TECHNICAL SPECIFICATIONS FOR



INSTALLATION OF MECHNICAL EQUIPMENT



1


1.1


HIGHLIGHTS OF CONSTRUCTION


Construction preconditions of Equipment Installation



The design document and other technical documents are all ready, the construction


drawings


have


been


jointly


checked


up,


technique


clarification



and



necessary


technical training shall have been


accomplished.



Relative foundation and trench work shall have been finished



the concrete strength


shall not be lower than 75% of design strength.




1.2


1.2.1


Acceptance of Equipment Foundation


Acceptance of Civil Data


Quality certificate.


Survey Record and other construction data shall be ready.


1.2.2


Foundation checking


The


position,


geometry


dimension


and


quality


requirements


of


the


equipment


foundation


shall


comply


with


the


construction


drawings


and


the


Code


for


Construction and Acceptance of Concrete Structures (GB50204-92).


Both the foundation surface of the equipment and the reserved holes of anchor bolts


shall be cleaned up, the screw thread and the nut of the embedded



anchor bolt shall


be kept in good condition.


The allowable tolerance of equipment foundation dimensions refer to table 1:


Table 1


Items


Allowable Tolerance (mm)


Coordinate position (Longitudinal & transverse)



Elevation of different plane


Plane outline dimension


Plane outline dimension of protruding platform


Dimension of concave hole


Levelness of plane


(Including parts where equipment


would be installed on the level


ground)


Total length


Per meter


Plumbness


Total length


Elevation (top)


Center-to-center


Embedded anchor bolt



from the top to the


bottom)



Central position


Depth


Embedded anchor bolt hole


Plumbness of the


internal surface of


the hole per meter


Elevation


Embedded anchor bolt active


anchor plate


Central position


Levelness (anchor


board with slot) per


meter


Per meter



±


20



20


±


20



20



20


5



10


5


10



20


±


2


±


10



20


10



20


±


5


5


Levelness (anchor


board with screw


threaded hole)


per meter


1.3


Unpacking Inspection of Equipment


Unpacking inspection of equipment shall be executed under the supervision


of the


Owner



s personnel, Contractor shall inspect the following items:


Appearance , quantity, specification and model of the equipment



Packing list and other technical dada.


During the inspection Contractor shall keep all the records.


Equipment , spare parts and special tools shall be carefully kept.



1.4


1.4.1


Installation of Equipment


Positioning and Aligning of Equipment


The baseline of installation shall be designated accord with construction drawing and


relating axis, edge line or elevation line before equipment positioning.


The


allowable


tolerance


of


of


the


distance


from


plane


installation


bench


mark


to


actual foundation axis or between actual shop wall axis and edge line is


±


20mm.


Refer to Table


2 for


the


allowable


tolerance


of plane


position


and


elevation


of


the


positioning plane, line or point to bench mark:





























Table2


Allowable Tolerance (mm)


Items


Plane position


Without mechanical relations with other


equipment


With mechanical relations with other


equipment


Elevation



20


±


10



10


±


2


±


1