unisex-umr
钻井作业英语
100
句
DRILLING OPERATION ENGLISH 100
1
、
钻机已安装完毕。
The
rigging up is finished.
2
、
现在开始检查和调试钻机。
Let's start to check and test
the rig.
钻机还没检查调试呢。
The
rig isn't checked and tested.
3
、
所有操作都应该按正规程序进行。
All the operation should be done
per normal procedures.
4
、不戴安全帽不许上钻台工作。
It is not allowed to work on
the rig floor without helmet on.
5
、上井架工作必须系好安全带。
The safety belt should be
fastened when working on the derrick..
你系好安全带了吗?
Has you safety belt been
fastened?
6
、上班前不许喝酒。
Wine drinking is not allowed
before going to work.
7
、大
约下午
1:00
可以开钻。
Spud in will begin at about
one o'clock in the afternoon.
8
、一开采用钻速
160
,钻压
< br>2
千磅。
For
the first spud in ,penetration rate is 160
and weight on
the
bit is
two thousand pounds.
钻速多大?
What is
the penetration rate?
钻压不到二千磅。
The
weight on the bit is less than two
thousand pounds.
9
、开双泵,泵冲<
/p>
100
,泵压
6
兆帕。
Use both pumps
with 100 strokes per minute and pressure of
6
MPa.
开双泵吗?
Shall
we use both pumps ?
10
、打完
单根划眼一次,直到打完一开。
Do a
dummy trip after single joint drilling until
the first
spud in finished.
11
、循环一个半小时再起钻。
Circulate for one and half
hours before pulling out.
循环多长时间再起钻?
How long to circulate before pulling out?
不用循环。
No need to circulate.
12
、如有特殊情况,要马上报告。
Report at once if any unusual
case occurred.
13
、下钻要控制下放速度。
Control the running speed when
going in the hole.
14
、当心顿钻和伤人。
Be careful not to make free
fall and hurt anyone.
15
、如遇阻,不许硬压。
Don't force to run in with
too more weight for a tight hole.
遇阻了,怎么办?
What
can I do? The hole is getting tight.
16
、观察振动筛有无跑泥浆现象。
See if any mud overflow on the
screen.
振动筛跑泥浆了。
There is an overflow screen.
17
、现在需要马上换筛布。
We need to change the screen
at once.
1
要换筛布吗?
Is
the screen to be changed?
不用换筛布。
The
screen needn't changing.
18
、认真作好记录。
Record it carefully.
19
、不许作假资料。
Don't make false record.
这资料有假。
It's
a false record.
20
、每钻进
100
米测斜一次。
Do a deviation survey every
100metre interval.
钻多深测一次井斜?
What's
the interval between deviation surveys?
21
、勤活动钻具。
Move the drill string
frequently.
22
、将测斜结果及时汇报监督。
The result of deviation survey
has to informed to supervisor in
time.
已经将测斜结果报告监督了。
The
supervisor
has
already
been
informed
about
the
survey
result.
23
、扭矩不要过大。
Don't apply excessive torque.
扭矩太大。
The
torque is excessive.
24
、不许强提。
No forced pulling out is
allowed.
25
、已经提放多次,未见效果。
The string has been moved up
and down several times,but it
doesn't work.
26
、接方钻杆,倒划眼。
Connect kelly and do a
backreaming.
不要接方钻杆。
Don't connect the kelly.
27
、在钻杆上作卡点记号。
Make a mark for sticking point
on the drill pipe.
在钻杆上作卡点记号了吗?
Is the drill pipe marked for sticking
point.
28
、当心扭断钻具。
Be careful not to twist off
the drill string.
29
、未得到监督的许可,不许乱来。
Don't act at your disposal
without supervisor's consent.
我事先已得到监督的同意。
I've got the prior consent from supervisor
already.
30
、下钻时,不许用钻盘上扣。
Don't make up by rotary table
while running in.
下钻时,我从来不用钻盘上扣。
I've never made up by rotary table while
running in.
31
、用双钳紧扣。
Make up and tighten by both
tongs.
32
、对所有防范措施作一次检查。
Check all the precaution
measures.
检查完毕,未发现问题。
Check finished and no problem found.
33
、做一次防喷演习。
Do a blow out prevention
exercise.
34
、按深度,现在快接近油气层了。
2
It approaches the
pay zone based on depth.
根据深度,离油气层还远呢。
It is far away from the pay zone based on
depth.
35
、作好正常排量三分之一的泵压记录。
p>
Make a record of pump
pressure at one third of normal rate.
36
、作好压井准备。
Get ready to kill the well.
有必要压井吗?
Is it necessary to kill the
well.
37
、该更换刹车片了。
The brake blocks need to be
changed.
要换刹车片吗?
Need
the brake blocks to be changed?
38
、每起钻
20
柱,要核对泥浆的升降情
况。
Check the
fluctuation of mud level whenever 20 string
pulled
out.
有泥浆升降变化吗?
Is
there any fluctuation of mud level?
未见有升降变化。
No fluctuation found.
39
、这样下去,要扣你们的日费。
Your day rate will be
deducted in such a case.
为什么要扣日费?
Why
to deduct our day rate?
40
、日保养时间不得超过
15
分钟。
The daily maintenance will be
done for less than 15 minutes.
15
分钟之内做不完保养。
The maintenance can not be done within 15
minutes.
41
、现需加大钻压。
The weight on the bit has to
be increased now.
钻压加大了吗?
Has
the weight on the bit been increased?
42
、井下出现复杂情况,不要离开钻台。
There is some trouble in the
borehole. Don't leave the rig
floor.
43
、我们在等措施和检修设备。
We
are
waiting
for
the
completion
of
service
and
equipment
maintenance.
准备好,措施和检修已完成。
Get ready. The service and
maintenance have completed.
44
、将二开钻具下到水泥塞处。
Run the string for the second
spud in to the cement pulg.
等等,先不要下二开钻具。
Wait, do not run the string for the second
spud in now.
45
、井下已畅通无阻。
The borehole is in real good
shape.
井下情况怎么样?
How
is the borehole now?
46
、请帮我将泥浆罐清洗干净。
Please help me to clean the
mud tank.
47
、罐内放满水后,配泥浆。
Fill up the tank with water,
then prepare the mud.
罐里灌满水了吗?
Is
the tank filled up with the water?
罐里还没灌满水呢。
The tank isn't filled up with
water yet.
48
、安装井口时,上紧各螺丝。
Tighten all the screws when
installing the wellhead.
3
这个螺丝还没上紧。
This screw isn't tightened.
49
、看看井口有没有泄漏现象。
See if there is any leakage
on the wellhead.
井口上没有泄漏。
There is no leakage on the wellhead.
井口上有泄漏。
There is some leakage on the
wellhead.
50
、把这些工具整理好。
Put these tools in good
order.
51
、不要把这些工具放在这儿。
Don't put these tools here.
把这些工具放在这里。
Put these tools here.
52
、这台机器运转时有杂音。
There is a noise while this
machine is running.
这台机器运转时没有杂音。
There is no noise while this machine is
running.
这台机器运转时有杂音吗?
Is there any noise while this machine is
running?
53
、应当停车,检查原因。
We have to shut down it to
check the cause.
需要停车查原因吗?
Should we shut down it to check the cause?
54
、泵压忽高忽低,该怎么办?
The pump pressure is
fluctuating, what can I do?
55
、必须马上起钻,弄清楚怎么回事。
The string has to be pull out at once to
see what's wrong.
出什么事了?
4
What's wrong?
56
、现在下钻。
Run the string in the hole
now.
现在下钻了吗?
Shall we run the string in
the hole now?
57
、开始打循环。
Start the circulation.
开始打循环吗?
Shall we start the circulation?
先别开始。
Don't start now.
58
、接单根。
Make a connection.
接单根吗?
Shall
we make a connection.
59
、开始卸扣。
Start to break out the pipe.
开始卸扣吗?
Shall we start to break out
the pipe?
60
、先接好引鞋和套管鞋。
First, connect the guide shoe
and the casing shoe.
引鞋和套管鞋都已接好。
Both the guide shoe and the casing shoe
have already been
connected.
我们正在接引鞋和套管鞋。
We are connecting the guide shoe and the
casing shoe.
61
、所有接头都要涂上螺纹脂。
All the joints should be
coated with thread compound.
所有接头都要涂上螺纹脂了吗?
Have all the joints been coated with thread
compound.
我们正在涂螺纹脂。
We are coating the joints with
thread compound.
62
、每隔一根套管下一
个扶正器。
Run a
centralizer every two joints of casing.
每隔一根套管下一个什么?
What to be run every two
joints of casing.
扶正器下在什么地方?
Where to connect the centralizer.
63
、除司钻外,其他人不许上钻台。
No one is allowed to be on
the rig floor except the driller.
还有谁在钻台上?
Who
else is on the rig floor now?
现在只有司钻在钻台上。
Only a driller is on the rig floor now.
p>
64
、固井水罐负责打水的人不许脱岗。
The person in charge of water
delivery for cementing water tank
is not allowed to leave his job.
谁负责固井水罐打水
?
Who is in charge of water delivery for
cementing water tank?
65
、卸
水泥头及管汇后,将井口拉正。
Put the
wellhead in right place after removing the
cementing
head and manifold.
井口拉正了没有?
Is
the wellhead in right place?
66
、关全封闭闸板。
Close the blind ram.
全封闭闸板关闭了没有?
Have you closed the blind ram?
全封闭闸板还没有关闭。
The blind ram is not closed.
67
、要求
5
分钟不卸压。
It is required to keep
pressure for 5 minutes.
压力要保持多少分钟?
How many minutes is it required to keep
the pressure for?
68
、打开半封,试各压井阀。
Open the pipe ram and test
all the valves for killing.
半封打开了吗?可以试阀门了吗?
Is the pipe ram opened? Can I test valves
now?
69
、所有试压都合格。
All the tests are acceptable.
试压都合格了吗?
Are
all the tests acceptable but this one.
除了这个阀门,都合格了。
All the tests are acceptable but this one.
70
、将方钻杆提出钻盘面。
Lift the kelly out from rotary
table.
方钻杆提出钻盘面了吗?
Is the kelly out from rotary
table?
71
、今后井喷以此压力为关井和压井的依据。
This pressure will
be the basis for well shut in and killing
in case blowing out.
这个压力用来干什么?
What is this pressure used for?
井涌时多大压力下压井?
What is the pressure for well killing in
case kick out?
72
、要仔细地清洗和丈量套管。
Clean and measure the casing
carefully.
5
套管已清洗和丈量完毕。
The casing cleaning and measurement are
completed.
73
、下表层套管时,每
5
根套管灌满一次泥浆。
Fill up with mud every 5 joints of casing
when running surface
Have you
notified for water supply?
没有水,要停钻了。
There is no water, we have to stop
drilling.
80
、要按照规定参数钻进。
casing.
74
、钻进一米后,停泵。
Shut down the pump after one
meter drilled.
钻多少米以后停钻?
How many meters have to be
drilled before pump shut down?
泵已经停下。
The
pump is stopped.
75
、请配合测井人员吊仪器。
Please assist the logging crew
to lift logging tools.
76
、注意安全,不要蛮干。
Ensure safety in operation and
don't act rashly.
安全第一。
Safety first.
77
、要使用安全可靠的绳套。
Use safety and reliable rope
socket.
这个绳套不可靠。
This rope socket is not reliable.
78
、吊重物一定要有牵引绳。
Be sure to use guideline when
lift any weights.
停下,没有牵引绳不许起吊。
Stop, don't lift without guideline.
79
、井上水已用光,请通知送水。
Water has been run out on the
well site. Please notify for
water
supply.
你通知送水了吗?
6
Drill with parameters
as required.
你没按规定参数钻进。
You didn't drill with parameters
as required.
你按规定参数钻进了吗?
Have you drilled with parameters
as required?
81
、第一次起钻时,要注意防
卡及拔活塞。
When
the
first
time
to
pull
out
the
pipe
from
the
hole,
attention should be paid to
sticking and forced pulling.
注意!
Attention!
Take care!
82
、泥浆性能如有变化,及时报告泥浆工程师。
Tell
the mud engineer in time if mud property
changed.
我已经告诉泥浆工程师。
I've told the mud engineer.
83
、违者将被开除。
Violator will be dismissed.
他没有违反规定。
He
didn't violate any rule.
84
、记录上要标明排量和钻压。
The pump rate and weight on
the bit should be indicated in
the record.
记录上有排量吗?
Is
the pump rate indicated in the record?
记录上没有标明排量。
The pump rate isn't indicated in the
record.
85
、吊臂旋转半径下,禁止人行走。
Walking under the rotation
radius of crane boom is prohibited.
86
、咱们得想办法把气引到那边的土坑去。
We have to try to get the gas
to the open pit over there.
试一试。
Try it.
87
、钻台上已无法工作,请指示。
We can't do any drilling on
the rig floor now, please give
your instruction.
钻台上为什么没动静?
Why
stop the operation on the rig floor?
88
、这些材料要注意防潮和防晒。
These
materials
have
to
be
prevented
against
moisture
and
sunshine.
把这些材料放在安全的地方。
Put these materials in a safety place.
89
、把打捞工具准备好,这一班可能要打捞作业。
Get
the
fishing
tools
ready,
this
shift
is
expected
to
do
fishing.
这一班可能打捞吗?
Is
this shift expected to do fishing?
90
、我估计是钻头磨光了。
I think that the bit's gone.
我不清楚,可能钻头磨光了。
I'm not sure. Maybe the bit's gone.
91
、上一班刚换完的钻头。
It was changed last shift.
什么时候换的钻头?
When
did you change the bit?
92
、给我把泥浆工叫来,快点。
Get me the mud man , quickly.
给我把井架工叫来,不是泥浆工。
Get me the derrick man, not the mud man.
93
、井眼有点遇阻。
The hole is getting tight.
遇阻了?泥浆怎么样?
Tight? How is the mud?
94
、泥浆返回时间有多长?
What's the bottoms up?
大约一个小时。
About
an hour.
95
、过三个小时再看吧。
We'll give it three hours and
see.
我觉得三小时太长了。
I think that three hours are too long.
96
、已起完钻,把钻杆都排放好了。
We've pulled out and stacked
the pipe.
钻杆都排放好了吗?
Has the pipe been stacked?
97
、将方钻杆放在鼠洞里。
Set the kelly in the rathole.
要把方钻杆放在哪里?
Where to set the kelly?
98
、大班正在打捞落鱼,那是一个牙轮。
The
toolpusher is fishing a cutter.
大班在干什么呢?
What
is the toolpusher doing?
7
打捞的是什么?
What
is it to be finished?
99
、发电机没有问题。
There is nothing wrong with the
generator.
发电机有点毛病。
Something wrong with the
generator.
止回阀
check valve
钻链
collar
牙轮
cone
岩心
,
取心
core
接箍
coupling
转换接头
crossover sub
100
、我看不用担心了。继续钻吧。
I don't think we have to
worry, let's go ahead to make hole.
我担心泥浆有问题。
I worry about the mud.
不用担心。
Don't worry.
常用词汇
储能器
accumulator
锚
anchor
环空
annular
卸开
,
倒扣
back off
提环
bail
捞筒
bailer
弯接头
bent sub
防喷器
blowout
preventer
母接头
box
刹车
brake
卸开
breakout
桥塞
bridge
plug
电缆
,
绳索
cable
猫头
cathead
猫头绳
cat
line
链钳
chain
tong
8
天车
crown block
旋流除砂器
cyclone
死绳
dead line
除气器
degasser
井架
derrick
除砂器
desander
除泥器
desilter
绞车
drawworks
通径规
drift gauge
滚筒
drum
吊卡
elevator
吊环
elevator links
外加厚
external upset
快绳
fast line
返出管线
flow line
基础
foundation
天车人字架
gin
pole
横拉筋
girder
大钩
hook
水龙带
hose
液压大钳
hydraulic
tongs
千斤顶
jack
震击器
jar
金属小落物
junk
打捞篮
junk basket
方钻杆补心
kelly bushing
衬管
liner
活绳
live line
井位
location
筛布
screen
cloth
振动筛
shaker
卡瓦
slip
固相控制
solid control
废浆
spent mud
旋接器
spinner
井漏
lost
circulation
上扣
make up
大方补心
master bushing
筛号
,
目
mesh
小鼠洞
mouse
hole
钻井泵
mud
pump
泥浆防溅盒
mud
saver
喷嘴
nozzle
接头
,
销子
pin
管架
pipe
rack
立根盒
pipe
setback
泥浆池
pit
泵缸套
pump liner
二层平台
racking board
防喷器芯子
ram
鼠洞
rat hole
扩孔器
reamer
异径接头
reducing
nipple
安全阀
relief
valve
停钻时间
rig
downtime
轮钻牙头
roller bit
转盘
rotary
一次起下钻
round
trip
旋绳
spinning line
四通
spool
入扣
stab
立柱
stand
立管
stand pipe
水龙头
swivel
螺纹
thread
节流管汇
throttle
manifold
套管回接
tie
back
工具房
toolhouse
钻杆接头
tool
joint
扭矩表
torque
gauge
建井周期
total
well time
游动滑车
travelling block
涡轮钻具
turbodrill
上返时间
up-
hole time
套洗
washover
指重表
weight indicator
绳索
,
钢丝绳
wireline
现场常用英语
1
00
句
EVERYDAY
ENGLISH 100
1
、
(检
疫关卡)请出示黄皮书(健康证明书)
。
Please
show me your yellow paper (health
certificate).
9
unisex-umr
unisex-umr
unisex-umr
unisex-umr
unisex-umr
unisex-umr
unisex-umr
unisex-umr
-
上一篇:外贸中常见的英文缩写
下一篇:中英服装尺寸对照表