Emergency Diesel Engine
Generator
应急发电机
Before and after the load test, the
insulation measurement to be carried out for
all electrical equipment that this test
concerns such as alternators and heaters
负载试
验前后应测量相关设备的绝缘,如发电机和加热器。
1. Alarm function
报警功能
Check and
adjust the set value of pressure switches for
alarm of lub. oil low
pressure by
manually operated hydraulic pump. Check and adjust
the set value of
temperature switches
for alarm of cooling water high temperature and
high
temperature by means of heating.
Check the indication function of alarm on control
box at the engine while set the value
of alarm. And check the proper function of
general alarm of emergency generator in
monitoring system of ECR.
用手摇
液压泵校对并调定滑油低压报警压力开关的调定值。用加热法校对
并调定冷却水高温及滑
油温度高报警温度开关调整值。整定报警值同时,检查
机旁控制箱上报警显示功能,并检
查集控室内监控系统的应急发电机总故障报
警功能
.
2. Safety protection
安全保护功能
Make diesel generator over speed by
artificial actuation. Check the function of
over speed and alarm for the stop by
over speed. Over speed test carried out under
no load condition.
人为造成柴油机超速
,检查超速功能,同时检查超速停车报
警功能。超速试验在没有负荷的状态下进行。
p>
Safety alarm test for emergency
generator
应急发电机安全报警试验
Test
Setting
Point
Test result
Remark
Lub. Oil inlet pressure low alarm
Lub. Oil
outlet temp. high
alarm
0.8bar±
0.2bar
116°
C±
3
96°
C±
3
2050r/min
--
--
--
--
--
--
0.8bar
115°
C
98°
C
OK
OK
OK
OK
OK
OK
OK
Simulation
Alarm No.20
Alarm No.23
Alarm No.37
Cooling water outlet temp. high alarm
Over speed (To AMS)
Common
alarm (To AMS)
Batter failure
Fule oil leakage alarm
LAL
of cooling water
E/G abnormal trip
Over current
3. Insulation resistance
test
绝缘测试
Insulation resistance test in cold
condition (M
Ω
) and hot
condition(M
Ω
)
Item
Stator winding
Generator space heater
Cold condition
500
500
Hot
condition
500
500
4. starting of emergency
generator.
应急发电机的启动试验
emergency generator in cold condition.
Check that it is stable and reliable
冷态启动应急发电机,检查启动是否平稳可靠
test and start fail alarm test with the first
power source (battery).
第一能源(蓄电池)启动试验和启动失败报警试验
4.2.1. Charged batteries in sufficient
time, start the diesel generator 3 times in cold
condition without recharging.
启动蓄电池充电之后,
中途不补充充电的情况下,
应能保证
冷态启动柴油机
3
次。
电瓶电压
25.8V
4.2.2. Make diesel
generator fail to start 3 times by cutting off
F.O. supply and giving
alarm
by the “START
FAILURE” on
control panel.
用切断燃油供给的方法使柴油发动机
3
次启动失败,
在控制板上来
“
START
FAILURE
”报警。
4.3 Check
reliability of the function for second power
source (spring start motor). Start
the
generator when cold with hand spring start motor
no less than three times within
thirty
minutes.
检查弹簧启动马达功能是否可靠(冷态)
,在
30
分钟内启动不少于
3
次。
4.4 Under
voltage trip test
欠压脱扣试验
Under no-load condition reduce
revolution of prime mover quickly and drop the
voltage
from 70% to 35% of rated value.
Record low-voltage auto-trip value of
generator.
在
空载状况下
快速降低柴油机的转速,使发电机电压从额定电压
70%
下降到
35%
,记录发电
机欠压自动脱扣值<
/p>
.
第一次启动后电压
25.49V
第一次启动后电压
25.54V
第一次启动后电压
25.4V
Gen.
Em gen
Rated
Voltage
450V
Set
Point (V)
70%~35%
Delay
Time
9s
Remarks
207V
Result
OK
4.5
Short Time Delay
短延时脱扣
Gen.
Em gen
Rated
Current
192.5
Set
Point
(
A
)
575
Delay
Time
≤
0.6s
Remarks
0.427s
Result
OK
4.6
Long Time Delay
长延时脱扣
Gen.
Em gen
Rated
Current
192.5
Set
Point
(
A
)
250
Delay
Time
≤
30s
Remarks
19.7s
Result
OK
5. Characteristic test of
emergency diesel generator
set.
应急发电机的特性试验
5.1. V
oltage adjusting
characteristic test at stable condition
稳态调压特性试验
Set the
load and power factor of diesel generator to
COS
φ
=1.0. Then
characteristic
test at stable condition
can be done.
During the
variety of the load as following:0
→
25%
→
50%
→
p>
75%
→
100%
→
75%
→
50%
→
25%
→
0, record
the value of power, current, voltage and frequency
at
different condition for generator.
COS
φ
=1.0
Calculate the stable characteristic
rate
△
V%=(V-Vn) / Vn x 100%
V:
voltage at
different power
Vn:
rated voltage 450V
△
< br>V%
≤
2.5%
Carry
out the test with load variety for two times and
record.
在柴油发电机的负载
和功率因数调整到
COS
φ
=1.0
后
,
就可以进行稳态特性试验。在试验负载按下
列程序:
0
→
25%
→
50%
→
75%
→
p>
100%
→
75%
→
50%
→
25%
→
0
变化时,记录个
工况下发电机
的功率,电流电压和频率值。
COS
φ
=1.0
计算稳态调整率
△
V%=(V-Vn) / Vn x 100%
V
是不同功率下的电压
Vn
是额定电压
450V
△
V%
≤
2.5%
负载变化过程做二次试验并做记录
No.
Power
percentage
功率百分比
1
0%
2
3
4
5
6
7
50%
8
25%
9
0%
25%
50%
75%
100%
75%