Contract for Decoration Project
Party A (full name):
Party B (full name):
This Contract is concluded
on the basis of the project details by and between
the foresaid
Party
A
and
Party
B
in
accordance
with
Contract
Law
of
People’s
Republic
of
China
and
Construction Engineering Contract
Regulations
.
1.
Overview
1.1
Project
name:
1.2
Project
site:
1.3
Project content:
1.4
Means of contract:
1.5
Construction Period is from date of
commence of
,
to completion date of
.
1.6
Quality standard:
1.7
Contract price:
2. Party
A
’
s Responsibilities
2.1
Party A shall provide
copy of
confirmed construction drawings or instructions to
Party
B
Days
prior
to
the
date
of
commence,
clear
up
all
or
parts
of
the
buildings,
and
remove
barriers. Party A
will take protective measures for the remaining
furniture and furnishings. Party
A
also
needs
to
provide
water,
electricity,
gas
and
telecommunications,
and
indicate
matters
needing attention to
Party B. Party A will be responsible for going
through all the applications and
approval procedures related to the
project.
2.2
Party
A
assigns
to
be
the
representative.
He
will
be
responsible
for
the
supervision
and
control
over
the
project,
and
handle
the
acceptance,
alteration,
registration
formalities.
2.3
Party
A
entrusts
with
the
construction
supervision
of
this
project.
The
supervision
company
appoints
to
be
the
general
supervision
engineer,
clarifies
his
responsibilities in the supervision
contract, and submits
copy of the contract to Party B.
2.4
Party
A
shall
be
responsible
for
protecting
the
surrounding
buildings,
equipments,
pipelines, trees
and landscaping from being damaged, and bear
corresponding costs.
2.5
If
it is really necessary to change the original
building structure or pipelines, Party A shall
be responsible for going through the
corresponding approval procedures.
2.6
Party A will coordinate
with relevant departments to do on-site security,
fire protection,
waste disposal, etc.,
and bear the corresponding costs.
3. Party B
’
s
Responsibilities
3.1
Party
B
must be available to
attend meetings organized by Party A and prepare
construction
plan and
schedule.
3.2
Party B assigns
as the site resident
representative. He will be responsible for
construction organization and
completion of the project with good quality.
3.3
Party
B
shall
strictly
implement
the
construction
specifications,
safety
operation
procedures,
fire
safety
regulations,
and
environmental
protection
regulations.
It
must
strictly
execute
construction
abiding
by
construction
drawings
or
practice
instructions,
and
complete
the
quality
inspection
record.
Party
B
must
participate
in
the
final
completion acceptance, and prepare the
project settlement.
3.4
Party B must abide by the provisions on the
management of the construction sites by the
national
or
local
government
and
related
departments,
protect
the
surrounding
buildings,
equipments,
pipelines,
trees
and
landscaping
from
being
damaged.
Party
B
also
need
to
do
a
good job in such things as
the construction site security and garbage
disposal, and deal well with
the issue
of disturbing residents brought about by
construction.
3.5
Without
Party A's consent or approval of relevant
departments, Party B shall not make
any
unauthorized changes to original building
structure or pipelines.
3.6
Party B shall be responsible for protecting all
the facilities and finished projects before
the project is handed over to Party A.
4. Construction Period
4.1
When Party A needs to
complete the project ahead of the time limit, it
should obtain
Party B's agreement and
pay the cost for the measures that Party B takes
to crash the schedule.
4.2
If the project progress is influenced
by the delay of Party A's delivery date, the
practically
impacted cycle extends
accordingly.
4.3
If the
project can not be started on time or shutdown
halfway for no reason because of
Party
B's responsibility, the practically impacted cycle
can not extend accordingly.
4.4
The
project
duration
shall
be
prolonged
when
the
downtime
is
over
eight
hours
(accumulated in one week) caused by the
power failure, water failure, gas stop and force
majeure
factors because of design
changes or reasons not related to Party B.
5. Quality
Standard and Acceptance Inspection
5.1
This
project
takes
construction
drawings,
instructions,
design
changes
and
national
construction
and
acceptance
specifications
such
as
Construction
and
Acceptance
Standards
of
Decoration
Engineering
(JGJ73-91)
,
Unified
Quality
Inspection
and
Assessment
of
Architectural
Installation
Work (GBJ300-88)
as quality assessment
and acceptance standards.
5.2
Quality
of
the
project
should
meet
the
acceptance
criterion
of
national
quality
assessment.
If
all
or
parts
of
the
project
reach
to
the
excellent
standard,
Party
A
will
pay
to Party B increased costs.
5.3
Party A and Party B
shall promptly handle the concealed work
inspection procedures of
pre-acceptance
in the middle of the project. If Party A do not
organize covert acceptance in time,
Party
B
can
make
self-inspection
and
Party
A
shall
admit
the
result.
If
Party
A
requires
the
re-inspection, Party B shall be in
accordance with the requirements for the re-
inspection. If the
re-inspection
result
is
acceptable,
Party
A
shall
bear
the
re-inspection
fee
and
the
project
duration can be
extended accordingly; if re-inspection result is
not acceptable, the re-inspection
and
reworking costs shall be borne by Party B, and the
project duration shall also be extended
accordingly.
5.4
If
materials
provided
by
Party
A
for
the
construction
do
not
meet
the
necessary
requirements,
Party A shall bear responsibility for any
resulting delays in the completion of the
project.
5.5
If
the quality of Party B's work results in any
accidents, liability for such accidents shall
be borne by Party B.
5.6
When the Project is ready for final
acceptance, Party B shall submit to Party A the
full
as-built
documentations
and
completion
acceptance
report.
Party
A
shall
organize
the
acceptance
within
5
day
after
receiving
all
the
documents.
When
Party
A
can
not conduct
the
acceptance within the time specified in
the Contract, Party A shall inform Party B without
delay
and
determine
another
date
for
the
acceptance.
Party
A,
however,
shall
admit
the
completion
date of the
Decoration Project and be liable for the expenses
for taking care of the construction
by
Party B and other relevant expenses.
6. Contract Prices & Settlement
6.1
The Parties agree to
determine the contract price pursuant to mode
below:
(1) Fixed price
(2) Fixed price, combined with
/
%
risk rate (including
/
)
(3)
Adjustable
price:
make
adjustments
and
settlement
according
to
relevant
state
regulations