关键词不能为空

当前您在: 主页 > 英语 >

unisex炼化英语词汇

作者:高考题库网
来源:https://www.bjmy2z.cn/gaokao
2021-01-28 13:01
tags:

unisex-umr

2021年1月28日发(作者:scene)


钻井作业英语


100




DRILLING OPERATION ENGLISH 100



1




钻机已安装完毕。



The rigging up is finished.


2




现在开始检查和调试钻机。



Let's start to check and test the rig.



钻机还没检查调试呢。



The rig isn't checked and tested.


3




所有操作都应该按正规程序进行。



All the operation should be done per normal procedures.


4


、不戴安全帽不许上钻台工作。



It is not allowed to work on the rig floor without helmet on.


5


、上井架工作必须系好安全带。



The safety belt should be fastened when working on the derrick..



你系好安全带了吗?



Has you safety belt been fastened?


6


、上班前不许喝酒。



Wine drinking is not allowed before going to work.


7


、大 约下午


1:00


可以开钻。



Spud in will begin at about one o'clock in the afternoon.


8


、一开采用钻速


160


,钻压

< br>2


千磅。



For the first spud in ,penetration rate is 160 and weight on


the


bit is two thousand pounds.



钻速多大?



What is the penetration rate?



钻压不到二千磅。



The weight on the bit is less than two thousand pounds.


9


、开双泵,泵冲< /p>


100


,泵压


6


兆帕。



Use both pumps with 100 strokes per minute and pressure of 6


MPa.



开双泵吗?



Shall we use both pumps ?


10


、打完 单根划眼一次,直到打完一开。



Do a dummy trip after single joint drilling until the first


spud in finished.


11


、循环一个半小时再起钻。



Circulate for one and half hours before pulling out.


循环多长时间再起钻?



How long to circulate before pulling out?



不用循环。



No need to circulate.


12


、如有特殊情况,要马上报告。



Report at once if any unusual case occurred.


13


、下钻要控制下放速度。



Control the running speed when going in the hole.


14


、当心顿钻和伤人。



Be careful not to make free fall and hurt anyone.


15


、如遇阻,不许硬压。



Don't force to run in with too more weight for a tight hole.


遇阻了,怎么办?



What can I do? The hole is getting tight.


16


、观察振动筛有无跑泥浆现象。



See if any mud overflow on the screen.



振动筛跑泥浆了。



There is an overflow screen.


17


、现在需要马上换筛布。



We need to change the screen at once.


1


要换筛布吗?



Is the screen to be changed?


不用换筛布。



The screen needn't changing.


18


、认真作好记录。



Record it carefully.


19


、不许作假资料。



Don't make false record.


这资料有假。



It's a false record.


20


、每钻进


100


米测斜一次。



Do a deviation survey every 100metre interval.


钻多深测一次井斜?



What's the interval between deviation surveys?


21


、勤活动钻具。



Move the drill string frequently.


22


、将测斜结果及时汇报监督。



The result of deviation survey has to informed to supervisor in


time.


已经将测斜结果报告监督了。



The



supervisor



has



already



been



informed



about



the



survey


result.


23


、扭矩不要过大。



Don't apply excessive torque.


扭矩太大。



The torque is excessive.


24


、不许强提。



No forced pulling out is allowed.


25


、已经提放多次,未见效果。



The string has been moved up and down several times,but it


doesn't work.


26


、接方钻杆,倒划眼。



Connect kelly and do a backreaming.


不要接方钻杆。



Don't connect the kelly.


27


、在钻杆上作卡点记号。



Make a mark for sticking point on the drill pipe.



在钻杆上作卡点记号了吗?



Is the drill pipe marked for sticking point.


28


、当心扭断钻具。



Be careful not to twist off the drill string.


29


、未得到监督的许可,不许乱来。



Don't act at your disposal without supervisor's consent.



我事先已得到监督的同意。



I've got the prior consent from supervisor already.


30


、下钻时,不许用钻盘上扣。



Don't make up by rotary table while running in.



下钻时,我从来不用钻盘上扣。



I've never made up by rotary table while running in.


31


、用双钳紧扣。



Make up and tighten by both tongs.


32


、对所有防范措施作一次检查。



Check all the precaution measures.



检查完毕,未发现问题。



Check finished and no problem found.


33


、做一次防喷演习。



Do a blow out prevention exercise.


34


、按深度,现在快接近油气层了。



2


It approaches the pay zone based on depth.



根据深度,离油气层还远呢。



It is far away from the pay zone based on depth.


35


、作好正常排量三分之一的泵压记录。



Make a record of pump pressure at one third of normal rate.


36


、作好压井准备。



Get ready to kill the well.



有必要压井吗?



Is it necessary to kill the well.


37


、该更换刹车片了。



The brake blocks need to be changed.



要换刹车片吗?



Need the brake blocks to be changed?


38


、每起钻


20


柱,要核对泥浆的升降情 况。



Check the fluctuation of mud level whenever 20 string pulled


out.



有泥浆升降变化吗?



Is there any fluctuation of mud level?



未见有升降变化。



No fluctuation found.


39


、这样下去,要扣你们的日费。



Your day rate will be deducted in such a case.



为什么要扣日费?



Why to deduct our day rate?


40

、日保养时间不得超过


15


分钟。



The daily maintenance will be done for less than 15 minutes.


15


分钟之内做不完保养。



The maintenance can not be done within 15 minutes.


41


、现需加大钻压。



The weight on the bit has to be increased now.



钻压加大了吗?



Has the weight on the bit been increased?


42


、井下出现复杂情况,不要离开钻台。



There is some trouble in the borehole. Don't leave the rig


floor.


43


、我们在等措施和检修设备。



We


are


waiting



for


the



completion


of


service


and



equipment


maintenance.



准备好,措施和检修已完成。



Get ready. The service and maintenance have completed.


44


、将二开钻具下到水泥塞处。



Run the string for the second spud in to the cement pulg.



等等,先不要下二开钻具。



Wait, do not run the string for the second spud in now.


45


、井下已畅通无阻。



The borehole is in real good shape.



井下情况怎么样?



How is the borehole now?


46


、请帮我将泥浆罐清洗干净。



Please help me to clean the mud tank.


47


、罐内放满水后,配泥浆。



Fill up the tank with water, then prepare the mud.



罐里灌满水了吗?



Is the tank filled up with the water?



罐里还没灌满水呢。



The tank isn't filled up with water yet.


48


、安装井口时,上紧各螺丝。



Tighten all the screws when installing the wellhead.


3



这个螺丝还没上紧。



This screw isn't tightened.


49


、看看井口有没有泄漏现象。



See if there is any leakage on the wellhead.



井口上没有泄漏。



There is no leakage on the wellhead.



井口上有泄漏。



There is some leakage on the wellhead.


50


、把这些工具整理好。



Put these tools in good order.


51


、不要把这些工具放在这儿。



Don't put these tools here.



把这些工具放在这里。



Put these tools here.


52


、这台机器运转时有杂音。



There is a noise while this machine is running.



这台机器运转时没有杂音。



There is no noise while this machine is running.



这台机器运转时有杂音吗?



Is there any noise while this machine is running?


53


、应当停车,检查原因。



We have to shut down it to check the cause.



需要停车查原因吗?



Should we shut down it to check the cause?


54


、泵压忽高忽低,该怎么办?



The pump pressure is fluctuating, what can I do?


55

< p>
、必须马上起钻,弄清楚怎么回事。



The string has to be pull out at once to see what's wrong.



出什么事了?



4


What's wrong?


56


、现在下钻。



Run the string in the hole now.



现在下钻了吗?



Shall we run the string in the hole now?


57


、开始打循环。



Start the circulation.



开始打循环吗?



Shall we start the circulation?



先别开始。



Don't start now.


58


、接单根。



Make a connection.



接单根吗?



Shall we make a connection.


59


、开始卸扣。



Start to break out the pipe.



开始卸扣吗?



Shall we start to break out the pipe?


60


、先接好引鞋和套管鞋。



First, connect the guide shoe and the casing shoe.



引鞋和套管鞋都已接好。



Both the guide shoe and the casing shoe have already been


connected.


我们正在接引鞋和套管鞋。



We are connecting the guide shoe and the casing shoe.


61


、所有接头都要涂上螺纹脂。



All the joints should be coated with thread compound.



所有接头都要涂上螺纹脂了吗?



Have all the joints been coated with thread compound.


我们正在涂螺纹脂。



We are coating the joints with thread compound.


62


、每隔一根套管下一



个扶正器。



Run a centralizer every two joints of casing.



每隔一根套管下一个什么?



What to be run every two joints of casing.


扶正器下在什么地方?



Where to connect the centralizer.


63


、除司钻外,其他人不许上钻台。



No one is allowed to be on the rig floor except the driller.



还有谁在钻台上?



Who else is on the rig floor now?


现在只有司钻在钻台上。



Only a driller is on the rig floor now.


64


、固井水罐负责打水的人不许脱岗。



The person in charge of water delivery for cementing water tank


is not allowed to leave his job.


谁负责固井水罐打水


?


Who is in charge of water delivery for cementing water tank?


65


、卸 水泥头及管汇后,将井口拉正。



Put the wellhead in right place after removing the cementing


head and manifold.


井口拉正了没有?



Is the wellhead in right place?


66


、关全封闭闸板。



Close the blind ram.


全封闭闸板关闭了没有?



Have you closed the blind ram?


全封闭闸板还没有关闭。



The blind ram is not closed.


67


、要求


5


分钟不卸压。



It is required to keep pressure for 5 minutes.


压力要保持多少分钟?



How many minutes is it required to keep the pressure for?


68


、打开半封,试各压井阀。



Open the pipe ram and test all the valves for killing.


半封打开了吗?可以试阀门了吗?



Is the pipe ram opened? Can I test valves now?


69


、所有试压都合格。



All the tests are acceptable.


试压都合格了吗?



Are all the tests acceptable but this one.


除了这个阀门,都合格了。



All the tests are acceptable but this one.


70


、将方钻杆提出钻盘面。



Lift the kelly out from rotary table.


方钻杆提出钻盘面了吗?



Is the kelly out from rotary table?


71


、今后井喷以此压力为关井和压井的依据。



This pressure will be the basis for well shut in and killing


in case blowing out.


这个压力用来干什么?



What is this pressure used for?


井涌时多大压力下压井?



What is the pressure for well killing in case kick out?


72


、要仔细地清洗和丈量套管。



Clean and measure the casing carefully.


5


套管已清洗和丈量完毕。



The casing cleaning and measurement are completed.


73


、下表层套管时,每


5


根套管灌满一次泥浆。



Fill up with mud every 5 joints of casing when running surface


Have you notified for water supply?


没有水,要停钻了。



There is no water, we have to stop drilling.


80


、要按照规定参数钻进。



casing.


74


、钻进一米后,停泵。



Shut down the pump after one meter drilled.


钻多少米以后停钻?



How many meters have to be drilled before pump shut down?


泵已经停下。



The pump is stopped.


75


、请配合测井人员吊仪器。



Please assist the logging crew to lift logging tools.


76


、注意安全,不要蛮干。



Ensure safety in operation and don't act rashly.


安全第一。



Safety first.


77


、要使用安全可靠的绳套。



Use safety and reliable rope socket.


这个绳套不可靠。



This rope socket is not reliable.


78


、吊重物一定要有牵引绳。



Be sure to use guideline when lift any weights.


停下,没有牵引绳不许起吊。



Stop, don't lift without guideline.


79


、井上水已用光,请通知送水。



Water has been run out on the well site. Please notify for


water supply.


你通知送水了吗?



6


Drill with parameters as required.


你没按规定参数钻进。



You didn't drill with parameters as required.


你按规定参数钻进了吗?



Have you drilled with parameters as required?


81


、第一次起钻时,要注意防 卡及拔活塞。



When



the



first



time



to



pull



out



the



pipe



from



the



hole,


attention should be paid to sticking and forced pulling.


注意!



Attention!


Take care!


82


、泥浆性能如有变化,及时报告泥浆工程师。



Tell the mud engineer in time if mud property changed.


我已经告诉泥浆工程师。



I've told the mud engineer.


83


、违者将被开除。



Violator will be dismissed.


他没有违反规定。



He didn't violate any rule.


84


、记录上要标明排量和钻压。



The pump rate and weight on the bit should be indicated in


the record.


记录上有排量吗?



Is the pump rate indicated in the record?


记录上没有标明排量。



The pump rate isn't indicated in the record.


85


、吊臂旋转半径下,禁止人行走。



Walking under the rotation radius of crane boom is prohibited.

86


、咱们得想办法把气引到那边的土坑去。



We have to try to get the gas to the open pit over there.


试一试。



Try it.


87


、钻台上已无法工作,请指示。



We can't do any drilling on the rig floor now, please give


your instruction.


钻台上为什么没动静?



Why stop the operation on the rig floor?


88


、这些材料要注意防潮和防晒。



These



materials



have



to



be



prevented



against



moisture



and


sunshine.


把这些材料放在安全的地方。



Put these materials in a safety place.

< p>
89


、把打捞工具准备好,这一班可能要打捞作业。



Get



the



fishing



tools



ready,



this



shift



is



expected



to



do


fishing.


这一班可能打捞吗?



Is this shift expected to do fishing?


90


、我估计是钻头磨光了。



I think that the bit's gone.


我不清楚,可能钻头磨光了。



I'm not sure. Maybe the bit's gone.


91


、上一班刚换完的钻头。



It was changed last shift.


什么时候换的钻头?



When did you change the bit?


92


、给我把泥浆工叫来,快点。



Get me the mud man , quickly.


给我把井架工叫来,不是泥浆工。



Get me the derrick man, not the mud man.


93


、井眼有点遇阻。



The hole is getting tight.


遇阻了?泥浆怎么样?



Tight? How is the mud?


94


、泥浆返回时间有多长?



What's the bottoms up?


大约一个小时。



About an hour.


95


、过三个小时再看吧。



We'll give it three hours and see.


我觉得三小时太长了。



I think that three hours are too long.


96


、已起完钻,把钻杆都排放好了。



We've pulled out and stacked the pipe.


钻杆都排放好了吗?



Has the pipe been stacked?


97


、将方钻杆放在鼠洞里。



Set the kelly in the rathole.


要把方钻杆放在哪里?



Where to set the kelly?


98

、大班正在打捞落鱼,那是一个牙轮。



The toolpusher is fishing a cutter.


大班在干什么呢?



What is the toolpusher doing?


7


打捞的是什么?



What is it to be finished?


99


、发电机没有问题。



There is nothing wrong with the generator.


发电机有点毛病。



Something wrong with the generator.


止回阀


check valve


钻链


collar


牙轮


cone


岩心


,


取心


core


接箍


coupling


转换接头


crossover sub


100


、我看不用担心了。继续钻吧。



I don't think we have to worry, let's go ahead to make hole.



我担心泥浆有问题。



I worry about the mud.



不用担心。



Don't worry.



常用词汇



储能器


accumulator



anchor


环空


annular


卸开


,


倒扣


back off


提环


bail


捞筒


bailer


弯接头


bent sub


防喷器


blowout preventer


母接头


box


刹车


brake


卸开


breakout


桥塞


bridge plug


电缆


,


绳索


cable


猫头


cathead


猫头绳


cat line


链钳


chain tong


8


天车


crown block


旋流除砂器


cyclone


死绳


dead line


除气器


degasser


井架


derrick


除砂器


desander


除泥器


desilter


绞车


drawworks


通径规


drift gauge


滚筒


drum


吊卡


elevator


吊环


elevator links


外加厚


external upset


快绳


fast line


返出管线


flow line


基础


foundation


天车人字架


gin pole


横拉筋


girder


大钩


hook


水龙带


hose


液压大钳


hydraulic tongs


千斤顶


jack


震击器


jar


金属小落物


junk


打捞篮


junk basket


方钻杆补心


kelly bushing


衬管


liner


活绳


live line


井位


location


筛布


screen cloth


振动筛


shaker


卡瓦


slip


固相控制


solid control


废浆


spent mud


旋接器


spinner


井漏


lost circulation


上扣


make up


大方补心


master bushing


筛号


,



mesh


小鼠洞


mouse hole


钻井泵


mud pump


泥浆防溅盒


mud saver


喷嘴


nozzle


接头


,


销子


pin


管架


pipe rack


立根盒


pipe setback


泥浆池


pit


泵缸套


pump liner


二层平台


racking board


防喷器芯子


ram


鼠洞


rat hole


扩孔器


reamer


异径接头


reducing nipple


安全阀


relief valve


停钻时间


rig downtime


轮钻牙头


roller bit


转盘


rotary


一次起下钻


round trip


旋绳


spinning line


四通


spool


入扣


stab


立柱


stand


立管


stand pipe


水龙头


swivel


螺纹


thread


节流管汇


throttle manifold


套管回接


tie back


工具房


toolhouse


钻杆接头


tool joint


扭矩表


torque gauge


建井周期


total well time


游动滑车


travelling block


涡轮钻具


turbodrill


上返时间


up- hole time


套洗


washover


指重表


weight indicator


绳索


,


钢丝绳


wireline



现场常用英语


1 00




EVERYDAY ENGLISH 100


1



(检 疫关卡)请出示黄皮书(健康证明书)



Please show me your yellow paper (health certificate).


9


unisex-umr


unisex-umr


unisex-umr


unisex-umr


unisex-umr


unisex-umr


unisex-umr


unisex-umr



本文更新与2021-01-28 13:01,由作者提供,不代表本网站立场,转载请注明出处:https://www.bjmy2z.cn/gaokao/579574.html

炼化英语词汇的相关文章