TECHNICAL SPECIFICATIONS FOR
INSTALLATION OF MECHNICAL
EQUIPMENT
1
1.1
HIGHLIGHTS OF CONSTRUCTION
Construction preconditions of Equipment
Installation
The design
document and other technical documents are all
ready, the construction
drawings
have
been
jointly
checked
up,
technique
clarification
and
necessary
technical training shall have
been
accomplished.
Relative foundation and trench work
shall have been finished
,
the
concrete strength
shall not be lower
than 75% of design strength.
1.2
1.2.1
Acceptance of Equipment Foundation
Acceptance of Civil Data
Quality certificate.
Survey
Record and other construction data shall be ready.
1.2.2
Foundation checking
The
position,
geometry
dimension
and
quality
requirements
of
the
equipment
foundation
shall
comply
with
the
construction
drawings
and
the
Code
for
Construction and
Acceptance of Concrete Structures (GB50204-92).
Both the foundation surface of the
equipment and the reserved holes of anchor bolts
shall be cleaned up, the screw thread
and the nut of the embedded
anchor bolt shall
be kept in
good condition.
The allowable tolerance
of equipment foundation dimensions refer to table
1:
Table 1
Items
Allowable Tolerance (mm)
Coordinate position (Longitudinal &
transverse)
Elevation of
different plane
Plane outline dimension
Plane outline dimension of protruding
platform
Dimension of concave hole
Levelness of plane
(Including parts where equipment
would be installed on the level
ground)
Total length
Per meter
Plumbness
Total length
Elevation (top)
Center-to-center
Embedded
anchor bolt
(
from the top to
the
bottom)
Central position
Depth
Embedded anchor bolt hole
Plumbness of the
internal
surface of
the hole per meter
Elevation
Embedded anchor
bolt active
anchor plate
Central position
Levelness
(anchor
board with slot) per
meter
Per meter
±
20
-
20
±
20
-
20
+
20
5
10
5
10
+
20
±
2
±
10
+
20
10
+
20
±
5
5
Levelness (anchor
board with screw
threaded
hole)
per meter
1.3
Unpacking Inspection of Equipment
Unpacking inspection of equipment shall
be executed under the supervision
of
the
Owner
’
s
personnel, Contractor shall inspect the following
items:
Appearance , quantity,
specification and model of the equipment
Packing list and other
technical dada.
During the inspection
Contractor shall keep all the records.
Equipment , spare parts and special
tools shall be carefully kept.
1.4
1.4.1
Installation of Equipment
Positioning and Aligning of Equipment
The baseline of installation shall be
designated accord with construction drawing and
relating axis, edge line or elevation
line before equipment positioning.
The
allowable
tolerance
of
of
the
distance
from
plane
installation
bench
mark
to
actual foundation axis or between
actual shop wall axis and edge line is
±
20mm.
Refer to
Table
2 for
the
allowable
tolerance
of plane
position
and
elevation
of
the
positioning plane, line
or point to bench mark:
Table2
Allowable
Tolerance (mm)
Items
Plane
position
Without mechanical relations
with other
equipment
With
mechanical relations with other
equipment
Elevation
+
20
±
10
-
10
±
2
±
1
2
-
-
-
-
-
-
-
-
-