T
ender Format
Name of
Project
:
Offsite Pumping
Station Civil Engineering and Installation
W
orks for the Ancillary
Sewerage
Pipeline
Network
Project
of
Wuhu
East-City
Sewage
Treatment
Plant,
Undertaken
by
Wuhu
Construction
Investment
Corporation
Limited
of
Anhui
Province
Drawing
on
German
Government Loans
T
o:
Instrimpex International T
endering Co.
Dear Sirs,
1
.
After
having
examined
the
tender
documents
of
the
above
contract
(including
contract
conditions, technical specifications,
drawings, Bill of Quantities, and the addenda from
number 0703
-1250CIC2I083 to number
) and having conducted site visits, we
(the undersigned below) are
pleased to
undertake the whole project and defect repairing
work as specified by the tender documents
in accordance with the requirements
therein, at the total price of
euro (written
in complete
words) (EUR
).
2
.
W
e
acknowledge the appendix to the tender as the
constituting part of our tender.
3
.
If
winning the bid, we ensure that we will commence
the project within 7 days after the
rec
eption of the engineer’s
notice, and complete all tasks of the project as
specified in the contract
within the
time limit prescribed by the appendix to the
tender.
4
.
W
e
agree
to
comply
with
this
tender
within
180
days
from
the
expiration
date
of
the
submission
of tenders. Within the period this tender shall be
binding on us and we have the potential to
win the bid. If winning the bid, we
will secure a contract performance guarantee that
amounts to 10%
of the total contract
price.
5
.
Before the
formal contract is formulated through negotiation
and enters into force, this tender,
together with your bid winning notice,
shall be counted as an agreement that is bounding
on both
parties.
6
.
W
e
shall understand: you don’t have to accept the
tender of the lowes
t price or any
tender that
you may receive.
7
.
Commission or
remuneration that is related to this tender and to
the execution of the contract
after its
authorization and that should be paid to the
agents is listed as follows:
Agent Name and Address
Amount and Currency
Reasons
for
the
Payment
of Commission or Remuneration
(
If there is no
agent to pay commission or remuneration to, please
mark ―no‖.
)
Date: June 3, 2012
Signature
and Official Stamp
:
In
the Eligibility of First-Level Municipal Utility
Sign the T
ender as
Authorized on Behalf of
Address: No. 28
,
People’s South Road, Jingjiang
City
, Jiangsu Province. T
el:
0523
-89110526
Fax:
(including
telephone and fax numbers, as well as post code,
etc.)
Witness:
(Signature and
Official Stamp)
Address:
(including telephone and fax numbers,
as well as post code,
etc.)
Post:
Appendix to the
T
ender
Proprietor
Address
1
.
1
(
a
)
(
i
)<
/p>
Name: Wuhu Key Project
Construction Administration
Bureau
Address: No. 28, North Zhongshan Road,
Wuhu City
,
Anhui Province
Fax: +86 553 3838662
T
el: +86 553 3850037
Engineer
1
.
1
(
a
)
< br>(
iv
)
Address
Sum
of
Performance
10
.
1
Security
Period
of
V
alidity
of
10
.
2
Performance Security
10% of the Contract Price
30
days from the closing date of defects liability
period
and
after
the
acquisition
of
the
Defects
Liability
Certificate
Submitted
to
the
engineer
within
14
days
after
the
Contractor
and
the
Proprietor
sign
the
Contract
Agreement
With the time
limit of the contract ensured, the project
schedule plan shall be revised at least
once every three
months and submitted
to the engineer before the
25
th
day of the
last month in the previous schedule plan
Submitted
to
the
engineer
within
28
days
after
the
Contractor
and
the
Proprietor
sign
the
Contract
Agreement
0.2% (tentative)
0.2% (tentative)
56 days
after the signing of the contract (the order to
commence given by the supervisor shall
prevail)
10 months after the contract
takes effect
0.05% of the Contract
Price each day
10% of the Contract
Price
T
wo
years
(the
quality
guarantee
period
of
the
construction
project
shall
be
determined
by
current
documents)
Address
for
looking
up
references
Submission
time
of
the
project schedule plan
Submission
time
of
the
revisions
for
the
project
schedule plan
11
.
2
14
.
1
14
.
2
Submission time of the cash
flow estimate
Insurance
rate
of
Contractor’s All Risks
Minimum
amount
of
third
party liability
insurance
Time
of
issuing
operation
starting notice
Time limit
for the project
Overdue
damages
Upper
limit
of
overdue
damages
Defects liability
period
14
.
3
23
.
2
23
.
2
41
.
1
43
.
1
47
.
1
47
.
1
49
.
1
Quality standard
T
ender bond
Qualified
Y
es
Format of Power of Attorney
Declarations
are hereby made in this power of attorney: I,
Zhang Guiqing (Name of the Legal
Person), of Jiangsu Deity Dragon Sea
Engineering Company (Company Name),at No.
28
,
People’s
South
Road,
Jingjiang
City
,
Jiangsu
Province
(Place
of
Incorporation),
the
Legal
Representative(Post),legally
authorized, on behalf of the company in question
(hereinafter referred to
as
―Contractor‖), authorize
Kong
Lingzhi(Name), manager of operating division
(Post)as the formal
legal
representative, and authorize the legal
representative in question to sign tendering
documents,
negotiate, sign the
contract, and
execute
all
matters
related, in the name of and on
behalf of the
contractor, in terms of
construction, completion and maintenance related
to Offsite Pumping Station
Civil
Engineering and Installation W
orks for
the Ancillary Sewerage Pipeline Network Project of
Wuhu East-City Sewage Treatment Plant,
Undertaken by Wuhu Construction Investment
Corporation
Limited of Anhui Province
Drawing on German Government Loans(Name of the
Contract).
All parties are to sign severally below
in witness whereof.
Signature of the Authorizer:
(
Official
Stamp
)
Signature of the
Authorized
:
Signature of
the Witness
:
(
Official
Stamp
)
Date:
Chapter 5 Format of the Contract
Agreement
Format of the
Contract Agreement
This
agreement is reached on
(month)
(day), 2012 by
Wuhu Key
Project Construction
Administration
Bureau
(hereafter
referred
to
as
―Proprietor‖)
and
Instrimpex
International
T
endering Co.
(hereafter referred to as ―Proprietor’s
Agent‖), as Party A, and
Jiangsu Deity
Dragon
Sea Engineering
Company
(hereafter referred
to as ―Contractor‖), as Party B.
Since the Proprietor plans
to launch the following project, that is,
Offsite Pumping Station
Civil Engineering and Installation
Works for the Ancillary Sewerage Pipeline Network
Project
of Wuhu East-City Sewage
Treatment Plant, Undertaken by Wuhu Construction
Investment
Corporation
Limited
of
Anhui
Province
Drawing
on
German
Government
Loans
,
and
has
accepted
from
the
Contractor
the
tender
for
carrying
out
and
completing
these
projects,
and
remedying the defects, this agreement
is signed as follows:
1.
The wording
and sentences in this agreement share the same
meanings with those respectively
defined in the involved terms of the
contracts.
2. This
agreement is composed of the following documents,
for reading and interpretation. They are
(a) Bid-winning Notification,
(b) T
ender and tender
appendix,
(c) Bidding Document and
addenda,
(d) The second part of the
terms of the
contract
—
Special
T
erms,
(e) The first part of
the terms of the
contract
—
General Terms,
(f) Technical Specification,
(g) Drawings,
(h) Priced
Bill of Quantities,
(i) Auxiliary Data
Sheet, and
(j) Any other document
constituting the agreement.
3. Since the Proprietor
should pay the Contractor according to the
following term, the Contractor
should
make an agreement with the Proprietor,
guaranteeing that in all aspects, it must carry
out and
complete
the
project,
and
remedy
any
defect
of
the
project,
in
accordance
with
the
terms
of
the
agreement.
4.
The
Proprietor
hereby
covenants
to
pay
the
Contractor
in
consideration
of
the
execution
and
completion
of
the
project
and
the
remedying
of
any
defect
therein
the
Contract
Price
(
RMB
42201727.13
) or such other
sum as may become payable, within the time and in
the way stipulated in
the contract.
In witness whereof, this
agreement shall be stamped with the official seals
of both parties (or
signed
and
stamped)
by
representatives
of
both
parties
in
the
presence
of
the
witness,
and
shall
become effective upon
and from the date stipulated at the beginning of
the agreement.
Signature
Page
Appropriator: Key Project Construction
Administration of Wuhu City
Official Stamp
:
Signature
:
Name
:
[Printed Name]
Post
:
Appropriator
Agent
:
Instrimpex
International T
endering Co.
Official Stamp
:
Signature
:
Name
:
[Printed Name]
Post
:
Contractor
:
Official Stamp
:
Signature
:
Name
:
[Printed Name]
Post
:
Chapter Six: Format of the Bidder’s
Declaration of Undertaking
Annex D
Declaration of Undertaking
We underscore the importance of a free,
fair and competitive procurement process that
precludes
fraudulent
use.
In
this
respect
we
have
neither
offered
nor
granted,
directly
or
indirectly,
any
inadmissible advantages
to any public servants or other persons in
connection with our bid, nor will
we
offer or grant any such incentives or conditions
in the present procurement process or, in the
event
that we are awarded the contract,
in the subsequent execution of the contract.
We
also
underscore
the
importance
of
adhering
to
minimum
social
standards
(
Labour
Standards
Standards ratified
by the country of People’s Republic of
China.
We will inform our
staff about their respective obligations and about
their obligation to fulfil this
declaration of undertaking and to obey
the laws of the country of People’s
Republic of China.
Place, date
Bidder
Chapter 7
Auxiliary Data Sheet
T
able I. Major Construction
Machinery
T
able II. Major
Personnel
T
able III.
Estimated Contract Payment
T
able IV
. Plan
for T
emporary Project Lands
T
able V
.
Construction Organization T
echnique
Inquiries
T
able VI. Overall
conditions of the Bidder
T
able VII. Format of
Quotations
Note:
Corresponding Certifications shall be attached to
each table of the auxiliary data sheet.
Serial
Machines
(Type,
Numb
Model,
and
Place
of
er
Production)
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
Hydraulic
Excavator
Hydraulic
Excavator
Dump Truck
Dump Truck
Moto-crane
Moto-crane
Hydraulic
Grouting Pump
Recorder
Static Pressing
Piling Machine
Concrete
Mixer
Mortar Mixer
Spud
Vibrator
Plate Vibrator
Bar
Bending
Machine
Bar
Straightening
Machine
Bar
Cutting
Machine
AC Electric
W
elder
DC Electric Welder
Butt Welder
W
oodworking
Electric Saw
Wood Planer
Frog Rammer
Submersible Pump
Swage Pump
Pistol Drill
T
able I. Major Construction
Machinery
Y
ear
Estimate
of
New or
Own (O) or
Rated
Quantity
d CIF
Produ
Old
Leased
(L)
Power
Price
ction
8
8
4
6
4
4
4
4
1
6
6
18
12
8
8
8
6
6
6
8
8
18
20
20
8
2010
2010
2009
2009
2009
2009
2009
2009
2009
2010
2010
2010
2010
2010
2010
2010
2010
2010
2010
2010
2010
2010
2010
2010
2010
Old
Old
Old
Old
Old
Old
Old
Old
Old
Old
Old
Old
Old
Old
Old
Old
Old
Old
Old
Old
Old
Old
Old
Old
Old
O
O
L
L
L
L
L
L
L
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
98.2
25
1.5
0.7
0.07
0.1
0.2
4.2
0.3
0.26
0.21
1.1
0.13
0.3
0.18
0.05
0.08
0.08
Capacity
(t or
m
3
)
1.0m
3
0.6m
3
5t
20t
16t
Remarks
Earthwork
Earthwork
Transportation
Transportation
Pipeline
Hoisting
Equipment
25t
Hoisting
Compaction
Grouting
Grouting Amount
Measuring
Complex
45KW
30m/d
Building Pile
Foundation
Mixing
3
7.5KW
0.35m
Fragmentary
Concrete
5.5KW
0.25m
3
Mixing Mortar
1.1KW
Concrete Vibrating
2.2KW
Concrete
Vibrating
Reinforcing Bar
3KW
Processing
Reinforcing Bar
3KW
Processing
Reinforcing Bar
5.5KW
Processing
37KV
Reinforcing Bar
A
W
elding
Reinforcing Bar
11KW
W
elding
Reinforcing Bar
23KW
W
elding
T
emplate
2.2KW
Processing
T
emplate
4.5KW
Processing
Backfilling and
3KW
T
amping
1.5KW
Drainage
3KW
Drainage
Electromechanical
2.2KW
Installation
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
Electric Hammer
Electric Lighting
Bench
Drill
Cutting Machine
Beveling Machine
Electric
Pipe
Threading Machine
Slurry Balance Push
Bench
Double Stroke Push
Action Cylinder
Hydraulic
Power
Station
Electric
Engine
Oil Pump
Grouting
Pipeline
Equipment
泥水管路设备
Slurry
Pipeline
Equipment
Hydraulic
Grouting
Pump
Smooth Drum
Roller
Vibratory Roller
Three-Axle Paving
Machine
Generator
8
8
4
4
6
2
2
4
4
2010
2010
2010
2010
2010
2009
2009
2009
2009
2009
2009
2009
2009
2011
2011
2011
2011
Old
Old
Old
Old
Old
Old
Old
Old
Old
Old
Old
Old
Old
Old
Old
Old
Old
O
O
O
O
O
L
L
L
L
L
L
L
L
O
O
O
O
0.1
0.56
1.2
0.65
0.15
54
86
0.16
0.56
0.75K
W
0.75K
W
1.1KW
3.2KW
0.9KW
120
212
86
16
25
28
31
9.3
7.5KW
315KV
A
15t
18-21t
Electromechanical
Installation
Electromechanical
Installation
Electromechanical
Installation
Electromechanical
Installation
Electromechanical
Installation
Pipe Jacking
Pipe Jacking
Pipe Jacking
Pipe Jacking
Pipe Jacking
Pipe Jacking
Pipe Jacking
Pipe Jacking
District road base
course
District road
base
course
District road
base
course
T
emporary Power
Supply
Note: The
bidder shall put his plan into the table of major
construction machinery at the construction
site, including owned machinery and
leased machinery
.
- - 12 - -C:iknowdocsharedatacur_
T
able II. Major Personnel
Name
(i)
Designated Person
(ii) Backup Personnel
Qualification,
Experience, and
Current Position
Headquarter Personnel
Construction Site Personnel
Other Personnel
Liu Bin
Han Haoping
Jiang
Y
anrong
Liu Ping
W
ang Ying
Zhu
Minjian
Chen Y
an
Project Manager
T
echnical Director
Builder Technician
Quality
Inspector
Cost Engineer
Safety Inspector
Material
Inspector
Note:
1.
Personnel
requirement: for detailed information, please
refer to
the third term of ―Information
for
the Bidder.‖
2.
The personnel
filled in this tender must be on site before the
construction starts. During the course
of the project, the table cannot be
altered without the permission of the supervision
engineer. If the
alteration is
necessary
, the alteration shall be made
after the work experience and qualifications of
the substitutes are submitted to and
approved by the supervision engineer.
3.
Major
personnel on site shall submit their personal
resumes (T
able II-1) and
certifications.
4.
Project managers participating in the
project shall not work in other projects at the
same time,
otherwise the tender will be
abandoned.
- - 13 -
-C:iknowdocsharedatacur_
Principal
Personnel Resume
Name
Professional
Title
School of
Graduation
Liu Bin
Senior
Engineer
Hohai
University
Age
46
Major
Port and
W
aterway
Deputy
Position
General
Manager
Certificate
First-Class
Name
Architect
Experiences
Participated In
Position in
this
Project Manager
contract project
Certificate
Number
Su
0
Y
ear
–
Y
ear
Position
Remark
September, 2008~April, 2009
47th
Bid
of
W
ater
Diversion
and
W
ater
Quality
Environmental
Engineering
in
Changsha Province
December,
2009~October,
2010
First-
Stage
Project
of
W
estern
Sewage
Treatment Plant in W
enzhou
City
Project
Manager
Project
Manager
Project
Manager
February
, 2011~March, 2012
10th
Bid
of
Sewage
Pipeline
Network
Reconstruction
Project
of
Langfang
City
(Urban Area)
-
-
-
-
-
-
-
-
-