合同号:
BG170005
Agreement
number: BG170005
钢材订货合同
Steel Purchase Agreement
工程名程:巴基斯坦信德省塔尔煤矿
II
区块燃煤电站
工程
Project Name: Thar Block
II
2х330MW Coal Fired
power
Project Sindh
Province
Pakistan
甲方
:
Party A
:
乙
方
:
Party
B
:
签订地点:巴基斯坦
Signed
at: Pakistan
日期:
2017
年
3
月
20
日
DATE
:
March 20,
2017
钢材订货合同
Steel
Purchase Agreement
合同编号:
BG170005
Agreement number: BG170005
甲方:
乙方:
Party A:
Party B:
NTN:
1.
订货明细及合同价格
1. Details of Goods and
Agreement price
1.1
物资名称、规格、单位、数量、单价、总价、执行标准等见下表:
1.1
Goods
name,
specification,
unit,
quantity,
unit
price,
total
price,
and
executive
standard .etc:
No.
1
2
3
4
5
Material Name
Square Steel
Pipe
Square Steel
Pipe
Seamless Pipe
Welded Pipe
Acid proof
abestes rope
Specification
and
model
Quantity
Unit
Unit price
(rupee)
Total
Executive
standard
Remark
s
40*40*4
20*20*2
133*5.5
159*4.5
φ
32
200
100
24
62
2442
m
m
m
m
m
Total
Rs.
1.2
合同价格
Agreement
Price
1.2.1
本合同为总价合同,支付金额以实际到货为准。
This
contract
is
a
lump-sum
contract.
The
payment
amount
shall
be
subject
to
the
actual
delivered quantity of Goods.
1.2.2
合同单价包括乙方将本合同货物送达甲方指定地点
的全部费用(包括但不限于
运费及各种税费)
。合同单价在合同
有效期内不变,结算数量以实际验收数量为准。
The
unit price of the Agreement shall include all the
cost of the Goods delivered by Party B
to the place designated by Party A
(including but not limited to freight, all kinds
of taxes and
charges).
The
unit
price
shall
not
be
changed
during
the
Agreement
period.
The
settlement
amount shall be subject to the actually
inspected and accepted quantity of Goods.
1.2.3
卸车由甲方负责,费用自理。
Party A is responsible for unloading at
its own cost.
2.
交货方式、地点
2. Type,
Time and Place of Delivery
2.1
交货方式:乙方负责将货物运到甲方指定的施工现场特定地点。
Delivery type:
Party B shall
deliver the Goods to
certain
place on
the
Site
designated by
Party A.
甲方联系人:爱
Contact
person of Party A:
2.2
交货地点:
Delivery place:
3
、技术标准及质量要求
Technique Standards and Quality
Requirements
3.1
、执行标准:参照条款
p>
1.1
;
Executive standard: contract clause
1.1;
3.2
、货物到达现场时应随车携带以下资料:送货
清单、并负责提供必要的材料质量证
明资料,例如出厂报告或第三方检测报告。
When the Goods are delivered to
the Site, the following should be delivered
concurrently:
the
delivery
list
and
some
necessary
quality
document
about
the
materials
s
supplied,
such
as
manufacturer’s report or the
third party lab. testing report.
3.3
、经验收的不合格的材料,乙方应负责及时清除出场,费用自理,甲方
对该等不合
格的材料不予确认计量。
Party B shall be responsible for
clearing all the unqualified Goods out of the Site
at its own
cost and expenses, and Party
A will not confirm and measure such unqualified
Goods.
4
、付款
Payment
4.1
、付款条件:乙方依据验收数量及每批采购单价开具发票。付款按每
10<
/p>
,
000
,
00
0
卢比付一次或
30
天结。
Payment
Terms:
Party
B
shall
issue
an
invoice
according
to
the
accepted
quantity
and
-
-
-
-
-
-
-
-
-