建筑装饰工程施工合同示范文本
Contract for Decoration Project
Party A (full name):
Party B (full name):
This
Contract
is
concluded
on
the
basis
of
the
project
details
by
and
between
the
foresaid Party A and
Party B in accordance with
Contract Law
of People’s Republic of
China
and
Construction Engineering Contract
Regulations
.
1. Overview
1.1
Project name:
1.2
Project site:
1.3
Project content:
1.4
Means of contract:
1.5
Construction
Period
is
from
date
of
commence
of
,
to
completion
date
of
.
1.6
Quality standard:
1.7
Contract
price:
2. Party
A
’
s
Responsibilities
2.1
Party A shall provide
copy of confirmed
construction drawings or instructions to
Party B
Days prior to the date of commence,
clear up all or parts of the buildings, and
remove barriers. Party A will take
protective measures for the remaining furniture
and
furnishings. Party A also needs to
provide water, electricity, gas and
telecommunications,
and indicate
matters needing attention to Party B. Party A will
be responsible for going
through all
the applications and approval procedures related
to the project.
2.2
Party A assigns
to be the
representative. He will be responsible for
the
supervision
and
control
over
the
project,
and
handle
the
acceptance,
alteration,
registration formalities.
2.3
Party
A
entrusts
with
the
construction
supervision
of
this
project.
The
supervision company appoints
to
be the general supervision engineer, clarifies
his
responsibilities
in
the
supervision
contract,
and
submits
copy
of
the
contract
to
Party B.
页脚内容
1
建筑装饰工程施工合同示范文本
2.4
Party A shall be
responsible for protecting the surrounding
buildings, equipments,
pipelines, trees
and landscaping from being damaged, and bear
corresponding costs.
2.5
If it is really
necessary to change the original building
structure or pipelines, Party A
shall
be responsible for going through the corresponding
approval procedures.
2.6
Party
A
will
coordinate
with
relevant
departments
to
do
on-site
security,
fire
protection, waste
disposal, etc., and bear the corresponding
costs.
3. Party
B
’
s
Responsibilities
3.1
Party
B
must
be
available
to
attend
meetings
organized
by
Party
A
and
prepare
construction plan
and schedule.
3.2
Party B assigns
as the site resident
representative. He will be responsible
for construction organization and
completion of the project with good
quality.
3.3
Party
B
shall
strictly
implement
the
construction
specifications,
safety
operation
procedures,
fire
safety
regulations,
and
environmental
protection
regulations.
It
must strictly execute construction
abiding by
construction
drawings
or
practice
instructions, and
complete the quality inspection record. Party B
must participate in the
final
completion acceptance, and prepare the project
settlement.
3.4
Party B must abide by the provisions on the
management of the construction sites
by
the national or local government and related
departments, protect the
surrounding
buildings,
equipments,
pipelines,
trees
and
landscaping
from
being
damaged.
Party
B
also need to do a good job in such
things as the construction site security and
garbage
disposal,
and
deal
well
with
the
issue
of
disturbing
residents
brought
about
by
construction.
3.5
Without Party A's
consent or approval of relevant departments, Party
B shall not
make any unauthorized
changes to original building structure or
pipelines.
3.6
Party
B
shall
be
responsible
for
protecting
all
the
facilities
and
finished
projects
before the project is handed over to
Party A.
4.
Construction Period
4.1
When
Party
A
needs
to
complete
the
project
ahead
of
the
time
limit,
it
should
obtain
Party B's agreement and pay the cost for the
measures that Party B takes to crash
the schedule.
4.2
If
the
project
progress
is
influenced
by
the
delay
of
Party
A's
delivery
date,
the
practically impacted
cycle extends accordingly.
4.3
If
the
project
can
not
be
started
on
time
or
shutdown
halfway
for
no
reason
because
of
Party
B's
responsibility,
the
practically
impacted
cycle
can
not
extend
accordingly.
页脚内容
2
建筑装饰工程施工合同示范文本
4.4
The project duration
shall be prolonged when the downtime is over eight
hours
(accumulated in one week) caused
by the power failure, water failure, gas stop and
force
majeure factors because of design
changes or reasons not related to Party B.
5. Quality
Standard and Acceptance Inspection
5.1
This project takes
construction drawings, instructions, design
changes and national
construction
and
acceptance
specifications
such
as
Construction
and
Acceptance
Standards of Decoration Engineering
(JGJ73-91)
,
Unified Quality
Inspection and Assessment
of
Architectural
Installation
Work
(GBJ300-88)
as
quality
assessment
and
acceptance
standards.
5.2
Quality
of
the
project
should
meet
the
acceptance
criterion
of
national
quality
assessment. If all
or parts of the project reach to the excellent
standard, Party A will pay
to Party B
increased costs.
5.3
Party
A
and
Party
B
shall
promptly
handle
the
concealed
work
inspection
procedures
of
pre-acceptance
in
the
middle
of
the
project.
If
Party
A
do
not
organize
covert acceptance in time, Party B can
make self-inspection and Party A shall admit the
result.
If
Party
A
requires
the
re-inspection,
Party
B
shall
be
in
accordance
with
the
requirements for the re-inspection. If
the re-inspection result is acceptable, Party A
shall
bear
the
re-inspection
fee
and
the
project
duration
can
be
extended
accordingly;
if
re-inspection
result
is
not
acceptable,
the
re-inspection
and
reworking
costs
shall
be
borne by
Party B, and the project duration shall also be
extended accordingly.
5.4
If materials provided by
Party A for
the construction do not
meet the necessary
requirements, Party
A shall bear responsibility for any resulting
delays in the completion
of the
project.
5.5
If
the quality of Party B's work results in any
accidents, liability for such accidents
shall be borne by Party B.
5.6
When the Project is
ready for final acceptance, Party B shall submit
to Party A the
full
as-built
documentations
and
completion
acceptance
report.
Party
A
shall
organize
the
acceptance
within
5
day
after
receiving
all
the
documents.
When
Party
A
can
not
conduct the acceptance
within the time specified in the Contract, Party A
shall inform
Party B without delay and
determine another date for the acceptance. Party
A, however,
shall admit the completion
date of the Decoration Project and be liable for
the expenses
for taking care of the
construction by Party B and other relevant
expenses.
6.
Contract Prices & Settlement
6.1
The Parties agree to
determine the contract price pursuant to mode
below:
(1)
Fixed price
(2) Fixed price,
combined with
/
% risk rate (including
/
)
(3)
Adjustable
price:
make
adjustments
and
settlement
according
to
relevant
state
regulations