PLC应用英文资料

作者:高考题库网
来源:https://www.bjmy2z.cn/gaokao
2021-02-05 21:43
tags:

-

2021年2月5日发(作者:staccato)



PLC in the Ice Storage Central Air-conditioning


System of Control


1 Introduction


Ice


storage


air-conditioning


is


the


Central


V


alley


will


be


redundant


power


grid


electricity


at


night


to


form


ice


cold


storage,


electricity


consumption


peak


during


the


day


when


the


ice


will


melt


to


provide


air- conditioning


services.


As


in


most


parts


of


China's electricity at


night


is


much


lower


than during the day


,


using


ice cold storage


central air conditioning can significantly reduce the user's operating costs.






Ice


storage


central


air-conditioning


system


configuration


of


equipment


than


conventional


air- conditioning


system


to


increase


the


number


and


require


a


higher


degree


of


automation,


but


it


automatically


to


meet


the


requirements


of


the


air-conditioned buildings throughout the day


under


the conditions of the day will


be


with all the energy spent, the largest At least to save operating costs.


2 Control system.


Control


system


from


the


next


crew


(the


scene


control


workstations)


and


PC


(central


management


workstations),


with


the


crew


using


programmable


logic


controller


(PLC) and


touch screen, PC using


industrial-grade computers and printers,


system


configuration


necessary


if


the


annex


Communications


equipment


interface


cards,


modems,


etc.,


to


achieve


the


parameters


of


the


storage


system


and


automatic


intelligent run.




The


crew


at


the


scene


and


touch-screen


system


can


control


parameter


settings


and


data.


PC


remote


management


and


printing,


which


includes


the


crew


and


all


the


features touch screen. Following the system as a whole crew of


the


industrial PLC as


the


core,


the


automated


control.


Control


equipment


and


devices


include:


detection


sensor components, electrical valves, converter, and so on.



1



2.1 Under the machine system (Regional workstations)




2.1.1 TP21 touch-screen




TP27


used


as


a


color


touch-screen


operation


panel,


completely


replace


the


conventional


switch


button,


light,


and


other


devices


to


control


more


interviews


counters


clean.


And,


TP27


touch


screen


can


be


realized


at


the


scene


state,


system


settings,


the


model


chosen,


the


set


of


parameters,


fault


recording,


load


records,


time


period,


real-time


data,


load


curve


and


reporting


statistics,


and


other


functions,


the


Chinese user interface intuitive and friendly


.



2.1.2 SIEMENS PLC




SIMATIC S7-300 series PLC applied to all walks of life and various occasions in


the detection, monitoring and control of automation, its power to both the independent


operation of, or connected to a network able to achieve complex control.




The


photoelectric


products


with


isolation,


high


electromagnetic


compatibility;


have


high


industrial


applicability,


allowing


the


ambient


temperature


of


60



;


has


strong


anti-jamming


and


anti-vibration


and


impact


resistance,


so


in


a


harsh


working


environment has been widely Applications.




I also mean freedom of communication S7-300 type PLC' s a very unique feature,


which allows S7-300-PLC can deal openly with any other communications equipment,


communications


controller,


or


PLC


S7-300


type


can


be


defined


by


the


user's


own


Communications


protocol


(of


the


agreement


ASCII),


the


baud


rate


to


1.5


Mbit


/


s


(adjustable).


So


that


can


greatly


increase


the


scope


of


communications


so


that


the


control


system configuration


more


flexible and convenient. Of any kind with a


serial


interface peripherals, such as: printers or bar code readers, Drives, a modem (Modem),


the


top


PC-connected,


and


so


can


be


used.


Users


can


program


to


develop


communication protocols, the exchange of data (for example:


ASCII character code),


RS232


interfaces


with the equipment can also be


used PC / PPI cable


linking the free


communication communications.



2




When


the


PC


offline,


under


the


control


of


the


next


crew,


the


whole


system


can


operate normally.



2.2 Computer System (central management workstations)



2.2.1 PC




PC


that


is


by


control


centre,


mainly


by


the


PC


and


laser


printer


components,


using


SIMA


TIC


WINCC


software


platform,


the


all-Chinese


interface,


friendly


man-machine dialogue. Managers and operators can be observed through a PC, shown


in


the


various kinds of


information


to


understand the present and past


the


ice-storage


operation


of


the


automatic


control


system


and


all


the


parameters,


and


through


the


mouse to print equipment management and implementation tasks.



2.2.2 WINCC software platform






WINC


C


software


in


the


field


of


automation


can


be


used


for


all


the


operators’


control


and


monitoring


tasks.


Can


be


controlled


in


the


process


of


the


events


clearly


show, and shows the current status


and order


records, the


recorded data can show all


or


select


summary


form,


or


may


be


required


for


editing,


printing


and


output


statements and trends .






WINCC able to control


the critical situation


in


the early


stages of


the report, and


the signal can be displayed on the screen, can also


use sound


to be


felt. It supported


by online


help and operational


guidelines to eliminate


failure. WINCC a workstation


can be devoted to the process control


to the process so that


important


information


not


is


shielded.


Software-assisted


operation


strategy


ensures


that


the


process


was


not


illegal to visit and to provide for non-industrial environment in the wrong operation.



WINCC is MICRSOFT WINDOWS98 or


WINDOWS NT4.0 operating system,


running


on


a


PC



object- oriented


class


32-bit


applications,


OLE


through


the


window


and


ODBC


standard


mechanism,


as


an


ideal


partner


to


enter


the


communications


world


WINDOWS,


it


can


be


easily


WINCC


To


integrate


a


company-wide


data


processing system.



3



3 The control of ice storage system


3.1 control objectives, scope and mainly controlled equipment






Storage


control


system


control


Objective:


To


host


the


refrigeration,


ice


storage


devices, plate heat exchanger, and the system pumps, cooling


towers, pipeline control


valve


system


to


control


and


adjust


ice


storage


system


of


the


status


of


the


operation


mode, in the most economical Circumstances to the terminal to provide a stable water


temperature.


At


the


same


time,


improve


the


level


of


automation


and


improve


the


management efficiency and reduce management labor intensity


.



Control of the entire


ice storage systems,


including the parameters of state, state


and


control


equipment,


the


main


control


equipment


are:


the


status


of


host


duplex,


electrical


valves,


cooling


towers,


cooling


pumps,


ice


storage


devices,


the


primary


glycol pump, plate heat exchanger, and Sub-glycol pumps.



3.2 control



Control


features


include


the


entire


ice


storage


system


stability


,


economic


operation with the features.



3.2.1 Condition conversion feature






According


to


the


season


and


operation


of


machinery


,


automatic


control


system


with the following conditions conversion features:






a) duplex


host status at the same


time cooling


ice-making


mode; b) duplex


host


the status of a separate


ice-making


mode; c) host and the cooling


mode of


ice storage


devices; d) the ice-melting separate cooling mode; e) alone for the host Cold mode.



3.2.2 The status of Commitment, display and fault alarm functions



Control


system


according


to


the


schedule


in


chronological


order,


with


load


forecasting


software,


host


and


external


control


refrigeratio


n


equipment


and


the


number of start and stop all surveillance equipment, working conditions and operating


parameters,


such


as:


-


refrigeration


host


Commitment,


status


and


fault


alarm


-


host


refrigeration


Operating


parameters


-


host


of


dry


cooling


protection


-


host


for


4



refrigeration/return water temperature, pressure, telemetry and display; - chilled water


pumps start and stop, status and


fault alarm -


glycol pump start and stop, status and


fault


alarm


-


cooling


Pump


Commitment,


status


and


fault


alarm-the


pressure


of


the


bypass


with


significant


pressure


measurement



Show- the


cooling


tower


fan


Commitment, status and fault alarm;




For cooling tower/backwater temperature control and display - for / return water


temperature, pressure remote control and display - the


import and export side of plate


heat exchanger temperature control and display -


into the


ice


storage devices, export


control


and


temperature


telemetry


Show


-


chilled


water


flow


control


and


display


backwater - electric


valve switch, regulating


valve and-control and display - outdoor


temperature


and


humidity


control


and


display


telemetry


-


ice


storage


and


display


of


measurement - the end of cooling load control.



3.2.3 Data recording and printing






Control system on some points need to monitor the trend recorded throughout the


year;


the


entire


control


system


can


be


in


the


load


(including


the


biggest


daily


total


load


and


full-load)


and


equipment


uptime


tables


and


charts


to


record


for


users.


All


monitoring points and the calculation of the data can be automatically print regularly


.



3.2.4 Manual / automatic conversion feature




Control


system


configuration


flexibility


of


manual


/


automatic


conversion


features.



3.2.5 Optimized control






According to outdoor


temperature, weather,


the


weather


trend,


history and other


data automatically host the ice-melting or priority


. Meet the load in the end, under the


premise of daily End of cold storage, to run as little as possible hosts. Give full play to


advantages of ice cold storage system, saving operating costs.



3.2.6 Features automatic operation




From


the


host


computer


system


can


work,


according


to


a


timetable


for


the


5



automatic


ice-making


and


control


system


operation,


the


status


of


conversion,


the


system


for automatic


fault diagnosis, and remote alarm. Touch-screen display system


running, processes, the parameters of nodes, running records, police records.



3.2.7 Holidays set features






According


to


the


timetable


system


can


be


run


automatically


,


but


also


can


be


pre-set


holidays,


ice


control


certificates


and


certificates


of


ice


time,


the


system


does


not


need


the


holiday


season,


when


the


supply


of


places


to


stop


air-conditioning


cooling.



3.2. 8 Under the crew operating functions



The crew operating functions are as follows:



a)


man- machine


dialogue.


The


operator


through


the


touch


panel


can


be


interactive,


user


interface


completely


in


the


culture,


with


tips,


help,


and


the


set


of


parameters,


key


settings,


fault


enquiries,


history


,


and


other


functions.



b)


System


settings.


Including


the


operation


of


password


settings,


running


set


up,


run


the


timetable


set


records


overflow


with


automatic


/


manual


/


test


selection,


holiday


settings,


the


system


set


of


parameters


(including


the


node


temperature,


pressure,


the


flow


of


the


medium,


the


reservoir


of


ice,


ice-making


Rate,


the


ice-melting


rate,


the


valve


open,


end


load,


and


so


on.) .c)


Record


of


failure,


running


records,


historical


records.



3.3 Remote Control




Control


system


through


telephone


lines


or


broadband,


connections


with


the


expert


system,


the


system


operational


control,


parameter


changes,


such


as


data


collection,


the


system


continuously


improved


and


upgraded


version


of


the


software,


allows users to get better service. Remote Control is aimed at users through the PSTN


(public


switched


network


transmission)


of


frozen


remote


monitoring


station


at


different


places.


At


the


same


time


can


achieve


long-range


adjustment,


remote


monitoring and timely maintenance, and other online, thus greatly reduce the intensity


6

-


-


-


-


-


-


-


-