand tooling




















0








1




















0








1




















2








1


Probability


















































































































































Accountable


Manager




Consequence


Incredible


Extremely


unlikely to


ever occur


1


Multiple


fatalities


Single


fatality


Major


injury


Lost time


injury


First aid


injury


Extensive


damage


Major


damage


Localised


damage


Minor


damage


No


damage


Significant


harm*


Moderate,


long-term


harm*


Moderate,


short-term


harm*


Low impact,


little harm*


No impact*


International


impact


National


impact


Considerable


impact


Limited


Impact


No Impact


5


4



3


2


1




Improbable


Unlikely but


may occur


exceptionally


2


Occasional


Likely to


occur some


time


3


Probable


Likely to


occur


often


4


Frequent


Regular or


continuous


occurrence


5




R


Lead Assessor


People


Assets


Environment


Reputation




High


Medium








Low



Signed




Name


(print)




Position




Date











*


Refer


to


“Environmental


Aspects


and


Impacts


Assessment


methodology


and


EnvAID


user?s


guide”


for


explanation


of


environmental


probability


and


consequence


categories.


Page 2


Guidance on Completion of Risk Assessment Form


Box/Column


A


Explanation (for detailed guidance refer to risk assessment guidance document)


Provide


details


of


the


activity


being


assessed


and


the


business


and


department


to


which


it


relates. Where the risk assessment is generic it should be clearly stated.


Indicate


the


people


who


could


be


affected


(including


contractors


and


the


public)


and


the


frequency and duration of exposure



precise details are not required.


B


A unique reference number should be allocated to the assessment, and the date of the initial


assessment and the main parties involved should be recorded.


Hazard:


The hazard is the thing with the potential for harm, such as a flammable substance,


rotating


machine


or


deep


water.


Record


all


of


the


significant


hazards


associated


with


the


activity being assessed. Ignore any trivial hazard.


The form provides space for listing six hazardous events (i.e. outcomes)



if more are needed,


continue on an additional sheet.


Although


the


risk


assessment


matrix


covers


risks


to


people,


assets,


environment


and


reputation,


each


of


these


risk


areas


should


be


considered


separately,


e.g.


consider


environmental hazards independently.


D


Hazardous


Event:



Give


a


very


brief


description


of


the


hazard


scenario


or


event




i.e.


what


happens that could lead to harm.



Foreseeable


cause:



Record


the


plausible


causes


of


each


hazard


being


released


or


the


foreseeable causes of exposure to the hazards.


E.g. how the substance is released, how a person becomes trapped in a dangerous machine,


how a person comes into contact with deep water.


F


Consequence:




This


column


is


divided


into


two


parts.



The


first


gives


brief


details


of


the


outcome of the hazardous event, whilst the second part records the value associated with the


harm,


taken


from


the


risk


matrix.



Clearly


the


description


of


the


harm


should


relate


to


the


appropriate category in the matrix.


First aid injury


: local first aid treatment received but no significant lost time.


Lost time injury


: off-site medical treatment or short-term lost time (e.g. days).


Major injury


: immediate major trauma long-term lost time (e.g. weeks)


It is important to be realistic is considering consequence, and although unlikely events should


be


considered,


they


should


nevertheless


be


plausible.



Note


that


if


there


is


more


than


one


plausible outcome from a hazardous event, each will need to be considered separately.


Taken together, columns C to F should provide an understanding of the hazardous event being


considered.


G


Existing Control Measures:


The presence of any existing control measures may reduce both


the


probability


of


an


incident


occurring


and


the


scale


of


the


consequences,


and


should


be


recorded to ensure that they are taken into account by the risk assessment and not overlooked.


This


record


of


control


measures


will


also


be


useful


when


preparing


a


written


safe


system


of


work, which should draw from the risk assessment.


Any


control


measures


specified


should


be


those


that


are


actually


used,


and


should


be


adequate for the purpose and regularly reviewed to ensure that they continue to be maintained


as effective controls. If there is doubt about the genuine usage or


effectiveness of a control


measure it should not be included as a risk reduction measure.


H


Probability:



Using


judgement


based


on


experience


and


historical


evidence,


estimate


the


probability of each hazardous event occurring using the categories given in the risk matrix. In


considering the probability account should be taken of the control measures that are in place


providing that they are genuinely used and of benefit.


If in doubt about which category to select, err on the side of caution. Further guidance on the


C


E


Page 3

-


-


-


-


-


-


-


-



本文更新与2021-02-11 20:29,由作者提供,不代表本网站立场,转载请注明出处:https://www.bjmy2z.cn/gaokao/638739.html

风险管理(英文版)的相关文章

  • 爱心与尊严的高中作文题库

    1.关于爱心和尊严的作文八百字 我们不必怀疑富翁的捐助,毕竟普施爱心,善莫大焉,它是一 种美;我们也不必指责苛求受捐者的冷漠的拒绝,因为人总是有尊 严的,这也是一种美。

    小学作文
  • 爱心与尊严高中作文题库

    1.关于爱心和尊严的作文八百字 我们不必怀疑富翁的捐助,毕竟普施爱心,善莫大焉,它是一 种美;我们也不必指责苛求受捐者的冷漠的拒绝,因为人总是有尊 严的,这也是一种美。

    小学作文
  • 爱心与尊重的作文题库

    1.作文关爱与尊重议论文 如果说没有爱就没有教育的话,那么离开了尊重同样也谈不上教育。 因为每一位孩子都渴望得到他人的尊重,尤其是教师的尊重。可是在现实生活中,不时会有

    小学作文
  • 爱心责任100字作文题库

    1.有关爱心,坚持,责任的作文题库各三个 一则150字左右 (要事例) “胜不骄,败不馁”这句话我常听外婆说起。 这句名言的意思是说胜利了抄不骄傲,失败了不气馁。我真正体会到它

    小学作文
  • 爱心责任心的作文题库

    1.有关爱心,坚持,责任的作文题库各三个 一则150字左右 (要事例) “胜不骄,败不馁”这句话我常听外婆说起。 这句名言的意思是说胜利了抄不骄傲,失败了不气馁。我真正体会到它

    小学作文
  • 爱心责任作文题库

    1.有关爱心,坚持,责任的作文题库各三个 一则150字左右 (要事例) “胜不骄,败不馁”这句话我常听外婆说起。 这句名言的意思是说胜利了抄不骄傲,失败了不气馁。我真正体会到它

    小学作文