关键词不能为空

当前您在: 主页 > 英语 >

讨论区隧道翻译

作者:高考题库网
来源:https://www.bjmy2z.cn/gaokao
2021-01-28 01:27
tags:

讨论区-断层线

2021年1月28日发(作者:驱逐令)


NATM tunnel design principle in the construction of major and


Construction Technology




NATM Design Principle



design


and


construction


of


two


major


theoretical


and


development


process



Since the 20th century, human space on the ground floor of the growing demand,


thus the underground works of the study of a rapid development. In a large number of


underground


engineering


practice,


it


is


generally


recognized


that


the


tunnel


and


underground


cavern


project,


the


core


of


the


problem,


all


up


in


the


excavation


and


retaining


two


key


processes.


How


excavation,


it


will


be


more


conducive


to


the


stability


and


cavern


facilitate


support


:


For


more


support,


Supporting


how


they


can


more


effectively


ensure


stability


and


facilitate


the


cavern


excavation.


This


is


the


tunnels


and


underground


works


two


promote


each


other


and


check


each


other's


problems.



Tunnels


and


underground


caverns,


and


focusing


on


the


core


issues


with


the


above


practice


and


research,


in


different


periods,


People


of


different


theories


and


gradually established a


system of different theories, Each system


includes


theory and


resolve


(or


are


studying


the


resolution)


from


the


works


of


understanding


(concept),


mechanics, engineering


measures


to


the construction


methods (Technology), a series


of engineering problems.



A


theory


of


the


20th


century


the


1920s


the


traditional



relaxation


theory.


Its


core


content


is


:


a


stable


rock


self-stability,


no


load


:


unstable


rock


may


have


collapsed.


need


shoring


structure


to


be


supported.


Thus,


the


role


of


the


supporting


structure


of


the


rock


load


is


within


a


certain


range


may


be


due


to


relaxation


and


collapse


of


rock


gravity.


This


is


a


traditional


theory,


and


their


representative


is


Taishaji


and


Principe's


and


others.


It


works


similar


to


the


surface


issues


of


the


thinking is still widely used to.



Another


theory


of


the


20th


century


made


the


1950s


the


modern


theory


of


timbering or


rock to their own self-stability


:


unstable rock


loss of stability


is a process, and


if this


process


in


providing


the


necessary


help


or


restrictions


will


still


be


able


to


enter


the


rock


steady


state.


This


theoretical


system


of


representative


characters


Labuxiweici,


Miller-Feiqieer,


Fenner


-


Daluobo


and


Kashitenai


others.


This


is


a


more


modern


theory,


it


is already out of


the


ground


works to consider


the


ideas, and


underground


works


closer


to


reality,


the


past


50


years


has


been


widely


accepted


and


applied.


demonstrated broad development prospects.



Can be seen from the above, the former theory more attention to the findings and


the


results


of


treatment


:


The


latter


theory


is


even


more


attention


to


the


process


and


the control of the process, right from the rock for the full utilization of capacity


. Given


this


distinction,


which


both


theory


and


methods


in


the


process,


each


with


different


performance characteristics. NATM


theory


is


rock


for the


tunnel engineering practice


in the representation method.


2. NATM



NATM


that


the


new


Austrian


Tunneling


Method


short


the


original


is


in


New


Austrian


Tunneling


Method,


referred


to


as


the


NATM.


France


said


it


convergence


bound


or


some


countries


alleged


to


observe


the


dynamic


design


and


construction


of


the basic principles.



NATM the basic points can be summarized as follows :




1



. Rock tunnel structure is the main loading unit, the construction must fully


protect


the


rock,


it


minimize


the


disturbance


to


avoid


excessive


damage


to


the


intensity


of


rock.


To


this


end,


the


construction


of


sub-section


should


not


block


too


much,


excavation


should


be


used


smooth


blasting,


presplit


blasting


or


mechanical


tunneling.



2



. In order to give full play to rock the carrying capacity should be allowed to


control


and


rock


deformation.


While


allowing


deformation,


which


can


be


a


rock


bearing ring; The other hand, have to limit it, Rock is not so lax and excessive loss or


greatly reduced carrying capacity.



3



. In order to


improve the support structure,


the


mechanical properties,


the


construction should be closed as soon as possible, and to become a closed cylindrical


structure.


In


addition,


the


tunnel


shape


with


a


round


should,


as


far


as


possible,


to


avoid the corner of the stress concentration.




4



.


Construction


right


through


the


rock


and


supporting


the


dynamic


observation,


measurement,


and


reasonable


arrangements


for


the


construction


procedures, changes in the design and construction management of the day-to-day.




5



.


To


lay


waterproof


layer,


or


is


subject


to


bolt


corrosion,


deterioration


of


rock properties,


rheological, swelling caused by the


follow-up


to


load,


use composite


lining.




6



. Lining


in principle, and


the early rock deformation Supporting


the basic


stability


of


the


conditions


under


construction.


rock


and


supporting


structure


into


a


whole, thereby improving the support system of security.



NATM


above


the


basic


elements


can


be


briefly


summarized


as


:



disturbance, early spray anchor, ground measurements, closed tight.


3




Points



1



.


Rock


cavern


excavation


is


affected


by


that


part


of


rock


(soil)


body,


the


rock is a trinity : have a load bearing structure, building materials.




2



.


Tunnel


construction


is


in


the


rock


stress


is


of


special


architectural


environment, which can not be equated with the construction on the ground.




3



. Tunnel structure rock + = bracing system.


II. The new Austrian highway construction in the basic method


NATM


one


of


the


characteristics


is


the


scene


monitoring,


measurement


information


to


guide


construction,


through


the


tunnel


construction


measure


receipts


and


excavation


of


the


geological


observation


for


prediction


and


feedback.


And


in


accordance


with


the


established


benchmark


for


measuring


the


tunnel


construction,


excavation


section


steps


and


sequences,


Supporting


the


initial


parameters


for


reasonable adjustments to guarantee the safety of construction, a tunnel rock stability,


the


quality


of


the


project


and


supporting


structure


of


the


economy


and


so


on.


The


author


of


commitments


(Chengde)


Chek


(Chifeng)


East


Maojingba


Tunnel


NATM


basic


construction


method


for


investigation


concluded,


synthesis


of


a


new


highway


tunnel


Natm


the


selection


of


different


types


and


the


basic


characteristics


of


the


construction methods and tips.



1. A tunnel construction


method of choice tunnel construction


method of choice,


mainly


based


on


the


engineering


geological


and


hydrogeological


conditions


Construction, rock


type, buried deep tunnel, the


tunnel section size and


length


lining


types, Construction should be the premise of safety and engineering quality at the core,


and


with


the


use


of


the


tunnel


function,


the


level


of


construction


technology,


Construction


machinery


and


equipment,


time


requirements


and


economic


feasibility


of factors to consider in selection.



2.


New


Austrian


Tunneling


Method


program


New


Austrian


Tunneling


Method


used all methods can be divided into sections, Division level and the three major types


of excavation method and some changes in the program.


(1)


Full-face


method.


That


whole


section


excavation


method


is


based


on


the


design


of


an


excavation


face


excavation


molding.


Excavation


order


is


its


full


face


excavation, steel bracing, pouring concrete


lining. Often choose to IV-VI Class


Rock


Hard Rock Tunnel, which can be used blasting deep hole.


Excavation


whole


section


of


the


law


is


a


larger


space


operations,


introducing


supporting


large


mechanized operations,


improving


the speed and process


small,


less


interference and


facilitate


the construction organization and


management.


Excavation


is


due


to


shortcomings


in


the


larger,


lower


relative


stability


of


rock,


and


with


each


cycle of the relatively


large workload,


it requires the construction


units should


have a


strong excavation, transport and slag out and support capability, Maojingba VI : Class


V rock used in the full-face excavation to achieve the desired results.


Full- face excavation face, drilling and blasting construction more efficient use of


deep focus to accelerate the excavation blasting speed, and the rock blasting vibration


frequency


less conducive to a stable transfer


rocks.


The drawback


is every deep


hole


blasting


vibration


larger.


Therefore


require


careful


drilling


and


blasting


design


and


strict control of blasting operations.




Full-face


excavation


method


is


the


main


process


:


the


use


of


mobile


carts


(or


platforms),


the


first


full-face a bored,


and


installed a


line, and


then drilling


platform


car outside 50m back to a safe place and then detonate, Blasting to


make a shape out


after drilling Jardine car again moved to the excavation face in place, began a cycle of


drilling


and


blasting


operations,


Anchor


sprayed


simultaneously


supporting


or


after


the first arch wall lining.


(2) step


method. Step


method of design


is


generally divided


into sections on the


half- section


and


the


lower


half


section


two


excavation


molding.


Excavation


order


is


its


first


half excavation arch bolt


jet concrete bracing, arch


lining, the central


part of


the


second


half


of


excavation,


sidewall


of


excavation,


concrete


wall


jet


bolt


support


and


lining.


The


more


applicable


to


the


II,


III


and


soft


joint


development


of


the


surrounding rock, which were used Tim change program.


Long-step


method


:


The


next


stage


distance


away,


on


the


general


level


above


50m


ahead,


Construction


can


be


assigned


to


the


Department


of


next


larger


machine


with


parallel


operations,


when


mechanical


deficiencies


can


be


used


interchangeably.


When


the case of a


short


tunnel,


the


upper section


will be all dug


later, and then dug


under


the


section,


the


construction


of


which


less


interference,


single


process


can


work.


Short


step


method


:


on


the


stage


length


5-50m


apply


to



,




rock


can


be


shortened Invert closing time, Supporting


improve early stress conditions, but


larger


construction


interference,


in


the


event


of


Soft


Rock


need


to


consider


carefully,


Auxiliary


shall


be


applied


measures


to


stabilize


the


excavation


excavation


face,


in


order to ensure the safety of construction.



Ultrashort


step


method


:


The


only


step


ahead


3-5m,


section


closed


faster.


The


method


used


for the


high


level of


mechanization of


various rock section,


in the event


of


the siege soft rock when required careful consideration.


Auxiliary shall be applied


measures


to


stabilize


the


construction


excavation


face


to


ensure


the


safety


of


construction.



Excavation


level


of


character


is


the


first


step


to


using


light


excavation


drilling


machine drill a


hole, rather than through


large drilling platform car.


Two step


method


of excavation operations with sufficient space and a


faster rate of construction. Level


is


conducive


to


the


stability


of


excavation


face.


Especially


Excavation


in


the


upper,


lower operational safety. Three step method of excavation is the next shortcomings of


operations


interfere


with


each


other.


It


should


be


noted


at


the


bottom


of


the


upper


operational stability, level of excavation will increase the number of country rock.



(3)


Segment


excavation


method.


Excavation


Law


Division


can


be


divided


into


five changes in the program : Excavation Division level, from top to bottom hole lead,


heading advance on the excavation, single (double) and lateral pit method. Excavation


will


be


conducted


Section


Division


excavation


by


the


Ministry


of


shape,


and


to


advance some of excavation, it may be called derivative ahead excavation pit method.



Law


Division


level


:


general


application or soil collapse easily


lots of


soft rock,


with its advantages - stage method, height can be lengthened, the two-lane tunnel for a


hole-fold,


cycling


Road


Tunnel


-


hole


2


times;


rather


than


single


(double)


PENDANTS Heading a


high degree of


mechanization, can accelerate


the progress of


the projects.


The next heading advance excavation method (that is guided pit wall first arch) :


This


Act


applies


to



,




rock.


in


the


soft


ground


tunneling,


to


be


adopted


next


general


guide advance excavation pit wall


first arch Act. Its advantages are


: Heading


advance


excavation,


the


use


of


proven


geological


conditions


in


advance


to


facilitate


change


in


the


method.


Face


to


facilitate


started


procedures


applicable


to


the


labor


arrangements


for the


use of small


machinery and construction.


The drawbacks


:


The


next


section


will


guide


small,


slow


construction


and


construction


processes


more,


construction and management difficult.



Unilateral-arm


pit


Law


:


rock


instability,


the


tunnel


span


larger,


ground


subsidence


is


difficult


to


control


when


using


this


method.


Its


characteristics


are


:


a


positive step and arms Heading Act advantages.



Bilateral


arm


Heading


law


:


in


large-span


shallow


tunnels,


surface


subsidence


require strict, especially poor rock used. Advantages of this method are : Construction


of safe, reliable, but slow construction, high cost.




. Example projects



Built on loose sand gravel stratum of Beijing Subway allowed back of the tunnel


is


a


typical


example.


The


tunnel


is


located


in


the


main


street-256,


358m


long,


the


largest


excavation


section


9m


high,


14.5m


wide


coverage


stratigraphic


top


of


the


tunnel


only


minimum


thickness


9.0m.


Tunnel


boring


machine


of


excavation,


strengthen


the


grid


arch


shotcrete


initial


support


and


advance


small


catheter


care,

讨论区-断层线


讨论区-断层线


讨论区-断层线


讨论区-断层线


讨论区-断层线


讨论区-断层线


讨论区-断层线


讨论区-断层线



本文更新与2021-01-28 01:27,由作者提供,不代表本网站立场,转载请注明出处:https://www.bjmy2z.cn/gaokao/575941.html

隧道翻译的相关文章

  • 余华爱情经典语录,余华爱情句子

    余华的经典语录——余华《第七天》40、我不怕死,一点都不怕,只怕再也不能看见你——余华《第七天》4可是我再也没遇到一个像福贵这样令我难忘的人了,对自己的经历如此清楚,

    语文
  • 心情低落的图片压抑,心情低落的图片发朋友圈

    心情压抑的图片(心太累没人理解的说说带图片)1、有时候很想找个人倾诉一下,却又不知从何说起,最终是什么也不说,只想快点睡过去,告诉自己,明天就好了。有时候,突然会觉得

    语文
  • 经典古训100句图片大全,古训名言警句

    古代经典励志名言100句译:好的药物味苦但对治病有利;忠言劝诫的话听起来不顺耳却对人的行为有利。3良言一句三冬暖,恶语伤人六月寒。喷泉的高度不会超过它的源头;一个人的事

    语文
  • 关于青春奋斗的名人名言鲁迅,关于青年奋斗的名言鲁迅

    鲁迅名言名句大全励志1、世上本没有路,走的人多了自然便成了路。下面是我整理的鲁迅先生的名言名句大全,希望对你有所帮助!当生存时,还是将遭践踏,将遭删刈,直至于死亡而

    语文
  • 三国群英单机版手游礼包码,三国群英手机单机版攻略

    三国群英传7五神兽洞有什么用那是多一个武将技能。青龙飞升召唤出东方的守护兽,神兽之一的青龙。玄武怒流召唤出北方的守护兽,神兽之一的玄武。白虎傲啸召唤出西方的守护兽,

    语文
  • 不收费的情感挽回专家电话,情感挽回免费咨询

    免费的情感挽回机构(揭秘情感挽回机构骗局)1、牛牛(化名)向上海市公安局金山分局报案,称自己为了挽回与女友的感情,被一家名为“实花教育咨询”的情感咨询机构诈骗4万余元。

    语文